983 resultados para Radiotherapy planning


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This document provides data for the case study presented in our recent earthwork planning papers. Some results are also provided in a graphical format using Excel.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Introduction: The motivation for developing megavoltage (and kilovoltage) cone beam CT (MV CBCT) capabilities in the radiotherapy treatment room was primarily based on the need to improve patient set-up accuracy. There has recently been an interest in using the cone beam CT data for treatment planning. Accurate treatment planning, however, requires knowledge of the electron density of the tissues receiving radiation in order to calculate dose distributions. This is obtained from CT, utilising a conversion between CT number and electron density of various tissues. The use of MV CBCT has particular advantages compared to treatment planning with kilovoltage CT in the presence of high atomic number materials and requires the conversion of pixel values from the image sets to electron density. Therefore, a study was undertaken to characterise the pixel value to electron density relationship for the Siemens MV CBCT system, MVision, and determine the effect, if any, of differing the number of monitor units used for acquisition. If a significant difference with number of monitor units was seen then pixel value to ED conversions may be required for each of the clinical settings. The calibration of the MV CT images for electron density offers the possibility for a daily recalculation of the dose distribution and the introduction of new adaptive radiotherapy treatment strategies. Methods: A Gammex Electron Density CT Phantom was imaged with the MVCB CT system. The pixel value for each of the sixteen inserts, which ranged from 0.292 to 1.707 relative electron density to the background solid water, was determined by taking the mean value from within a region of interest centred on the insert, over 5 slices within the centre of the phantom. These results were averaged and plotted against the relative electron densities of each insert with a linear least squares fit was preformed. This procedure was performed for images acquired with 5, 8, 15 and 60 monitor units. Results: The linear relationship between MVCT pixel value and ED was demonstrated for all monitor unit settings and over a range of electron densities. The number of monitor units utilised was found to have no significant impact on this relationship. Discussion: It was found that the number of MU utilised does not significantly alter the pixel value obtained for different ED materials. However, to ensure the most accurate and reproducible MV to ED calibration, one MU setting should be chosen and used routinely. To ensure accuracy for the clinical situation this MU setting should correspond to that which is used clinically. If more than one MU setting is used clinically then an average of the CT values acquired with different numbers of MU could be utilized without loss in accuracy. Conclusions: No significant differences have been shown between the pixel value to ED conversion for the Siemens MV CT cone beam unit with change in monitor units. Thus as single conversion curve could be utilised for MV CT treatment planning. To fully utilise MV CT imaging for radiotherapy treatment planning further work will be undertaken to ensure all corrections have been made and dose calculations verified. These dose calculations may be either for treatment planning purposes or for reconstructing the delivered dose distribution from transit dosimetry measurements made using electronic portal imaging devices. This will potentially allow the cumulative dose distribution to be determined through the patient’s multi-fraction treatment and adaptive treatment strategies developed to optimize the tumour response.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The natural disasters incident that frequently hit Indonesia are floods, severe droughts, tsunamis, earth-quakes, volcano, eruptions, landslides, windstorm and forest fires. The impact of those natural disasters are significantly severe and affecting the quality of life of the community due to the breakdown of the public as-sets as one source to deliver public services. This paper is aimed to emphasis the importance of natural disaster risk-informed in relation to public asset management in Indonesian Central Government, particularly in asset planning stage where asset decision is made as the gate into the whole public asset management processes. A Case study in the Ministry of Finance Indonesia as the central government public asset manager and in 5 (five) line ministries/governmental agencies as public asset users was used as the approach to achieved the research objective. The case study devoured three data collection techniques i.e. interviews, observations and document archival which will be analysed by a content analysis approach. The result of the study indicates that Indonesian geographical position exposing many of public infra-structure assets as a high vulnerability to natural disasters. Information on natural-disaster trends and predictions to identify and measure the risks are available, however, such information are not utilise and integrated to the process of public infrastructure asset planning as the gate to the whole public asset management processes. Therefore, in order to accommodate and incorporate this natural disaster risk-information into public asset management processes, particularly in public asset planning, a public asset performance measurements framework should be adopted and applied in the process as one sources in making decision for infrastructure asset planning. Findings from this study provide useful input for the Ministry of Finance as public asset manager, scholars and private asset management practitioners in Indonesia to establish natural disaster risks awareness in public infrastructure asset management processes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Council of Australian Governments (COAG) in 2003 gave in-principle approval to a best-practice report recommending a holistic approach to managing natural disasters in Australia incorporating a move from a traditional response-centric approach to a greater focus on mitigation, recovery and resilience with community well-being at the core. Since that time, there have been a range of complementary developments that have supported the COAG recommended approach. Developments have been administrative, legislative and technological, both, in reaction to the COAG initiative and resulting from regular natural disasters. This paper reviews the characteristics of the spatial data that is becoming increasingly available at Federal, state and regional jurisdictions with respect to their being fit for the purpose for disaster planning and mitigation and strengthening community resilience. In particular, Queensland foundation spatial data, which is increasingly accessible by the public under the provisions of the Right to Information Act 2009, Information Privacy Act 2009, and recent open data reform initiatives are evaluated. The Fitzroy River catchment and floodplain is used as a case study for the review undertaken. The catchment covers an area of 142,545 km2, the largest river catchment flowing to the eastern coast of Australia. The Fitzroy River basin experienced extensive flooding during the 2010–2011 Queensland floods. The basin is an area of important economic, environmental and heritage values and contains significant infrastructure critical for the mining and agricultural sectors, the two most important economic sectors for Queensland State. Consequently, the spatial datasets for this area play a critical role in disaster management and for protecting critical infrastructure essential for economic and community well-being. The foundation spatial datasets are assessed for disaster planning and mitigation purposes using data quality indicators such as resolution, accuracy, integrity, validity and audit trail.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Critical road infrastructure (such as tunnels and overpasses) is of major significance to society and constitutes major components of interdependent, ‘systems and networks’. Failure in critical components of these wide area infrastructure systems can often result in cascading disturbances with secondary and tertiary impacts - some of which may become initiating sources of failure in their own right, triggering further systems failures across wider networks. Perrow1) considered the impact of our increasing use of technology in high-risk fields, analysing the implications on everyday life and argued that designers of these types of infrastructure systems cannot predict every possible failure scenario nor create perfect contingency plans for operators. Challenges exist for transport system operators in the conceptualisation and implementation of response and subsequent recovery planning for significant events. Disturbances can vary from reduced traffic flow causing traffic congestion throughout the local road network(s) and subsequent possible loss of income to businesses and industry to a major incident causing loss of life or complete loss of an asset. Many organisations and institutions, despite increasing recognition of the effects of crisis events, are not adequately prepared to manage crises2). It is argued that operators of land transport infrastructure are in a similar category of readiness given the recent instances of failures in road tunnels. These unexpected infrastructure failures, and their ultimately identified causes, suggest there is significant room for improvement. As a result, risk profiles for road transport systems are often complex due to the human behaviours and the inter-mix of technical and organisational components and the managerial coverage needed for the socio-technical components and the physical infrastructure. In this sense, the span of managerial oversight may require new approaches to asset management that combines the notion of risk and continuity management. This paper examines challenges in the planning of response and recovery practices of owner/operators of transport systems (above and below ground) in Australia covering: • Ageing or established infrastructure; and • New-build infrastructure. With reference to relevant international contexts this paper seeks to suggest options for enhancing the planning and practice for crisis response in these transport networks and as a result support the resilience of Critical Infrastructure.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Socially just, intergenerational urban spaces should not only accommodate children and adolescents, but engage them as participants in the planning and design of welcoming spaces. With this goal, city agencies in Boulder, Colorado, the Boulder Valley School District, the Children, Youth and Environments Center at the University of Colorado, and a number of community organizations have been working in partnership to integrate young people’s ideas and concerns into the redesign of parks and civic areas and the identification of issues for city planning. Underlying their work is a commitment to the Convention on the Rights of the Child and children’s rights to active citizenship from a young age. This paper describes approaches used to engage with young people and methods of participation, and reflects on lessons learned about how to most effectively involve youth from underrepresented populations and embed diverse youth voices into the culture of city planning.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In order to meet the land use and infrastructure needs of the community with the additional challenges posed by climate change and a global recession, it is essential that Queensland local governments test their proposed integrated land use and infrastructure plans to ensure the maximum achievement of triple-bottom line sus-tainability goals. Extensive regulatory impact assessment systems are in place at the Australian and state government levels to substantiate and test policy and legislative proposals, however no such requirement has been extended to the local government level. This paper contends that with the devolution of responsibility to local government and growing impacts of local government planning and development assessment activities, impact assessment of regulatory planning instruments is appropriate and overdue. This is particularly so in the Queensland context where local governments manage metropolitan and regional scale responsibilities and their planning schemes under the Sustainable Planning Act 2009 integrate land use and infrastructure planning to direct development rights, the spatial allocation of land, and infrastructure investment. It is critical that urban planners have access to fit-for-purpose impact assessment frameworks which support this challenging task and address the important relationship between local planning and sustainable urban development. This paper uses two examples of sustainability impact assessment and a case study from the Queensland local urban planning context to build an argument and potential starting point for impact assessment in local planning processes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This thesis examines the use of network governance in US airport transportation planning activities involving taxicab services for airport patrons. The research provides US airports with new insights whereby they can successfully engage with both transportation regulatory agencies and taxicab service providers in developing mutually agreeable policies that foster the development of supply-side taxicab service improvements. A mix of quantitative and qualitative research methods is used to unearth how US airports interact with these actors, and to identify attitudes held by airport staff in their engagements involving airport taxicab planning matters. The research may ultimately lead to the achievement of sustainable increases in the air passenger ground transportation modal share at US airports, resulting in both desirable long-term operational and environmental benefits for airport management, those involved with the provision of airport taxicab services, and the traveling public.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose: Flat-detector, cone-beam computed tomography (CBCT) has enormous potential to improve the accuracy of treatment delivery in image-guided radiotherapy (IGRT). To assist radiotherapists in interpreting these images, we use a Bayesian statistical model to label each voxel according to its tissue type. Methods: The rich sources of prior information in IGRT are incorporated into a hidden Markov random field (MRF) model of the 3D image lattice. Tissue densities in the reference CT scan are estimated using inverse regression and then rescaled to approximate the corresponding CBCT intensity values. The treatment planning contours are combined with published studies of physiological variability to produce a spatial prior distribution for changes in the size, shape and position of the tumour volume and organs at risk (OAR). The voxel labels are estimated using the iterated conditional modes (ICM) algorithm. Results: The accuracy of the method has been evaluated using 27 CBCT scans of an electron density phantom (CIRS, Inc. model 062). The mean voxel-wise misclassification rate was 6.2%, with Dice similarity coefficient of 0.73 for liver, muscle, breast and adipose tissue. Conclusions: By incorporating prior information, we are able to successfully segment CBCT images. This could be a viable approach for automated, online image analysis in radiotherapy.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Adaptation to climate change is an imperative and an institutional challenge. This paper argues that the operationalisation of climate adaptation is a crucial element of a comprehensive response to the impacts of climate change on human settlements, including major cities and metropolitan areas. In this instance, the operationalisation of climate adaptation refers to climate adaptation becoming institutionally codified and implemented through planning policies and objectives, making it a central tenet of planning governance. This paper has three key purposes. First, it develops conceptual understandings of climate adaptation as an institutional challenge. Second, it identifies the intersection of this problem with planning and examines how planning regimes, as institutions, can better manage stress created by climate change impacts in human settlements. Third, it reports empirical findings focused on how the metro-regional planning regime in Southeast Queensland (SEQ), Australia, has institutionally responded to the challenge of operationalising climate adaptation. Drawing on key social scientific theories of institutionalism, it is argued that the success or failure of the SEQ planning regime's response to the imperative of climate adaptation is contingent on its ability to undergo institutional change. It is further argued that a capacity for institutional change is heavily conditioned by the influence of internal and external pathways and barriers to change, which facilitate or hinder change processes. The paper concludes that the SEQ metro-regional planning regime has undergone some institutional change but has not yet undergone change sufficient to fully operationalise climate adaptation as a central tenet of planning governance in the region.