938 resultados para Software process improvement
Resumo:
Aquest treball descriu els principis de disseny i els components essencials d'un hipotètic programa informàtic que té per finalitat facilitar el procés d'autoajuda i que també pot ser utilitzat com a eina de desenvolupament personal i motivació. Prèviament, l'autor fa una revisió dels mètodes existents, des de l'èxit dels llibres d'autoajuda del segle XX fins al'expansió de la interactivitat impulsada pel desenvolupament de les tecnologiesinformàtiques. A través d'aquest recorregut es constata la pobre implantació de les novestecnologies com a instruments populars d'autoajuda i s'advoca per la creació i ús deprogrames informàtics flexibles i generalistes com a mitjà de suport psicològic.
Resumo:
BACKGROUND Only multifaceted hospital wide interventions have been successful in achieving sustained improvements in hand hygiene (HH) compliance. METHODOLOGY/PRINCIPAL FINDINGS Pre-post intervention study of HH performance at baseline (October 2007-December 2009) and during intervention, which included two phases. Phase 1 (2010) included multimodal WHO approach. Phase 2 (2011) added Continuous Quality Improvement (CQI) tools and was based on: a) Increase of alcohol hand rub (AHR) solution placement (from 0.57 dispensers/bed to 1.56); b) Increase in frequency of audits (three days every three weeks: "3/3 strategy"); c) Implementation of a standardized register form of HH corrective actions; d) Statistical Process Control (SPC) as time series analysis methodology through appropriate control charts. During the intervention period we performed 819 scheduled direct observation audits which provided data from 11,714 HH opportunities. The most remarkable findings were: a) significant improvements in HH compliance with respect to baseline (25% mean increase); b) sustained high level (82%) of HH compliance during intervention; c) significant increase in AHRs consumption over time; c) significant decrease in the rate of healthcare-acquired MRSA; d) small but significant improvements in HH compliance when comparing phase 2 to phase 1 [79.5% (95% CI: 78.2-80.7) vs 84.6% (95% CI:83.8-85.4), p<0.05]; e) successful use of control charts to identify significant negative and positive deviations (special causes) related to the HH compliance process over time ("positive": 90.1% as highest HH compliance coinciding with the "World hygiene day"; and "negative":73.7% as lowest HH compliance coinciding with a statutory lay-off proceeding). CONCLUSIONS/SIGNIFICANCE CQI tools may be a key addition to WHO strategy to maintain a good HH performance over time. In addition, SPC has shown to be a powerful methodology to detect special causes in HH performance (positive and negative) and to help establishing adequate feedback to healthcare workers.
Resumo:
BACKGROUND The diagnosis of infant cerebral palsy (ICP) is a traumatic event that can provoke multiple effects and changes in the family. The aim of the study is to discover the difficulties that parents face in the process of parenting, especially in the initial period following diagnosis. METHODS A qualitative study was carried out through semi-structured interviews. Sixteen mothers and fathers whose children were diagnosed with cerebral palsy participated in the study. Data analysis was performed with Atlas.ti 6.2 software following a strategy of open coding. RESULTS The reception of the diagnosis is perceived as an unexpected event that makes parents change expectations and hopes related to their children. The mode of relation with the child with ICP is different from that with other children as parents are more focused on the possibility of improvement and the future evolution of their child. Changes in different aspects of the lives of these parents are shown, such as demands on time, their economic and labour situation, as well as the relationship of the couple. CONCLUSIONS In providing care for children with cerebral palsy it is necessary to take the problems of the parents into account, especially in the initial period after diagnosis. The process of parenting a child with cerebral palsy entails many changes in the family so a global perspective is needed to organize interventions.
Resumo:
This research was based on a study of social enterprises in Brazil, to find out if and how these organizations plan and manage the succession process for their senior positions. The study investigated the subset of the associations dedicated to collectively producing goods and services, because they are formally set up and aimed at speeding up the dynamism of local development. The empirical research consisted of two stages. The first was a survey covering a sample of 378 organizations, to find out which of those had already undergone or were undergoing a succession process. The second interviewed the main manager of 32 organizations, to obtain a description of their succession experience. In this stage, the research aimed to analyze how the Individual, Organization and Environment dimensions interact to configure the succession process, identifying which factors of each of these dimensions can facilitate or limit this process. The following guiding elements were taken as the analytical basis: Individual dimension - leadership roles, skill and styles; Organization dimension - structure, planning, advisory boards, communication (transparency), control and evaluation; and Environment dimension - influence of the stakeholders (community, suppliers, clients, and business partners) on the succession process. The results indicated that succession in the researched associations is in the construction stage: it adapts to the requirements of current circumstances but is evidently in need of improvement in order for more effective planning and shared management of the process to be achieved.
Resumo:
Percutaneous transluminal renal angioplasty (PTRA) is an invasive technique that is costly and involves the risk of complications and renal failure. The ability of PTRA to reduce the administration of antihypertensive drugs has been demonstrated. A potentially greater benefit, which nevertheless remains to be proven, is the deferral of the need for chronic dialysis. The aim of the study (ANPARIA) was to assess the appropriateness of PTRA to impact on the evolution of renal function. A standardized expert panel method was used to assess the appropriateness of medical treatment alone or medical treatment with revascularization in various clinical situations. The choice of revascularization by either PTRA or surgery was examined for each clinical situation. Analysis was based on a detailed literature review and on systematically elicited expert opinion, which were obtained during a two-round modified Delphi process. The study provides detailed responses on the appropriateness of PTRA for 1848 distinct clinical scenarios. Depending on the major clinical presentation, appropriateness of revascularization varied from 32% to 75% for individual scenarios (overal 48%). Uncertainty as to revascularization was 41% overall. When revascularization was appropriate, PTRA was favored over surgery in 94% of the scenarios, except in certain cases of aortic atheroma where sugery was the preferred choice. Kidney size [7 cm, absence of coexisting disease, acute renal failure, a high degree of stenosis (C70%), and absence of multiple arteries were identified as predictive variables of favorable appropriateness ratings. Situations such as cardiac failure with pulmonary edema or acute thrombosis of the renal artery were defined as indications for PTRA. This study identified clinical situations in which PTRA or surgery are appropriate for renal artery disease. We built a decision tree which can be used via Internet: the ANPARIA software (http://www.chu-clermontferrand.fr/anparia/). In numerous clinical situations uncertainty remains as to whether PTRA prevents deterioration of renal function.
Resumo:
This paper describes a Computer-Supported Collaborative Learning (CSCL) case study in engineering education carried out within the context of a network management course. The case study shows that the use of two computing tools developed by the authors and based on Free- and Open-Source Software (FOSS) provide significant educational benefits over traditional engineering pedagogical approaches in terms of both concepts and engineering competencies acquisition. First, the Collage authoring tool guides and supports the course teacher in the process of authoring computer-interpretable representations (using the IMS Learning Design standard notation) of effective collaborative pedagogical designs. Besides, the Gridcole system supports the enactment of that design by guiding the students throughout the prescribed sequence of learning activities. The paper introduces the goals and context of the case study, elaborates onhow Collage and Gridcole were employed, describes the applied evaluation methodology, anddiscusses the most significant findings derived from the case study.
Resumo:
ABSTRACT OBJECTIVE To identify the workloads present in the work activities of community health agents (CHAs) and the resulting strain processes. METHOD A descriptive, exploratory, cross-sectional and quantitative study conducted with 137 CHAs. Data were collected through a questionnaire and interview guided by the health surveillance software called SIMOSTE (Health Monitoring System of Nursing Workers), following the ethical codes of the current law. RESULTS In total, were identified 140 workloads involved in 122 strain processes, represented by the occurrence of health problems of the CHAs. The mechanical (55.00%) and biological (16.43%) loads stood out. The most common strain processes were the external causes of morbidity and mortality (62.31%) and diseases of the musculoskeletal system and connective tissue (10.66%). CONCLUSION From the identified overloads, it became evident that all workloads are present in the work process of CHAs, highlighting the mechanical load, represented mainly by external causes of morbidity and mortality that are related to occupational accidents.
Resumo:
Early revascularization of pancreatic islet cells after transplantation is crucial for engraftment, and it has been suggested that vascular endothelial growth factor-A (VEGF-A) plays a significant role in this process. Although VEGF gene therapy can improve angiogenesis, uncontrolled VEGF secretion can lead to vascular tumor formation. Here we have explored the role of temporal VEGF expression, controlled by a tetracycline (TC)-regulated promoter, on revascularization and engraftment of genetically modified beta cells following transplantation. To this end, we modified the CDM3D beta cell line using a lentiviral vector to promote secretion of VEGF-A either in a TC-regulated (TET cells) or a constitutive (PGK cells) manner. VEGF secretion, angiogenesis, cell proliferation, and stimulated insulin secretion were assessed in vitro. VEGF secretion was increased in TET and PGK cells, and VEGF delivery resulted in angiogenesis, whereas addition of TC inhibited these processes. Insulin secretion by the three cell types was similar. We used a syngeneic mouse model of transplantation to assess the effects of this controlled VEGF expression in vivo. Time to normoglycemia, intraperitoneal glucose tolerance test, graft vascular density, and cellular mass were evaluated. Increased expression of VEGF resulted in significantly better revascularization and engraftment after transplantation when compared to control cells. In vivo, there was a significant increase in vascular density in grafted TET and PGK cells versus control cells. Moreover, the time for diabetic mice to return to normoglycemia and the stimulated plasma glucose clearance were also significantly accelerated in mice transplanted with TET and PGK cells when compared to control cells. VEGF was only needed during the first 2-3 weeks after transplantation; when removed, normoglycemia and graft vascularization were maintained. TC-treated mice grafted with TC-treated cells failed to restore normoglycemia. This approach allowed us to switch off VEGF secretion when the desired effects had been achieved. TC-regulated temporal expression of VEGF using a gene therapy approach presents a novel way to improve early revascularization and engraftment after islet cell transplantation.
Resumo:
Revenue management (RM) is a complicated business process that can best be described ascontrol of sales (using prices, restrictions, or capacity), usually using software as a tool to aiddecisions. RM software can play a mere informative role, supplying analysts with formatted andsummarized data who use it to make control decisions (setting a price or allocating capacity fora price point), or, play a deeper role, automating the decisions process completely, at the otherextreme. The RM models and algorithms in the academic literature by and large concentrateon the latter, completely automated, level of functionality.A firm considering using a new RM model or RM system needs to evaluate its performance.Academic papers justify the performance of their models using simulations, where customerbooking requests are simulated according to some process and model, and the revenue perfor-mance of the algorithm compared to an alternate set of algorithms. Such simulations, whilean accepted part of the academic literature, and indeed providing research insight, often lackcredibility with management. Even methodologically, they are usually awed, as the simula-tions only test \within-model" performance, and say nothing as to the appropriateness of themodel in the first place. Even simulations that test against alternate models or competition arelimited by their inherent necessity on fixing some model as the universe for their testing. Theseproblems are exacerbated with RM models that attempt to model customer purchase behav-ior or competition, as the right models for competitive actions or customer purchases remainsomewhat of a mystery, or at least with no consensus on their validity.How then to validate a model? Putting it another way, we want to show that a particularmodel or algorithm is the cause of a certain improvement to the RM process compared to theexisting process. We take care to emphasize that we want to prove the said model as the causeof performance, and to compare against a (incumbent) process rather than against an alternatemodel.In this paper we describe a \live" testing experiment that we conducted at Iberia Airlineson a set of flights. A set of competing algorithms control a set of flights during adjacentweeks, and their behavior and results are observed over a relatively long period of time (9months). In parallel, a group of control flights were managed using the traditional mix of manualand algorithmic control (incumbent system). Such \sandbox" testing, while common at manylarge internet search and e-commerce companies is relatively rare in the revenue managementarea. Sandbox testing has an undisputable model of customer behavior but the experimentaldesign and analysis of results is less clear. In this paper we describe the philosophy behind theexperiment, the organizational challenges, the design and setup of the experiment, and outlinethe analysis of the results. This paper is a complement to a (more technical) related paper thatdescribes the econometrics and statistical analysis of the results.
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state's transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. Iowa's transportation system is multi-modal; therefore, the Program encompasses investments in aviation, transit, railroads, trails, and highways. A major component of the Program is the highway section. The FY2009-2013 highway section is financially balanced and was developed to achieve several objectives. The Commission's primary highway investment objective is the safety, maintenance and preservation of Iowa's existing highway system. The Commission has allocated an annual average of $321 million to achieve this objective. This includes $185 million in 2009 and $170 million annually in years 2010-2013 for preserving the interstate system. It includes $114 million in 2009, $100 million in 2010 and $90 million annually in years 2011-2013 for non-interstate pavement preservation. It includes $38 million annually in 2009 and 2010, and $35 million annually in years 2011-2013 for non-interstate bridges. In addition, $15 million annually is allocated for safety projects. However, due to increasing construction costs, flattened revenues and overall highway systems needs, the Commission acknowledges that insufficient funds are being invested in the maintenance and preservation of the existing highway system. Another objective involves investing in projects that have received funding from the federal transportation act and/or subsequent federal transportation appropriation acts. In particular, funding is being used where it will complete a project, corridor or useable segment of a larger project. As an investment goal, the Commission also wishes to advance highway projects that address the state's highway capacity and economic development needs. Projects that address these needs and were included for completion in the previous program have been advanced into this year's Program to maintain their scheduled completion. This program also includes a small number of other projects that generally either represent a final phase of a partially programmed project or an additional segment of a partially completed corridor. The TIME-21 bill, Senate File 2420, signed by Governor Chet Culver on April 22, provides additional funding to cities, counties and the Iowa DOT for road improvements. This will result in additional revenue to the Primary Road Fund beginning in the second half of FY2009 and gradually increase over time. The additional funding will be included in future highway programming objectives and proposals and is not reflected in this highway program. The Iowa DOT and Commission appreciate the public's involvement in the state's transportation planning process. Comments received personally, by letter, or through participation in the Commission's regular meetings or public input meetings held around the state each year are invaluable in providing guidance for the future of Iowa's transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change. You are invited to visit the Iowa DOT's Web site at iowadot.gov for additional and regular updates about the department's programs and activities.
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. A major component of the 2010-2014 Program is the full integration of funding allocated to the Iowa DOT from the American Recovery and Reinvestment Act of 2009 (Recovery Act). To date, the Recovery Act has provided over $400 million of additional federal funding for transportation in Iowa, including funding that is allocated to local governments and entities. Recovery Act funding will result in a record year for transportation construction in Iowa and the creation and retention of jobs. Opportunities for additionalRecovery Act transportation funding remain and will be pursued as they becomeavailable. While Recovery Act funding will make a one-time significant impact in addressing Iowa’s backlog of needs, it is important to note that there remains a large shortfall in sustained annual transportation investment to meet Iowa’s current and future critical transportation needs. In recognition of this shortfall, Governor Culver introduced and the legislature passed an I-JOBS proposal. I-JOBS will result in an additional $50 million of state funding to reduce structurally deficient and functionally obsolete bridges on the primary road system and approximately $10 million in funding for other modes of transportation including $3 million of new funding to support the expansion of passenger rail service in Iowa. I-JOBS, and the continuing gradual increase in funding due to TIME-21, will complement and extend the benefits of Recovery Act funding and set the stage for addressing the shortfall in annual funding in the next few years. Iowa’s transportation system is multi-modal; therefore, the Program encompasses investments in aviation, transit, railroads, trails, and highways. A major component of the Program is the highway section. The FY2010-2014 highway section is financially balanced and was developed to achieve several objectives. The Commission’s primary highway investment objective is stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. The highway section includes an annual average of $104 million for preserving the interstate system; an annual average of $78 million for non-interstate pavement preservation; an annual average of $36 million for non-interstate bridges; and an annual average of $14 million for safety projects. Another objective is to maintain the scheduled completion of interstate and non-interstate capacity and economic development projects that were identified in the previous Program and this Program does so. The final Commission objective is to further address capacity and economic development needs and the Commission has done so by adding several such projects to the Program. Construction improvements are partially funded through the current federal transportation act, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU). The act will expire September 30, 2009. With the expiration of SAFETEA-LU, there is significant uncertainty in the forecast of federal revenues in the out-years of this Program. The Commission and Iowa DOT will monitor federal actions closely and make adjustments to the Program as necessary. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter, or through participation in the Commission’s regular meetings or public input meetings held around the state each year are invaluable in providing guidance for the future of Iowa’s transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change. You are invited to visit the Iowa DOT’s Web site at iowadot.gov for additional and regular updates about the department’s programs and activities.
Resumo:
Iowa’s Statewide Transportation Improvement Program (STIP) has been developed in conformance with the guidelines prescribed by 23 USC. The STIP is generated to provide the Federal Highway Administration (FHWA) and Federal Transit Administration (FTA) a listing of all projects that are candidates for federal aid from the FHWA and FTA for four federal fiscal years (FFY). Preceding the listings of federal-aid candidates are general comments concerning Iowa’s public participation process for selection of federal-aid projects and the basis for funding the proposed projects. Documents evidencing the Iowa Department of Transportation’s (Iowa DOT) authority to act concerning matters related to transportation, federal-aid expenditures and approvals of Metropolitan Planning Organizations’ (MPOs) Transportation Improvements Programs (TIPs) have been provided in past STIP’s and can be provided again upon request. The projects identified within the 2010-2013 STIP are divided into two groups. Projects proposed for funding from FHWA programs are shown first. FTA programs follow. Maps are included that identify locations of Iowa DOT District Planners, Metropolitan Planning Organizations (MPOs), Regional Planning affiliations (RPAs), and transit systems.
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. This document serves as the Iowa DOT's annual report as required by Iowa Code section 7A.9. This document reflects Iowa’s multimodal transportation system by the inclusion of investments in aviation, transit, railroads, trails, and highways. A major component of this program is the highway section that documents programmed investments on the primary highway system for the next five years. A large part of funding available for highway programming comes from the federal government. Accurately estimating future funding levels of this federal funding is dependent on having a current enacted multi-year federal transportation authorization. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended five times because a new authorization has not yet been enacted. The current extension expires December 31, 2010. While Iowa law does not require the adoption of a Program when federal transportation funding is being reauthorized, the Commission believes it is important to adopt a Program in order to continue on-going planning and project development efforts and to be well positioned when a new authorization is adopted. However, it is important to recognize that, absent a federal authorization bill, there is significant uncertainty in the forecast of federal revenues. The Commission and the Iowa DOT will continue to monitor federal revenues and will adjust future investments as needed to maintain a fiscally responsible Program. In developing the highway section of the program, the Commission’s primary investment objective remains stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. In fact, over $1.2 billion is programmed in FY2011 through FY2015 for preservation of Iowa’s existing highway system and for enhanced highway safety features. The highway section also includes significant investments for interstate modernization on I-29 inSioux City, on I-29/80/480 in Council Bluffs, and on I-74 in Bettendorf/ Davenport. Another highway programming objective reflected in this Program is maintaining the scheduled completion of capacity and economic development projects that were identified in the previous Program. Finally, with the limited remaining funds the Commission has furthered the investment in capacity and economic development by adding a few projects to the Program. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter or through participation in the Commission’s regular meetings or public input meetings held around the state each year, are invaluable in providing guidance for the future of Iowa’s transportation system.
Resumo:
A systematic method to improve the quality (Q) factor of RF integrated inductors is presented in this paper. The proposed method is based on the layout optimization to minimize the series resistance of the inductor coil, taking into account both ohmic losses, due to conduction currents, and magnetically induced losses, due to eddy currents. The technique is particularly useful when applied to inductors in which the fabrication process includes integration substrate removal. However, it is also applicable to inductors on low-loss substrates. The method optimizes the width of the metal strip for each turn of the inductor coil, leading to a variable strip-width layout. The optimization procedure has been successfully applied to the design of square spiral inductors in a silicon-based multichip-module technology, complemented with silicon micromachining postprocessing. The obtained experimental results corroborate the validity of the proposed method. A Q factor of about 17 have been obtained for a 35-nH inductor at 1.5 GHz, with Q values higher than 40 predicted for a 20-nH inductor working at 3.5 GHz. The latter is up to a 60% better than the best results for a single strip-width inductor working at the same frequency.
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. This document reflects Iowa’s multimodal transportation system by the inclusion of investments in aviation, transit, railroads, trails, and highways. A major component of this program is the highway section that documents programmed investments on the primary highway system for the next five years. A large part of funding available for highway programming comes from the federal government. Accurately estimating future federal funding levels is dependent on having a current enacted multi-year federal transportation authorization. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended seven times because a new authorization has not yet been enacted. The current extension will expire September 30, 2011. This leads to significant uncertainty in federal funding; however, it is becoming evident that, in Federal Fiscal Year 2012 and beyond, federal funding revenue will likely be reduced by 25 percent from current levels in order to match revenue that flows into the Highway Trust Fund. This Program reflects this anticipated reduction in federal funding. While Iowa law does not require the adoption of a Program when federal transportation funding is being reauthorized, the Commission believes it is important to adopt a Program in order to continue on-going planning and project development efforts so that Iowa will be well positioned when a new authorization is adopted. However, it is important to recognize that, absent a federal authorization bill, there is significant uncertainty in the forecast of federal revenues. The Commission and the Iowa DOT will continue to monitor federal revenues and will adjust future investments as needed to maintain a fiscally responsible Program. For 2012-2016, approximately $2.3 billion is forecast to be available for highway right of way and construction. In developing the highway section of the Program, the Commission’s primary investment objective remains stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. Over $1.3 billion is programmed in FY2012 through FY2016 for preservation of Iowa’s existing highway system and for enhanced highway safety features. The highway section also includes significant interstate investments on I-29 in Sioux City, I-29/80/480 in Council Bluffs, and I-74 in Bettendorf/Davenport. The FY2016 programming for construction on I-74 in Bettendorf/Davenport is the first of several years of significant investments that will be monitored for available funding. Approximately $200 million of the investments on these three major urban interstate projects address preservation needs. In total, approximately $1.5 billion is programmed for highway preservation activities for 2012- 2016. Another highway programming objective is maintaining the scheduled completion of capacity and economic development projects. Projects that were previously scheduled to be completed within the previous Program continue on their current schedule. However, due to the reduction of projected federal revenues, the Commission has delayed by one year the initiation of construction of all multi-year non-Interstate capacity and economic development projects that cannot be completed within this Program. These projects are U.S. 20 in Woodbury County, U.S. 30 in Benton County, U.S. 61 in Louisa County, and Iowa 100 in Linn County. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter or through participation in the Commission’s regular meetings or public input meetings held around the state each year, are invaluable in providing guidance for the future of Iowa’s transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change.