805 resultados para Process of construction
Resumo:
Background: There is general agreement across all interested parties that a process of working together is the best way to determine which school or educational setting is right for an individual child with autism spectrum disorder. In the UK, families and local authorities both desire a constructive working relationship and see this as the best means by which to reach an agreement to determine where a child should be educated. It has been shown in published works 1 1. Batten and colleagues (Make schools make sense. Autism and education: the reality for families today; London: The National Autistic Society, 2006). View all notes that a constructive working relationship is not always achieved. Purpose: This small-scale study aims to explore the views of both parents and local authorities, focussing on how both parties perceive and experience the process of determining educational provision for children with autism spectrum disorders (ASD) within an English context. Sample, design and method: Parental opinion was gathered through the use of a questionnaire with closed and open responses. The questionnaire was distributed to two national charities, two local charities and 16 specialist schools, which offered the questionnaire to parents of children with ASD, resulting in an opportunity sample of 738 returned surveys. The views of local authority personnel from five local authorities were gathered through the use of semi-structured interviews. Data analyses included quantitative analysis of the closed response questionnaire items, and theme-based qualitative analysis of the open responses and interviews with local authority personnel. Results: In the majority of cases, parents in the survey obtained their first choice placement for their child. Despite this positive outcome, survey data indicated that parents found the process bureaucratic, stressful and time consuming. Parents tended to perceive alternative placement suggestions as financially motivated rather than in the best interests of the child. Interviews with local authority personnel showed an awareness of these concerns and the complex considerations involved in determining what is best for an individual child. Conclusions: This small-scale study highlights the need for more effective communication between parents of children with ASDs and local authority personnel at all stages of the process
Resumo:
The paper provides details of the size and scope of construction research carried out in a number of architecture, civil engineering and building related departments in British universities. After considering the level of funding, the type of research projects undertaken and the resulting outputs, especially how these benefit industry, the paper focuses on the careers of academics and researchers and the way in which research is organized at university, departmental and team levels. Finally, the paper suggests that whilst the construction research community in universities has many strengths, there is a danger that in responding to recent opportunities it may overreach itself. The end result may be disappointing for all parties involved. Some of the factors which would contribute to an effective approach to the development of links between universities and industry are discussed.
Resumo:
Expectations of future market conditions are generally acknowledged to be crucial for the development decision and hence for shaping the built environment. This empirical study of the Central London office market from 1987 to 2009 tests for evidence of adaptive and naive expectations. Applying VAR models and a recursive OLS regression with one-step forecasts, we find evidence of adaptive and naïve, rather than rational expectations of developers. Although the magnitude of the errors and the length of time lags vary over time and development cycles, the results confirm that developers’ decisions are explained to a large extent by contemporaneous and past conditions in both London submarkets. The corollary of this finding is that developers may be able to generate excess profits by exploiting market inefficiencies but this may be hindered in practice by the long periods necessary for planning and construction of the asset. More generally, the results of this study suggest that real estate cycles are largely generated endogenously rather than being the result of unexpected exogenous shocks.
Resumo:
The construction industry has become a truly global network of interconnected stakeholders making demands which require the involvement of skilled workforces from all over the world. Construction Management Strategies sets the foundations for understanding and managing construction’s inherent complexity and uniqueness. It establishes clear definitions of commonly accepted terms like built environment, construction, civil engineering, etc. which are often given confusing and conflicting interpretations. It cuts through the plethora of overlapping role titles currently used in the construction sector that make it difficult to establish how projects are actually managed.
Resumo:
In today's global economic conditions, improving the productivity of the construction industry is becoming more pressing than ever. Several factors impact the efficiency of construction operatives, but motivation is among the most important. Since low productivity is one of the significant challenges facing the construction industry in the State of Kuwait, the objective of this case study is to identify, explore, and rank the relative importance of the factors perceived to impact the motivational level of master craftsmen involved in primary construction trades. To achieve this objective, a structured questionnaire survey comprising 23 factors, which were shortlisted based on relevant previous research on motivation, the input of local industry experts, and numerous interviews with skilled operatives, was distributed to a large number of master craftsmen. Using the “Relative Importance Index” technique, the following prominent factors are identified: (1) payment delay; (2) rework; (3) lack of a financial incentive scheme; (4) the extent of change orders during execution; (5) incompetent supervisors; (6) delays in responding to Requests For Information (RFI); (7) overcrowding and operatives interface; (8) unrealistic scheduling and performance expectation; (9) shortage of materials on site; and (10) drawings quality level. The findings can be used to provide industry practitioners with guidance for focusing, acting upon, and controlling the critical factors influencing the performance of master craftsmen, hence, assist in achieving an efficient utilization of the workforce, and a reasonable level of competitiveness and cost effective operation.
Resumo:
Communities are increasingly empowered with the ability and responsibility of working with national governments to make decisions about marine resources in decentralized co-management arrangements. This transition toward decentralized management represents a changing governance landscape. This paper explores the transition to decentralisation in marine resource management systems in three East African countries. The paper draws upon expert opinion and literature from both political science and linked social-ecological systems fields to guide exploration of five key governance transition concepts in each country: (1) drivers of change; (2) institutional arrangments; (3 institutional fit; (4) actor interactions; and (5) adaptive management. Key findings are that decentralized management in the region was largely donor-driven and only partly tranferred power to local stakeholders. However, increased accountability created a degree of democracy in regards to natural resource governance that was not previously present. Additionally, increased local-level adaptive management has emerged in most systems and, to date, this experimental management has helped to change resource user's views from metaphysical to more scientific cause-and-effect attribution of changes to resource conditions.