998 resultados para Roads and highways


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"This publication may be designated as FP-4l."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Reproduction of original from Harvard Law School Library.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"HHI-23/10-86(4M500)QE"- P. [4] of cover.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This special report is prepared to review durability and durability tests for paving asphalt, both in theory and in application. The report summarizes and evaluates factors related to asphalt durability, problems associated with durability study and development of durability tests, important work on durability and practical design implications concerning asphalt durability. It is a state-of-the-art report and a part of the study under HR-124, Development of Laboratory Durability Test for Asphalts.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

County engineers in Iowa face the dual problems of rapidly escalating costs and a decreasing rate of growth of revenues. Various priority systems are in use, ranking projects for inclusion in road improvement programs, but they generally have weaknesses when used to compare one project with another in a different location. The sufficiency rating system has proven to be a useful tool in developing a priority list of projects for primary road systems, but there are none currently in use for secondary road systems. Some elements of an existing system used for primary roads could be modified for use with secondary roads, but would require extensive changes. The research reported here, sponsored by the Iowa Department of Transportation, was undertaken to develop a sufficiency rating system which could be used for secondary roads in Iowa and to produce the necessary forms and instructions to aid county engineering personnel in their efforts to complete the ratings for roads within their county. If a usable system were available that would yield reasonable results, county engineers would have an additional tool available to assist them in arriving at a defensible road improvement program.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

(a) Iowa has a total of 101,620 miles of rural roads, both primary and secondary. (b) On January 1, 1951, a total of 68,869 miles of these rural roads were surfaced - mostly with gravel and crushed stone. (c) Additional roads are being surfaced at the rate of 2676 miles per year. (d) Iowa's highway program provides for a surfaced road to every reasonably located rural home and a paved or other type of dustless surface on all primary roads. (e) Iowa's highway funds come 26.0 per cent from property taxes, 63.5 per cent from road use taxes, 10.5 per cent from Federal aid. (f) Annual income under present laws, available for highway construction, is approximately For primary roads ----------------- $24,000,000 For secondary roads---------------- $41,967,000 (g) Iowa's highway improvements are being paid for as built. No new bonds are being issued. (h) Unobligated available farm to market road funds are rapidly being placed under contract. (i) The letting of highway contracts is increasing rapidly. (j)- Iowa's highway program is estimated to cost $945,000,000 and will require twenty years to build. These are the highlights of Iowa's highway program. The details will follow in succeeding paragraphs.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

(a) Iowa has a total of 101,620 miles of rural roads, both primary and secondary. (b) On January 1, 1952, a total of 71,493 miles of these rural roads were surfaced - mostly with gravel and crushed stone. (c) Additional roads are being surfaced at the rate of 2662 miles per year. (d) Iowa's highway program provides for a surfaced road to every reasonably located rural home and a paved or other type of dustless surface on all primary roads. (e) Iowa's highway funds come 26.0 per cent from property taxes, 63.5 per cent from road use taxes, 10.5 per cent from Federal aid. (f) Annual income under present laws, available for highway construction, is approximately For primary roads------------------$23,000,000 For secondary roads---------------- 41,967,000 (g) Iowa's highway improvements are being paid for as built. No new bonds are being issued. (h) The surplus of farm to market road funds created during and immediately following the War have now been placed under contract, with only a minimum working balance remaining in the fund. (i) Iowa's highway program was estimated to cost $945,000,000 and to require twenty years to build, by the 1948 Legislative Committee. This estimate would now have to be increased due to price increases and higher required standards. These are the highlights of Iowa's highway program. The details will follow in succeeding paragraphs.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

(a) Iowa has a total of 101,451 miles of rural roads, both primary and secondary. (b) On January 1, l954, a total of 77,024 miles of these rural roads were surfaced - mostly with gravel and crushed stone. This is 5,53l miles greater than on January l, 1952. (c) Additional roads are being surfaced at the rate of 2766 miles per year. (d) Iowa's highway program provides for a surfaced road to every reasonably located rural home and a paved or other type of dustless surface on all primary roads. (e) Iowa's highway funds come 25.4 per cent from property taxes and special taxes......................................$29,708,546.67 63.7 per cent from road use taxes.......... 74,581,080.30 10.6 per cent from Federal Aid (1952 Act).. 12,424,000.00 0.3 per cent from miscellaneous receipts.. 287,922.86 ---- ------------- 100.0 $117,001,549.83 (f) Annual income under present laws, available for highway construction, is approximately, For primary roads $29,420,000.00 For secondary roads $44,328,000.00 In 19_3, $7,299,000 of secondary road construction funds was transferred to the maintenance fund. (g) Iowa's highway improvements are being paid for as built. No new bonds are being issued.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This report addresses delays to freight shippers. Although the focus is on just-in-time (JIT) businesses, the authors also note that non JIT businesses also suffer delays that impact their productivity. The table of contents lists the following headings: chapter 1 - introduction - a trial application: the Des Moines metropolitan area; structure of the report; chapter 2 - reliability at the forefront of freight transport demand - manufacturing and inventory; just-in-time operations in the U.S.; transportation consequences; summary; chapter 3 - JIT operations in Iowa - survey and sample; trucking activity and service; just-in-time truck transportation in Iowa; assessment of factors affecting truck transportation service; summary and conclusions; chapter 4 - travel time uncertainty induced by incidents - a probabilistic model for incident occurrences and durations; calculation of delay; trial application; conclusions; and chapter 5 - conclusions and recommendations - conclusions; recommendations.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Transportation and land-use are independent, inter-active systems. Land-use patterns shape local transportation demand, but transportation systems in turn influence land-use patterns. In attempting to satisfy transportation demand created by existing land-use patterns, transportation planners directly, if not always consciously or intentionally, influence future land-use patterns. This study examines that complex relationship. The purpose of the study was threefold: to compile the body of knowledge already existing; to apply this body of knowledge to the context of midsize cities in the Midwest; and, to make the knowledge accessible both to transportation planners and to public officials who make key decisions about land use.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A three-step approach was used to do the study of the Mormon Trail. These involved research, field data collection and evaluation of the project corridors. Step one involved research on the location of the Trail, associated sites and the historic land use near the Trail between 1846 and 1868. The next step involved defining roads to be inventoried and the actual field survey. Step three involved evaluation of the inventoried corridors. This evaluation procedure was based on the methodology currently used by Iowa DOT to evaluate candidate scenic byway routes but involved different evaluation factors. The numeric results of the two analyses can be directly compared. The results of the field survey and evaluation are shown in detail by county. Inventory and evaluation procedures for historic and cultural byways are discussed in Appendix A.