912 resultados para automated planning


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This is a three volume set of the final report on the comprehensive plan of the Urban Planning Grant for the City of Urbandale. The report also includes important maps and charts.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Capitol Planning Commission is authorized under Chapter 8A.371—378 of the Code of Iowa. “It shall be the duty of the commission to advise upon the location of statues, fountains and monuments and the placing of any additional buildings on the capitol grounds, the type of architecture and the type of construction of any new buildings to be erected on the state capitol grounds as now encompassed or as subsequently enlarged, and repairs and restoration thereof, and it shall be the duty of the officers, commissions, and councils charged by law with the duty of determining such questions to call upon the commission for such advice. “The commission shall, in cooperation with the director of the department of administrative services, develop and implement within the limits of its appropriation, a five-year modernization program for the capitol complex. “The commission shall annually report to the general assembly its recommendations relating to its duties under this section. The report shall be submitted to the chief clerk of the house and the secretary of the senate during the month of January.” —Code of Iowa, Chapter 8A.373

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Capitol Planning Commission is authorized under Chapter 8A.371—378 of the Code of Iowa. “It shall be the duty of the commission to advise upon the location of statues, fountains and monuments and the placing of any additional buildings on the capitol grounds, the type of architecture and the type of construction of any new buildings to be erected on the state capitol grounds as now encompassed or as subsequently enlarged, and repairs and restoration thereof, and it shall be the duty of the officers, commissions, and councils charged by law with the duty of determining such questions to call upon the commission for such advice. “The commission shall, in cooperation with the director of the department of administrative services, develop and implement within the limits of its appropriation, a five-year modernization program for the capitol complex. “The commission shall annually report to the general assembly its recommendations relating to its duties under this section. The report shall be submitted to the chief clerk of the house and the secretary of the senate during the month of January.” —Code of Iowa, Chapter 8A.373

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Capitol Planning Commission is authorized under Chapter 8A.371—378 of the Code of Iowa. “It shall be the duty of the commission to advise upon the location of statues, fountains and monuments and the placing of any additional buildings on the capitol grounds, the type of architecture and the type of construction of any new buildings to be erected on the state capitol grounds as now encompassed or as subsequently enlarged, and repairs and restoration thereof, and it shall be the duty of the officers, commissions, and councils charged by law with the duty of determining such questions to call upon the commission for such advice. “The commission shall, in cooperation with the director of the department of administrative services, develop and implement within the limits of its appropriation, a five-year modernization program for the capitol complex. “The commission shall annually report to the general assembly its recommendations relating to its duties under this section. The report shall be submitted to the chief clerk of the house and the secretary of the senate during the month of January.” —Code of Iowa, Chapter 8A.373

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Capitol Planning Commission is authorized under Chapter 8A.371—378 of the Code of Iowa. “It shall be the duty of the commission to advise upon the location of statues, fountains and monuments and the placing of any additional buildings on the capitol grounds, the type of architecture and the type of construction of any new buildings to be erected on the state capitol grounds as now encompassed or as subsequently enlarged, and repairs and restoration thereof, and it shall be the duty of the officers, commissions, and councils charged by law with the duty of determining such questions to call upon the commission for such advice. “The commission shall, in cooperation with the director of the department of administrative services, develop and implement within the limits of its appropriation, a five-year modernization program for the capitol complex. “The commission shall annually report to the general assembly its recommendations relating to its duties under this section. The report shall be submitted to the chief clerk of the house and the secretary of the senate during the month of January.” —Code of Iowa, Chapter 8A.373

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This 2011 Annual Report further summarizes the work of the Commission during the last year and provides planning recommendations for the future of the Capitol Complex. Please note that Iowa Code Chapter 8A.373 provides that before any physical changes are made to the state capitol complex "it shall be the duty of the officers, commissions, and councils charged by law with the duty of determining such questions to call upon" the Capitol Planning Commission for advice. The Capitol Planning Commission members, as well as DAS Staff, welcome the opportunity to discuss future projects at the request of any legislator.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There is a great lack of information from soil surveys in the southern part of the State of Amazonas, Brazil. The use of tools such as geostatistics may improve environmental planning, use and management. In this study, we aimed to use scaled semivariograms in sample design of soil physical properties of some environments in Amazonas. We selected five areas located in the south of the state of Amazonas, Brazil, with varied soil uses, such as forest, archaeological dark earth (ADE), pasture, sugarcane cropping, and agroforestry. Regular mesh grids were set up in these areas with 64 sample points spaced at 10 m from each other. At these points, we determined the particle size composition, soil resistance to penetration, moisture, soil bulk density and particle density, macroporosity, microporosity, total porosity, and aggregate stability in water at a depth of 0.00-0.20 m. Descriptive and geostatistical analyses were performed. The sample density requirements were lower in the pasture area but higher in the forest. We concluded that managed-environments had differences in their soil physical properties compared to the natural forest; notably, the soil in the ADE environment is physically improved in relation to the others. The physical properties evaluated showed a structure of spatial dependence with a slight variability of the forest compared to the others. The use of the range parameter of the semivariogram analysis proved to be effective in determining an ideal sample density.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The lack of information concerning the variability of soil properties has been a major concern of researchers in the Amazon region. Thus, the aim of this study was to evaluate the spatial variability of soil chemical properties and determine minimal sampling density to characterize the variability of these properties in five environments located in the south of the State of Amazonas, Brazil. The five environments were archaeological dark earth (ADE), forest, pasture land, agroforestry operation, and sugarcane crop. Regular 70 × 70 m mesh grids were set up in these areas, with 64 sample points spaced at 10 m distance. Soil samples were collected at the 0.0-0.1 m depth. The chemical properties of pH in water, OM, P, K, Ca, Mg, H+Al, SB, CEC, and V were determined at these points. Data were analyzed by descriptive and geostatistical analyses. A large part of the data analyzed showed spatial dependence. Chemical properties were best fitted to the spherical model in almost all the environments evaluated, except for the sugarcane field with a better fit to the exponential model. ADE and sugarcane areas had greater heterogeneity of soil chemical properties, showing a greater range and higher sampling density; however, forest and agroforestry areas had less variability of chemical properties.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

PURPOSE: Peptide receptor radionuclide therapy (PRRT) delivers high absorbed doses to kidneys and may lead to permanent nephropathy. Reliable dosimetry of kidneys is thus critical for safe and effective PRRT. The aim of this work was to assess the feasibility of planning PRRT based on 3D radiobiological dosimetry (3D-RD) in order to optimize both the amount of activity to administer and the fractionation scheme, while limiting the absorbed dose and the biological effective dose (BED) to the renal cortex. METHODS: Planar and SPECT data were available for a patient examined with (111)In-DTPA-octreotide at 0.5 (planar only), 4, 24, and 48 h post-injection. Absorbed dose and BED distributions were calculated for common therapeutic radionuclides, i.e., (111)In, (90)Y and (177)Lu, using the 3D-RD methodology. Dose-volume histograms were computed and mean absorbed doses to kidneys, renal cortices, and medullae were compared with results obtained using the MIRD schema (S-values) with the multiregion kidney dosimetry model. Two different treatment planning approaches based on (1) the fixed absorbed dose to the cortex and (2) the fixed BED to the cortex were then considered to optimize the activity to administer by varying the number of fractions. RESULTS: Mean absorbed doses calculated with 3D-RD were in good agreement with those obtained with S-value-based SPECT dosimetry for (90)Y and (177)Lu. Nevertheless, for (111)In, differences of 14% and 22% were found for the whole kidneys and the cortex, respectively. Moreover, the authors found that planar-based dosimetry systematically underestimates the absorbed dose in comparison with SPECT-based methods, up to 32%. Regarding the 3D-RD-based treatment planning using a fixed BED constraint to the renal cortex, the optimal number of fractions was found to be 3 or 4, depending on the radionuclide administered and the value of the fixed BED. Cumulative activities obtained using the proposed simulated treatment planning are compatible with real activities administered to patients in PRRT. CONCLUSIONS: The 3D-RD treatment planning approach based on the fixed BED was found to be the method of choice for clinical implementation in PRRT by providing realistic activity to administer and number of cycles. While dividing the activity in several cycles is important to reduce renal toxicity, the clinical outcome of fractionated PRRT should be investigated in the future.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report on a review of selected application controls over the Iowa State University of Science and Technology Facilities Planning and Management - Facilities Administrative Management Information System for the period of April 18, 2011 through May 16, 2011

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report on the Chariton Valley Planning & Development Council of Governments for the period July 1, 2007 through August 31, 2010

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A large percentage of bridges in the state of Iowa are classified as structurally or fiinctionally deficient. These bridges annually compete for a share of Iowa's limited transportation budget. To avoid an increase in the number of deficient bridges, the state of Iowa decided to implement a comprehensive Bridge Management System (BMS) and selected the Pontis BMS software as a bridge management tool. This program will be used to provide a selection of maintenance, repair, and replacement strategies for the bridge networks to achieve an efficient and possibly optimal allocation of resources. The Pontis BMS software uses a new rating system to evaluate extensive and detailed inspection data gathered for all bridge elements. To manually collect these data would be a highly time-consuming job. The objective of this work was to develop an automated-computerized methodology for an integrated data base that includes the rating conditions as defined in the Pontis program. Several of the available techniques that can be used to capture inspection data were reviewed, and the most suitable method was selected. To accomplish the objectives of this work, two userfriendly programs were developed. One program is used in the field to collect inspection data following a step-by-step procedure without the need to refer to the Pontis user's manuals. The other program is used in the office to read the inspection data and prepare input files for the Pontis BMS software. These two programs require users to have very limited knowledge of computers. On-line help screens as well as options for preparing, viewing, and printing inspection reports are also available. The developed data collection software will improve and expedite the process of conducting bridge inspections and preparing the required input files for the Pontis program. In addition, it will eliminate the need for large storage areas and will simplify retrieval of inspection data. Furthermore, the approach developed herein will facilitate transferring these captured data electronically between offices within the Iowa DOT and across the state.