879 resultados para bureaucratic requirements
Resumo:
Consider the statement "this project should cost X and has risk of Y". Such statements are used daily in industry as the basis for making decisions. The work reported here is part of a study aimed at providing a rational and pragmatic basis for such statements. Of particular interest are predictions made in the requirements and early phases of projects. A preliminary model has been constructed using Bayesian Belief Networks and in support of this, a programme to collect and study data during the execution of various software development projects commenced in May 2002. The data collection programme is undertaken under the constraints of a commercial industrial regime of multiple concurrent small to medium scale software development projects. Guided by pragmatism, the work is predicated on the use of data that can be collected readily by project managers; including expert judgements, effort, elapsed times and metrics collected within each project.
Resumo:
A simple and practical technique for assessing the risks, that is, the potential for error, and consequent loss, in software system development, acquired during a requirements engineering phase is described. The technique uses a goal-based requirements analysis as a framework to identify and rate a set of key issues in order to arrive at estimates of the feasibility and adequacy of the requirements. The technique is illustrated and how it has been applied to a real systems development project is shown. How problems in this project could have been identified earlier is shown, thereby avoiding costly additional work and unhappy users.
Resumo:
Smooth flow of production in construction is hampered by disparity between individual trade teams' goals and the goals of stable production flow for the project as a whole. This is exacerbated by the difficulty of visualizing the flow of work in a construction project. While the addresses some of the issues in Building information modeling provides a powerful platform for visualizing work flow in control systems that also enable pull flow and deeper collaboration between teams on and off site. The requirements for implementation of a BIM-enabled pull flow construction management software system based on the Last Planner System™, called ‘KanBIM’, have been specified, and a set of functional mock-ups of the proposed system has been implemented and evaluated in a series of three focus group workshops. The requirements cover the areas of maintenance of work flow stability, enabling negotiation and commitment between teams, lean production planning with sophisticated pull flow control, and effective communication and visualization of flow. The evaluation results show that the system holds the potential to improve work flow and reduce waste by providing both process and product visualization at the work face.
Resumo:
Given the growing impact of human activities on the sea, managers are increasingly turning to marine protected areas (MPAs) to protect marine habitats and species. Many MPAs have been unsuccessful, however, and lack of income has been identified as a primary reason for failure. In this study, data from a global survey of 79 MPAs in 36 countries were analysed and attempts made to construct predictive models to determine the income requirements of any given MPA. Statistical tests were used to uncover possible patterns and relationships in the data, with two basic approaches. In the first of these, an attempt was made to build an explanatory "bottom-up" model of the cost structures that might be required to pursue various management activities. This proved difficult in practice owing to the very broad range of applicable data, spanning many orders of magnitude. In the second approach, a "top-down" regression model was constructed using logarithms of the base data, in order to address the breadth of the data ranges. This approach suggested that MPA size and visitor numbers together explained 46% of the minimum income requirements (P < 0.001), with area being the slightly more influential factor. The significance of area to income requirements was of little surprise, given its profile in the literature. However, the relationship between visitors and income requirements might go some way to explaining why northern hemisphere MPAs with apparently high incomes still claim to be under-funded. The relationship between running costs and visitor numbers has important implications not only in determining a realistic level of funding for MPAs, but also in assessing from where funding might be obtained. Since a substantial proportion of the income of many MPAs appears to be utilized for amenity purposes, a case may be made for funds to be provided from the typically better resourced government social and educational budgets as well as environmental budgets. Similarly visitor fees, already an important source of funding for some MPAs, might have a broader role to play in how MPAs are financed in the future. (C) 2007 Elsevier Ltd. All rights reserved.
Resumo:
Limit-feeding dry cows a high-energy diet may enable adequate energy intake to be sustained as parturition approaches, thus reducing the extent of negative energy balance after parturition. Our objective was to evaluate the effect of dry period feeding strategy on plasma concentrations of hormones and metabolites that reflect energy status. Multiparous Holstein cows (n = 18) were dried off 45 d before expected parturition, paired by expected calving date, parity, and previous lactation milk yield, and randomly assigned to 1 of 2 dry-period diets formulated to meet nutrient requirements at ad libitum or limited intakes. All cows were fed the same diet for ad libitum intake after parturition. Prepartum dry matter intake (DMI) for limit-fed cows was 9.4 kg/d vs. 13.7 kg/d for cows fed ad libitum. During the dry period, limit-fed cows consumed enough feed to meet calculated energy requirements, and ad libitum-fed cows were in positive calculated net energy for lactation (NEL) balance (0.02 vs. 6.37 Mcal/d, respectively). After parturition, milk yield, milk protein concentration, DMI, body condition score, and body weight were not affected by the prepartum treatments. Cows limit fed during the dry period had a less-negative calculated energy balance during wk 1 postpartum. Milk fat concentration and yield were greater for the ad libitum treatment during wk 1 but were lower in wk 2 and 3 postpartum. Plasma insulin and glucose concentrations decreased after calving. Plasma insulin concentration was greater in ad libitum-fed cows on d -2 relative to calving, but did not differ by dietary treatment at other times. Plasma glucose concentrations were lower before and after parturition for cows limit-fed during the dry period. Plasma nonesterified fatty acid concentrations peaked after parturition on d 1 and 4 for the limit-fed and ad libitum treatments, respectively, and were greater for limit-fed cows on d -18, -9, -5, and -2. Plasma tumor necrosis factor-alpha concentrations did not differ by treatment in either the pre- or postpartum period, but tended to decrease after parturition. Apart from a reduction in body energy loss in the first week after calving, limit feeding a higher NEL diet during the dry period had little effect on intake and milk production during the first month of lactation.
Resumo:
The shamba system involves farmers tending tree saplings on state-owned forest land in return for being permitted to intercrop perennial food crops until canopy closure. At one time the system was used throughout all state-owned forest lands in Kenya, accounting for a large proportion of some 160,000 ha. The system should theoretically be mutually beneficial to both local people and the government. However the system has had a chequered past in Kenya due to widespread malpractice and associated environmental degradation. It was last banned in 2003 but in early 2008 field trials were initiated for its reintroduction. This study aimed to: assess the benefits and limitations of the shamba system in Kenya; assess the main influences on the extent to which the limitations and benefits are realised and; consider the management and policy requirements for the system's successful and sustainable operation. Information was obtained from 133 questionnaires using mainly open ended questions and six participatory workshops carried out in forest-adjacent communities on the western slopes of Mount Kenya in Nyeri district. In addition interviews were conducted with key informants from communities and organisations. There was strong desire amongst local people for the system's reintroduction given that it had provided significant food, income and employment. Local perceptions of the failings of the system included firstly mismanagement by government or forest authorities and secondly abuse of the system by shamba farmers and outsiders. Improvements local people considered necessary for the shamba system to work included more accountability and transparency in administration and better rules with respect to plot allocation and stewardship. Ninety-seven percent of respondents said they would like to be more involved in management of the forest and 80% that they were willing to pay for the use of a plot. The study concludes that the structural framework laid down by the 2005 Forests Act, which includes provision for the reimplementation of the shamba system under the new plantation establishment and livelihood improvement scheme (PELIS) [It should be noted that whilst the shamba system was re-branded in 2008 under the acronym PELIS, for the sake of simplicity the authors continue to refer to the 'shamba system' and 'shamba farmers' throughout this paper.], is weakened because insufficient power is likely to be devolved to local people, casting them merely as 'forest users' and the shamba system as a 'forest user right'. In so doing the system's potential to both facilitate and embody the participation of local people in forest management is limited and the long-term sustainability of the new system is questionable. Suggested instruments to address this include some degree of sharing of profits from forest timber, performance related guarantees for farmers to gain a new plot and use of joint committees consisting of local people and the forest authorities for long term management of forests.
Resumo:
Requirements management (RM), as practised in the aerospace and defence sectors, attracts interest from construction researchers in response to longstanding problems of project definition. Doubts are expressed whether RM offers a new discipline for construction practitioners or whether it repeats previous exhortations to adopt a more disciplined way of working. Whilst systems engineering has an established track record of addressing complex technical problems, its extension to socially complex problems has been challenged. The dominant storyline of RM is one of procedural rationality and RM is commonly presented as a means of controlling dilettante behaviour. Interviews with RM practitioners suggest a considerable gulf between the dominant storyline in the literature and how practitioners operate in practice. The paper challenges construction researchers interested in RM to reflect more upon the theoretical debates that underpin current equivalent practices in construction and the disparity between espoused and enacted practice.
Resumo:
Three experiments attempted to clarify the effect of altering the spatial presentation of irrelevant auditory information. Previous research using serial recall tasks demonstrated a left-ear disadvantage for the presentation of irrelevant sounds (Hadlington, Bridges, & Darby, 2004). Experiments 1 and 2 examined the effects of manipulating the location of irrelevant sound on either a mental arithmetic task (Banbury & Berry, 1998) or a missing-item task (Jones & Macken, 1993; Experiment 4). Experiment 3 altered the amount of change in the irrelevant stream to assess how this affected the level of interference elicited. Two prerequisites appear necessary to produce the left-ear disadvantage; the presence of ordered structural changes in the irrelevant sound and the requirement for serial order processing of the attended information. The existence of a left-ear disadvantage highlights the role of the right hemisphere in the obligatory processing of auditory information. (c) 2006 Published by Elsevier Inc.
Resumo:
We present a conceptual architecture for a Group Support System (GSS) to facilitate Multi-Organisational Collaborative Groups (MOCGs) initiated by local government and including external organisations of various types. Multi-Organisational Collaborative Groups (MOCGs) consist of individuals from several organisations which have agreed to work together to solve a problem. The expectation is that more can be achieved working in harmony than separately. Work is done interdependently, rather than independently in diverse directions. Local government, faced with solving complex social problems, deploy MOCGs to enable solutions across organisational, functional, professional and juridical boundaries, by involving statutory, voluntary, community, not-for-profit and private organisations. This is not a silver bullet as it introduces new pressures. Each member organisation has its own goals, operating context and particular approaches, which can be expressed as their norms and business processes. Organisations working together must find ways of eliminating differences or mitigating their impact in order to reduce the risks of collaborative inertia and conflict. A GSS is an electronic collaboration system that facilitates group working and can offer assistance to MOCGs. Since many existing GSSs have been primarily developed for single organisation collaborative groups, even though there are some common issues, there are some difficulties peculiar to MOCGs, and others that they experience to a greater extent: a diversity of primary organisational goals among members; different funding models and other pressures; more significant differences in other information systems both technologically and in their use than single organisations; greater variation in acceptable approaches to solve problems. In this paper, we analyse the requirements of MOCGs led by local government agencies, leading to a conceptual architecture for an e-government GSS that captures the relationships between 'goal', 'context', 'norm', and 'business process'. Our models capture the dynamics of the circumstances surrounding each individual representing an organisation in a MOCG along with the dynamics of the MOCG itself as a separate community.
Resumo:
This paper discusses the architectural design, implementation and associated simulated peformance results of a possible receiver solution fir a multiband Ultra-Wideband (UWB) receiver. The paper concentrates on the tradeoff between the soft-bit width and numerical precision requirements for the receiver versus performance. The required numerical precision results obtained in this paper can be used by baseband designers of cost effective UWB systems using Systein-on-Chip (SoC), FPGA and ASIC technology solutions biased toward the competitive consumer electronics market(1).
Resumo:
Supplier selection has a great impact on supply chain management. The quality of supplier selection also affects profitability of organisations which work in the supply chain. As suppliers can provide variety of services and customers demand higher quality of service provision, the organisation is facing challenges for making the right choice of supplier for the right needs. The existing methods for supplier selection, such as data envelopment analysis (DEA) and analytical hierarchy process (AHP) can automatically perform selection of competitive suppliers and further decide winning supplier(s). However, these methods are not capable of determining the right selection criteria which should be derived from the business strategy. An ontology model described in this paper integrates the strengths of DEA and AHP with new mechanisms which ensure the right supplier to be selected by the right criteria for the right customer's needs.
Resumo:
Abstract. This paper presents the User-Intimate Requirements Hierarchy Resolution Framework (UI-REF) based on earlier work (Badii 1997-2008) to optimise the requirements engineering process particularly to support userintimate interactive systems co-design. The stages of the UI- EF framework for requirements resolution-and-prioritisation are described. UI-REF has been established to ensure that the most-deeply-valued needs of the majority of stakeholders are elicited and ranked, and the root rationale for requirements evolution is trace-able and contextualised so as to help resolve stakeholder conflicts. UI-REF supports the dynamically evolving requirements of the users in the context of digital economy as under-pinned by online service provisioning. Requirements prioritisation in UI-REF is fully resolved while a promotion path for lower priority requirements is delineated so as to ensure that as the requirements evolve so will their resolution and prioritisation.