947 resultados para Project planning
Resumo:
Recent advances in energy technology generation and new directions in electricity regulation have made distributed generation (DG) more widespread, with consequent significant impacts on the operational characteristics of distribution networks. For this reason, new methods for identifying such impacts are needed, together with research and development of new tools and resources to maintain and facilitate continued expansion towards DG. This paper presents a study aimed at determining appropriate DG sites for distribution systems. The main considerations which determine DG sites are also presented, together with an account of the advantages gained from correct DG placement. The paper intends to define some quantitative and qualitative parameters evaluated by Digsilent (R), GARP3 (R) and DSA-GD software. A multi-objective approach based on the Bellman-Zadeh algorithm and fuzzy logic is used to determine appropriate DG sites. The study also aims to find acceptable DG locations both for distribution system feeders, as well as for nodes inside a given feeder. (C) 2010 Elsevier Ltd. All rights reserved.
Resumo:
Many authors point out that the front-end of new product development (NPD) is a critical success factor in the NPD process and that numerous companies face difficulties in carrying it out appropriately. Therefore, it is important to develop new theories and proposals that support the effective implementation of this earliest phase of NPD. This paper presents a new method to support the development of front-end activities based on integrating technology roadmapping (TRM) and project portfolio management (PPM). This new method, called the ITP Method, was implemented at a small Brazilian high-tech company in the nanotechnology industry to explore the integration proposal. The case study demonstrated that the ITP Method provides a systematic procedure for the fuzzy front-end and integrates innovation perspectives into a single roadmap, which allows for a better alignment of business efforts and communication of product innovation goals. Furthermore, the results indicated that the method may also improve quality, functional integration and strategy alignment. (C) 2010 Elsevier Inc. All rights reserved.
Resumo:
This paper describes the development of an optimization model for the management and operation of a large-scale, multireservoir water supply distribution system with preemptive priorities. The model considers multiobjectives and hedging rules. During periods of drought, when water supply is insufficient to meet the planned demand, appropriate rationing factors are applied to reduce water supply. In this paper, a water distribution system is formulated as a network and solved by the GAMS modeling system for mathematical programming and optimization. A user-friendly interface is developed to facilitate the manipulation of data and to generate graphs and tables for decision makers. The optimization model and its interface form a decision support system (DSS), which can be used to configure a water distribution system to facilitate capacity expansion and reliability studies. Several examples are presented to demonstrate the utility and versatility of the developed DSS under different supply and demand scenarios, including applications to one of the largest water supply systems in the world, the Sao Paulo Metropolitan Area Water Supply Distribution System in Brazil.
Resumo:
Simulated annealing (SA) is an optimization technique that can process cost functions with degrees of nonlinearities, discontinuities and stochasticity. It can process arbitrary boundary conditions and constraints imposed on these cost functions. The SA technique is applied to the problem of robot path planning. Three situations are considered here: the path is represented as a polyline; as a Bezier curve; and as a spline interpolated curve. In the proposed SA algorithm, the sensitivity of each continuous parameter is evaluated at each iteration increasing the number of accepted solutions. The sensitivity of each parameter is associated to its probability distribution in the definition of the next candidate. (C) 2010 Elsevier Ltd. All rights reserved.
Resumo:
This pilot project at Cotton Tree, Maroochydore, on two adjacent, linear parcels of land has one of the properties privately owned while the other is owned by the public housing authority. Both owners commissioned Lindsay and Kerry Clare to design housing for their separate needs which enabled the two projects to be governed by a single planning and design strategy. This entailed the realignment of the dividing boundary to form two approximately square blocks which made possible the retention of an important stand of mature paperbark trees and gave each block a more useful street frontage. The scheme provides seven two-bedroom units and one single-bedroom unit as the private component, with six single-bedroom units, three two-bedroom units and two three-bedroom units forming the public housing. The dwellings are deployed as an interlaced mat of freestanding blocks, car courts, courtyard gardens, patios and decks. The key distinction between the public and private parts of the scheme is the pooling of the car parking spaces in the public housing to create a shared courtyard. The housing climbs to three storeys on its southern edge and falls to a single storey on the north-western corner. This enables all units and the principal private outdoor spaces to have a northern orientation. The interiors of both the public and private units are skilfully arranged to take full advantage of views, light and breeze.
Resumo:
This pilot project at Cotton Tree, Maroochydore, on two adjacent, linear parcels of land has one of the properties privately owned while the other is owned by the public housing authority. Both owners commissioned Lindsay and Kerry Clare to design housing for their separate needs which enabled the two projects to be governed by a single planning and design strategy. This entailed the realignment of the dividing boundary to form two approximately square blocks which made possible the retention of an important stand of mature paperbark trees and gave each block a more useful street frontage. The scheme provides seven two-bedroom units and one single-bedroom unit as the private component, with six single-bedroom units, three two-bedroom units and two three-bedroom units forming the public housing. The dwellings are deployed as an interlaced mat of freestanding blocks, car courts, courtyard gardens, patios and decks. The key distinction between the public and private parts of the scheme is the pooling of the car parking spaces in the public housing to create a shared courtyard. The housing climbs to three storeys on its southern edge and falls to a single storey on the north-western corner. This enables all units and the principal private outdoor spaces to have a northern orientation. The interiors of both the public and private units are skilfully arranged to take full advantage of views, light and breeze.
Resumo:
This pilot project at Cotton Tree, Maroochydore, on two adjacent, linear parcels of land has one of the properties privately owned while the other is owned by the public housing authority. Both owners commissioned Lindsay and Kerry Clare to design housing for their separate needs which enabled the two projects to be governed by a single planning and design strategy. This entailed the realignment of the dividing boundary to form two approximately square blocks which made possible the retention of an important stand of mature paperbark trees and gave each block a more useful street frontage. The scheme provides seven two-bedroom units and one single-bedroom unit as the private component, with six single-bedroom units, three two-bedroom units and two three-bedroom units forming the public housing. The dwellings are deployed as an interlaced mat of freestanding blocks, car courts, courtyard gardens, patios and decks. The key distinction between the public and private parts of the scheme is the pooling of the car parking spaces in the public housing to create a shared courtyard. The housing climbs to three storeys on its southern edge and falls to a single storey on the north-western corner. This enables all units and the principal private outdoor spaces to have a northern orientation. The interiors of both the public and private units are skilfully arranged to take full advantage of views, light and breeze.
Resumo:
This pilot project at Cotton Tree, Maroochydore, on two adjacent, linear parcels of land has one of the properties privately owned while the other is owned by the public housing authority. Both owners commissioned Lindsay and Kerry Clare to design housing for their separate needs which enabled the two projects to be governed by a single planning and design strategy. This entailed the realignment of the dividing boundary to form two approximately square blocks which made possible the retention of an important stand of mature paperbark trees and gave each block a more useful street frontage. The scheme provides seven two-bedroom units and one single-bedroom unit as the private component, with six single-bedroom units, three two-bedroom units and two three-bedroom units forming the public housing. The dwellings are deployed as an interlaced mat of freestanding blocks, car courts, courtyard gardens, patios and decks. The key distinction between the public and private parts of the scheme is the pooling of the car parking spaces in the public housing to create a shared courtyard. The housing climbs to three storeys on its southern edge and falls to a single storey on the north-western corner. This enables all units and the principal private outdoor spaces to have a northern orientation. The interiors of both the public and private units are skilfully arranged to take full advantage of views, light and breeze.
Resumo:
This pilot project at Cotton Tree, Maroochydore, on two adjacent, linear parcels of land has one of the properties privately owned while the other is owned by the public housing authority. Both owners commissioned Lindsay and Kerry Clare to design housing for their separate needs which enabled the two projects to be governed by a single planning and design strategy. This entailed the realignment of the dividing boundary to form two approximately square blocks which made possible the retention of an important stand of mature paperbark trees and gave each block a more useful street frontage. The scheme provides seven two-bedroom units and one single-bedroom unit as the private component, with six single-bedroom units, three two-bedroom units and two three-bedroom units forming the public housing. The dwellings are deployed as an interlaced mat of freestanding blocks, car courts, courtyard gardens, patios and decks. The key distinction between the public and private parts of the scheme is the pooling of the car parking spaces in the public housing to create a shared courtyard. The housing climbs to three storeys on its southern edge and falls to a single storey on the north-western corner. This enables all units and the principal private outdoor spaces to have a northern orientation. The interiors of both the public and private units are skilfully arranged to take full advantage of views, light and breeze.
Resumo:
This pilot project at Cotton Tree, Maroochydore, on two adjacent, linear parcels of land has one of the properties privately owned while the other is owned by the public housing authority. Both owners commissioned Lindsay and Kerry Clare to design housing for their separate needs which enabled the two projects to be governed by a single planning and design strategy. This entailed the realignment of the dividing boundary to form two approximately square blocks which made possible the retention of an important stand of mature paperbark trees and gave each block a more useful street frontage. The scheme provides seven two-bedroom units and one single-bedroom unit as the private component, with six single-bedroom units, three two-bedroom units and two three-bedroom units forming the public housing. The dwellings are deployed as an interlaced mat of freestanding blocks, car courts, courtyard gardens, patios and decks. The key distinction between the public and private parts of the scheme is the pooling of the car parking spaces in the public housing to create a shared courtyard. The housing climbs to three storeys on its southern edge and falls to a single storey on the north-western corner. This enables all units and the principal private outdoor spaces to have a northern orientation. The interiors of both the public and private units are skilfully arranged to take full advantage of views, light and breeze.
Resumo:
This pilot project at Cotton Tree, Maroochydore, on two adjacent, linear parcels of land has one of the properties privately owned while the other is owned by the public housing authority. Both owners commissioned Lindsay and Kerry Clare to design housing for their separate needs which enabled the two projects to be governed by a single planning and design strategy. This entailed the realignment of the dividing boundary to form two approximately square blocks which made possible the retention of an important stand of mature paperbark trees and gave each block a more useful street frontage. The scheme provides seven two-bedroom units and one single-bedroom unit as the private component, with six single-bedroom units, three two-bedroom units and two three-bedroom units forming the public housing. The dwellings are deployed as an interlaced mat of freestanding blocks, car courts, courtyard gardens, patios and decks. The key distinction between the public and private parts of the scheme is the pooling of the car parking spaces in the public housing to create a shared courtyard. The housing climbs to three storeys on its southern edge and falls to a single storey on the north-western corner. This enables all units and the principal private outdoor spaces to have a northern orientation. The interiors of both the public and private units are skilfully arranged to take full advantage of views, light and breeze.
Resumo:
This pilot project at Cotton Tree, Maroochydore, on two adjacent, linear parcels of land has one of the properties privately owned while the other is owned by the public housing authority. Both owners commissioned Lindsay and Kerry Clare to design housing for their separate needs which enabled the two projects to be governed by a single planning and design strategy. This entailed the realignment of the dividing boundary to form two approximately square blocks which made possible the retention of an important stand of mature paperbark trees and gave each block a more useful street frontage. The scheme provides seven two-bedroom units and one single-bedroom unit as the private component, with six single-bedroom units, three two-bedroom units and two three-bedroom units forming the public housing. The dwellings are deployed as an interlaced mat of freestanding blocks, car courts, courtyard gardens, patios and decks. The key distinction between the public and private parts of the scheme is the pooling of the car parking spaces in the public housing to create a shared courtyard. The housing climbs to three storeys on its southern edge and falls to a single storey on the north-western corner. This enables all units and the principal private outdoor spaces to have a northern orientation. The interiors of both the public and private units are skilfully arranged to take full advantage of views, light and breeze.
Resumo:
This pilot project at Cotton Tree, Maroochydore, on two adjacent, linear parcels of land has one of the properties privately owned while the other is owned by the public housing authority. Both owners commissioned Lindsay and Kerry Clare to design housing for their separate needs which enabled the two projects to be governed by a single planning and design strategy. This entailed the realignment of the dividing boundary to form two approximately square blocks which made possible the retention of an important stand of mature paperbark trees and gave each block a more useful street frontage. The scheme provides seven two-bedroom units and one single-bedroom unit as the private component, with six single-bedroom units, three two-bedroom units and two three-bedroom units forming the public housing. The dwellings are deployed as an interlaced mat of freestanding blocks, car courts, courtyard gardens, patios and decks. The key distinction between the public and private parts of the scheme is the pooling of the car parking spaces in the public housing to create a shared courtyard. The housing climbs to three storeys on its southern edge and falls to a single storey on the north-western corner. This enables all units and the principal private outdoor spaces to have a northern orientation. The interiors of both the public and private units are skilfully arranged to take full advantage of views, light and breeze.
Curriculum change and the post-modern world: Is the school curriculum-reform project an anachronism?
Resumo:
Market-based transmission expansion planning gives information to investors on where is the most cost efficient place to invest and brings benefits to those who invest in this grid. However, both market issue and power system adequacy problems are system planers’ concern. In this paper, a hybrid probabilistic criterion of Expected Economical Loss (EEL) is proposed as an index to evaluate the systems’ overall expected economical losses during system operation in a competitive market. It stands on both investors’ and planner’s point of view and will further improves the traditional reliability cost. By applying EEL, it is possible for system planners to obtain a clear idea regarding the transmission network’s bottleneck and the amount of losses arises from this weak point. Sequentially, it enables planners to assess the worth of providing reliable services. Also, the EEL will contain valuable information for moneymen to undertake their investment. This index could truly reflect the random behaviors of power systems and uncertainties from electricity market. The performance of the EEL index is enhanced by applying Normalized Coefficient of Probability (NCP), so it can be utilized in large real power systems. A numerical example is carried out on IEEE Reliability Test System (RTS), which will show how the EEL can predict the current system bottleneck under future operational conditions and how to use EEL as one of planning objectives to determine future optimal plans. A well-known simulation method, Monte Carlo simulation, is employed to achieve the probabilistic characteristic of electricity market and Genetic Algorithms (GAs) is used as a multi-objective optimization tool.