829 resultados para grid-connected operation
Resumo:
2, sect. 5
Resumo:
Sect. 1, Text
Resumo:
Sect. 2
Resumo:
Pt.2
Resumo:
1, sect. 5
Resumo:
The objective of this thesis is to compare and contrast environmental licensing systems, for the wood panel industry, in a number of countries in order to determine which system is the best from an environmental and economic point of view. The thesis also examines the impact which government can have on industry and the type of licensing system in operation in a country. Initially, the thesis investigates the origins of the various environmental licensing systems which are in operation in Ireland, Scotland, Wales, France, USA and Canada. It then examines the Environmental Agencies which control and supervise industry in these countries. The impact which the type of government (i.e. unitary or federal) in charge in any particular country has on industry and the Regulatory Agency in that country is then described. Most of the mills in the thesis make a product called OSB (Oriented Strand Board) and the manufacturing process is briefly described in order to understand where the various emissions are generated. The main body of the thesis examines a number of environmental parameters which have emission limit values in the licenses examined, although not all of these parameters have emission limit values in all of the licenses. All of these parameters are used as indicators of the potential impact which the mill can have on the environment. They have been set at specific levels by the Environmental Agencies in the individual countries to control the impact of the mill. Following on from this, the two main types of air pollution control equipment (WESPs and RTOs) are described in regard to their function and capabilities. The mill licenses are then presented in the form of results tables which compare air results and water results separately. This is due to the fact that the most significant emission from this type of industry is to air. A matrix system is used to compare the licenses so that the comparison can be as objective as possible. The discussion examines all of the elements previously described and from this it was concluded that the IPC licensing system is the best from an environmental and economic point of view. It is a much more expensive system to operate than the other systems examined, but it is much more comprehensive and looks at the mill as a whole rather than fragmenting it. It was also seen that the type of environmental licensing system which is in place in a country can play a role in the locating of an industry as certain systems were seen to have more stringent standards attached to them. The type of standard in place in a country is in turn influenced by the type of government which is in place in that country.
Resumo:
The research described in this thesis has been developed as a part of the Reliability and Field Data Management for Multi-component Products (REFIDAM) Project. This project was founded under the Applied Research Grants Scheme administered by Enterprise Ireland. The project was a partnership between Galway-Mayo Institute of Technology and Thermo King Europe. The project aimed to develop a system in order to manage the information required for reliability assessment and improvement of multi-component products, by establishing information flows within the company and information exchange with fleet users.
Resumo:
Multiproduct plants, Dynamic Optimization, Mixed Integer Linear/Non-Linear Programming, Scheduling
Resumo:
Despite the huge increase in processor and interprocessor network performace, many computational problems remain unsolved due to lack of some critical resources such as floating point sustained performance, memory bandwidth, etc... Examples of these problems are found in areas of climate research, biology, astrophysics, high energy physics (montecarlo simulations) and artificial intelligence, among others. For some of these problems, computing resources of a single supercomputing facility can be 1 or 2 orders of magnitude apart from the resources needed to solve some them. Supercomputer centers have to face an increasing demand on processing performance, with the direct consequence of an increasing number of processors and systems, resulting in a more difficult administration of HPC resources and the need for more physical space, higher electrical power consumption and improved air conditioning, among other problems. Some of the previous problems can´t be easily solved, so grid computing, intended as a technology enabling the addition and consolidation of computing power, can help in solving large scale supercomputing problems. In this document, we describe how 2 supercomputing facilities in Spain joined their resources to solve a problem of this kind. The objectives of this experience were, among others, to demonstrate that such a cooperation can enable the solution of bigger dimension problems and to measure the efficiency that could be achieved. In this document we show some preliminary results of this experience and to what extend these objectives were achieved.
Resumo:
Contribució al Seminari: "Les Euroregions: Experiències i aprenatges per a l’Euroregió Pirineus-Mediterrània", 15-16 de desembre de 2005
Resumo:
Contribució al Seminari: "Les Euroregions: Experiències i aprenatges per a l’Euroregió Pirineus-Mediterrània", 15-16 de desembre de 2005
Resumo:
GOAL: To evaluate the impact of the Ross operation, recently (1997) introduced in our unit, for the treatment of patients with congenital aortic valve stenosis. METHODS: The period from January 1997 to December 2000 was compared with the previous 5 years (1992-96). Thirty-seven children (< 16 yrs) and 49 young adults (16-50 yrs) with congenital aortic valve stenosis underwent one of these treatments: percutaneous balloon dilatation (PBD), aortic valve commissurotomy, aortic valve replacement and the Ross operation. The Ross operation was performed in 16 patients, mean age 24.5 yrs (range 9-46 yrs) with a bicuspid stenotic aortic valve, 7/10 adults with calcifications, 2/10 adults with previous aortic valve commissurotomy, 4/6 children with aortic regurgitation following PBD, and 1/6 children who had had a previous aortic valve replacement with a prosthetic valve and aortic root enlargement. RESULTS: PBD was followed by death in two neonates (fibroelastosis); all other children survived PBD. Although there were no deaths, PBD in adults was recently abandoned, owing to unfavourable results. Aortic valve commissurotomy showed good results in children (no deaths). Aortic valve replacement, although associated with good results (no deaths), has been recently abandoned in children in favour of the Ross operation. Over a mean follow-up of 16 months (2-40 months) all patients are asymptomatic following Ross operation, with no echocardiographic evidence of aortic valve regurgitation in 10/16 patients and with trivial regurgitation in 6/16 patients. CONCLUSIONS: The approach now for children and young adults with congenital aortic valve stenosis should be as follows: (1) PBD is the first choice in neonates and infants; (2) Aortic valve commissurotomy is the first choice for children, neonates and infants after failed PBD; (3) The Ross operation is increasingly used in children after failed PBD and in young adults, even with a calcified aortic valve.
Resumo:
El Port d'Informació Científica és un centre de Computació Grid de referència que dona suport a comunitats científiques, com el LHC (CERN). Al PIC, trobem una gran varietat de tecnologies que proporcionen serveis al centre. Des de l'arquitectura i elements de la xarxa, fins a recursos informàtics de computació, sistemes d'emmagatzematge a disc i cinta magnètica, bases de dades (ORACLE/PostgreSQL). El projecte consisteix en el disseny i implementació d'una base de dades col·lectora de tota la informació rellevant dels diferents sistemes del centre, i un portal web on mostrar tots els valors i gràfiques, tot basat en programari lliure.
Encountering Translation : Translational Historiography in the Connected History of India and Europe