933 resultados para delay of gratification
Resumo:
We investigate the spectrum of certain integro-differential-delay equations (IDDEs) which arise naturally within spatially distributed, nonlocal, pattern formation problems. Our approach is based on the reformulation of the relevant dispersion relations with the use of the Lambert function. As a particular application of this approach, we consider the case of the Amari delay neural field equation which describes the local activity of a population of neurons taking into consideration the finite propagation speed of the electric signal. We show that if the kernel appearing in this equation is symmetric around some point a= 0 or consists of a sum of such terms, then the relevant dispersion relation yields spectra with an infinite number of branches, as opposed to finite sets of eigenvalues considered in previous works. Also, in earlier works the focus has been on the most rightward part of the spectrum and the possibility of an instability driven pattern formation. Here, we numerically survey the structure of the entire spectra and argue that a detailed knowledge of this structure is important within neurodynamical applications. Indeed, the Amari IDDE acts as a filter with the ability to recognise and respond whenever it is excited in such a way so as to resonate with one of its rightward modes, thereby amplifying such inputs and dampening others. Finally, we discuss how these results can be generalised to the case of systems of IDDEs.
Resumo:
Temporal discounting (TD) matures with age, alongside other markers of increased impulse control, and coherent, self-regulated behaviour. Discounting paradigms quantify the ability to refrain from preference of immediate rewards, in favour of delayed, larger rewards. As such, they measure temporal foresight and the ability to delay gratification, functions that develop slowly into adulthood. We investigated the neural maturation that accompanies the previously observed age-related behavioural changes in discounting, from early adolescence into mid-adulthood. We used functional magnetic resonance imaging of a hypothetical discounting task with monetary rewards delayed in the week to year range. We show that age-related reductions in choice impulsivity were associated with changes in activation in ventromedial prefrontal cortex (vmPFC), anterior cingulate cortex (ACC), ventral striatum (VS), insula, inferior temporal gyrus, and posterior parietal cortex. Limbic frontostriatal activation changes were specifically associated with age-dependent reductions in impulsive choice, as part of a more extensive network of brain areas showing age-related changes in activation, including dorsolateral PFC, inferior parietal cortex, and subcortical areas. The maturational pattern of functional connectivity included strengthening in activation coupling between ventromedial and dorsolateral PFC, parietal and insular cortices during selection of delayed alternatives, and between vmPFC and VS during selection of immediate alternatives. We conclude that maturational mechanisms within limbic frontostriatal circuitry underlie the observed post-pubertal reductions in impulsive choice with increasing age, and that this effect is dependent on increased activation coherence within a network of areas associated with discounting behaviour and inter-temporal decision-making.
Resumo:
This paper analyzes the delay performance of Enhanced relay-enabled Distributed Coordination Function (ErDCF) for wireless ad hoc networks under ideal condition and in the presence of transmission errors. Relays are nodes capable of supporting high data rates for other low data rate nodes. In ideal channel ErDCF achieves higher throughput and reduced energy consumption compared to IEEE 802.11 Distributed Coordination Function (DCF). This gain is still maintained in the presence of errors. It is also expected of relays to reduce the delay. However, the impact on the delay behavior of ErDCF under transmission errors is not known. In this work, we have presented the impact of transmission errors on delay. It turns out that under transmission errors of sufficient magnitude to increase dropped packets, packet delay is reduced. This is due to increase in the probability of failure. As a result the packet drop time increases, thus reflecting the throughput degradation.
Resumo:
In 1967 a novel scheme was proposed for controlling processes with large pure time delay (Fellgett et al, 1967) and some of the constituent parts of the scheme were investigated (Swann, 1970; Atkinson et al, 1973). At that time the available computational facilities were inadequate for the scheme to be implemented practically, but with the advent of modern microcomputers the scheme becomes feasible. This paper describes recent work (Mitchell, 1987) in implementing the scheme in a new multi-microprocessor configuration and shows the improved performance it provides compared with conventional three-term controllers.
Resumo:
The time taken to consider development proposals within the English planning system continues to provoke great policy concern despite a decade of inquiry and policy change. The results of an extensive site-based survey and hedonic modelling exercise across 45 local authorities are reported here. The analysis reveals a slow, uncertain system. It identifies planning delay as a serious problem for housing supply and its ability to respond to increases in demand. Only a relatively limited set of factors seem relevant in explaining differences in times and the results suggest that 80% of councils’ performances are statistically indistinguishable from each other. These findings question the policy emphasis put on rankings of local authorities, though some influence from local politics is apparent. Development control is consistently a lengthy and uncertain process due to its complexity. Therefore, success in lowering planning delay is only likely through radical simplification.
Resumo:
The British system of development control is time-consuming and uncertain in outcome. Moreover, it is becoming increasingly overloaded as it has gradually switched away from being centred on a traditional ‘is it an appropriate land-use?’ type approach to one based on multi-faceted inspections of projects and negotiations over the distribution of the potential financial gains arising from them. Recent policy developments have centred on improving the operation of development control. This paper argues that more fundamental issues may be a stake as well. Important market changes have increased workloads. Furthermore, the UK planning system's institutional framework encourages change to move in specific directions, which is not always helpful. If expectations of increased long-term housing supply are to be met more substantial changes to development control may be essential but hard to achieve.
Resumo:
There is growing international interest in the impact of regulatory controls on the supply of housing The UK has a particularly restrictive planning regime and a detailed and uncertain process of development control linked to it. This paper presents the findings of empirical research on the time taken to gain planning permission for selected recent major housing projects from a sample of local authorities in southern England. The scale of delay found was far greater than is indicated by average official data measuring the extent to which local authorities meet planning delay targets. If these results are representative of the country as a whole, they indicate that planning delay could be a major cause of the slow responsiveness of British housing supply.
Resumo:
There is growing international interest in the impact of regulatory controls on the supply of housing. Most research focuses on the supply impacts of prescribed limits on land use but housing supply may also be affected by the process of planning monitoring and approval but this is hard to measure in detail. The UK has a particularly restrictive planning regime and a detailed and uncertain process of development control linked to it, but does offer the opportunity of detailed site-based investigation of planning delay. This paper presents the findings of empirical research on the time taken to gain planning permission for selected recent major housing projects in southern England. The scale of delay found was far greater than is indicated by average official data measuring the extent to which local authorities meet planning delay targets. Hedonic modelling indicated that there is considerable variation in the time it takes local authorities to process planning applications. Housing association developments are processed more quickly than those of large developers and small sites appear to be particularly time-intensive. These results suggest that delays in development control may be a significant contributory factor to the low responsiveness of UK housing supply to upturns in market activity.
Resumo:
The temporal variability of the atmosphere through which radio waves pass in the technique of differential radar interferometry can seriously limit the accuracy with which the method can measure surface motion. A forward, nested mesoscale model of the atmosphere can be used to simulate the variable water content along the radar path and the resultant phase delays. Using this approach we demonstrate how to correct an interferogram of Mount Etna in Sicily associated with an eruption in 2004-5. The regional mesoscale model (Unified Model) used to simulate the atmosphere at higher resolutions consists of four nested domains increasing in resolution (12, 4, 1, 0.3 km), sitting within the analysis version of a global numerical model that is used to initiate the simulation. Using the high resolution 3D model output we compute the surface pressure, temperature and the water vapour, liquid and solid water contents, enabling the dominant hydrostatic and wet delays to be calculated at specific times corresponding to the acquisition of the radar data. We can also simulate the second-order delay effects due to liquid water and ice.
Resumo:
In cooperative communication networks, owing to the nodes' arbitrary geographical locations and individual oscillators, the system is fundamentally asynchronous. This will damage some of the key properties of the space-time codes and can lead to substantial performance degradation. In this paper, we study the design of linear dispersion codes (LDCs) for such asynchronous cooperative communication networks. Firstly, the concept of conventional LDCs is extended to the delay-tolerant version and new design criteria are discussed. Then we propose a new design method to yield delay-tolerant LDCs that reach the optimal Jensen's upper bound on ergodic capacity as well as minimum average pairwise error probability. The proposed design employs stochastic gradient algorithm to approach a local optimum. Moreover, it is improved by using simulated annealing type optimization to increase the likelihood of the global optimum. The proposed method allows for flexible number of nodes, receive antennas, modulated symbols and flexible length of codewords. Simulation results confirm the performance of the newly-proposed delay-tolerant LDCs.