952 resultados para UNSTABLE PHASES
Resumo:
We prospectively investigated urinary iodine concentration (UIC) in pregnant women and in female, non-pregnant controls in the canton of Berne, Switzerland, in 1992. Mean UIC of pregnant women [205 +/- 151 microg iodine/g creatinine (microg l/g Cr); no. = 153] steadily decreased from the first (236 +/- 180 microg l/g Cr; no. = 31) to the third trimester (183 +/- 111 microg l/g Cr, p < 0.0001; no. = 66) and differed significantly from that of the control group (91 +/- 37 microg l/g Cr, p < 0.0001; no. = 119). UIC increased 2.6-fold from levels indicating mild iodine deficiency in controls to the first trimester, demonstrating that high UIC during early gestation does not necessarily reflect a sufficient iodine supply to the overall population. Pregnancy is accompanied by important alterations in the regulation of thyroid function and iodine metabolism. Increased renal iodine clearance during pregnancy may explain increased UIC during early gestation, whereas increased thyroidal iodine clearance as well as the iodine shift from the maternal circulation to the growing fetal-placental unit, which both tend to lower the circulating serum levels of inorganic iodide, probably are the causes of the continuous decrease of UIC over the course of pregnancy. Mean UIC in our control group, as well as in one parallel and several consecutive investigations in the same region in the 1990s, was found to be below the actually recommended threshold, indicating a new tendency towards mild to moderate iodine deficiency. As salt is the main source of dietary iodine in Switzerland, its iodine concentration was therefore increased nationwide in 1998 for the fourth time, following increases in 1922, 1965 and 1980.
Resumo:
OBJECTIVE: To evaluate fracture patterns in bicondylar tibial plateau fractures and their impact on treatment strategy. DESIGN: Prospective data analysis with documentation of initial injury and treatment strategy, computed tomography scans, conventional x-rays, long-term evaluation of radiographs, and functional assessments. SETTING: Level 1 regional trauma center. PATIENTS: Prospective data acquisition of 14 consecutive patients (10 male and 4 female) with a bicondylar tibial plateau fracture (AO Type C). INTERVENTION: Application of a stepwise reconstruction strategy of the tibial plateau starting with the reposition and fixation of the posteromedial split fragment using a 3.5 buttress plate, followed by reposition and grafting of the lateral compartment and lateral fixation with a 3.5 plate in 90 degree to the medial fixation device. MAIN OUTCOME MEASUREMENTS: All patients were evaluated with full-length standing film, standardized x-rays, Lysholm score for functional assessment, and patient's self-appraisal. RESULTS: Most of the complex bicondylar fractures follow a regular pattern in that the medial compartment is split in a mediolateral direction with a posteromedial main fragment, combined with various amounts of multifragmental lateral compartment depression. The technique introduced allows for accurate and stable reduction and fixation of this fracture type. The final Lysholm knee score showed an average of 83.5 points (range: 64.5-92). CONCLUSIONS: Complex bicondylar tibial plateau fractures follow a regular pattern, which is not represented in existing 2-dimensional fracture classifications. A 2-incision technique starting with the reduction of the posteromedial edge results in accurate fracture reduction with low complication rates and excellent knee function.
Resumo:
The objective of this research was to develop a high-fidelity dynamic model of a parafoilpayload system with respect to its application for the Ship Launched Aerial Delivery System (SLADS). SLADS is a concept in which cargo can be transfered from ship to shore using a parafoil-payload system. It is accomplished in two phases: An initial towing phase when the glider follows the towing vessel in a passive lift mode and an autonomous gliding phase when the system is guided to the desired point. While many previous researchers have analyzed the parafoil-payload system when it is released from another airborne vehicle, limited work has been done in the area of towing up the system from ground or sea. One of the main contributions of this research was the development of a nonlinear dynamic model of a towed parafoil-payload system. After performing an extensive literature review of the existing methods of modeling a parafoil-payload system, a five degree-of-freedom model was developed. The inertial and geometric properties of the system were investigated to predict accurate results in the simulation environment. Since extensive research has been done in determining the aerodynamic characteristics of a paraglider, an existing aerodynamic model was chosen to incorporate the effects of air flow around the flexible paraglider wing. During the towing phase, it is essential that the parafoil-payload system follow the line of the towing vessel path to prevent an unstable flight condition called ‘lockout’. A detailed study of the causes of lockout, its mathematical representation and the flight conditions and the parameters related to lockout, constitute another contribution of this work. A linearized model of the parafoil-payload system was developed and used to analyze the stability of the system about equilibrium conditions. The relationship between the control surface inputs and the stability was investigated. In addition to stability of flight, one more important objective of SLADS is to tow up the parafoil-payload system as fast as possible. The tension in the tow cable is directly proportional to the rate of ascent of the parafoil-payload system. Lockout instability is more favorable when tow tensions are large. Thus there is a tradeoff between susceptibility to lockout and rapid deployment. Control strategies were also developed for optimal tow up and to maintain stability in the event of disturbances.
Resumo:
Information management is a key aspect of successful construction projects. Having inaccurate measurements and conflicting data can lead to costly mistakes, and vague quantities can ruin estimates and schedules. Building information modeling (BIM) augments a 3D model with a wide variety of information, which reduces many sources of error and can detect conflicts before they occur. Because new technology is often more complex, it can be difficult to effectively integrate it with existing business practices. In this paper, we will answer two questions: How can BIM add value to construction projects? and What lessons can be learned from other companies that use BIM or other similar technology? Previous research focused on the technology as if it were simply a tool, observing problems that occurred while integrating new technology into existing practices. Our research instead looks at the flow of information through a company and its network, seeing all the actors as part of an ecosystem. Building upon this idea, we proposed the metaphor of an information supply chain to illustrate how BIM can add value to a construction project. This paper then concludes with two case studies. The first case study illustrates a failure in the flow of information that could have prevented by using BIM. The second case study profiles a leading design firm that has used BIM products for many years and shows the real benefits of using this program.