952 resultados para Priority queues


Relevância:

10.00% 10.00%

Publicador:

Resumo:

In beacon-enabled mode, IEEE 802.15.4 is ruled by the slotted CSMA/CA Medium Access Control (MAC) protocol. The standard slotted CSMA/CA mechanism does not provide any means of differentiated services to improve the quality of service for timecritical events (such as alarms, time slot reservation, PAN management messages etc.). In this paper, we present and discuss practical service differentiation mechanisms to improve the performance of slotted CSMA/CA for time-critical events, with only minor add-ons to the protocol. The contribution of our proposal is more practical than theoretical since our initial requirement is to leave the original algorithm of the slotted CSMA/CA unchanged, but rather tuning its parameters adequately according to the criticality of the messages. We present a simulation study based on an accurate model of the IEEE 802.15.4 MAC protocol, to evaluate the differentiated service strategies. Four scenarios with different settings of the slotted CSMA/CA parameters are defined. Each scenario is evaluated for FIFO and Priority Queuing. The impact of the hiddennode problem is also analyzed, and a solution to mitigate it is proposed.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Consider the problem of scheduling sporadic message transmission requests with deadlines. For wired channels, this has been achieved successfully using the CAN bus. For wireless channels, researchers have recently proposed a similar solution; a collision-free medium access control (MAC) protocol that implements static-priority scheduling. Unfortunately no implementation has been reported, yet. We implement and evaluate it to find that the implementation indeed is collision-free and prioritized. This allows us to develop schedulability analysis for the implementation. We measure the response times of messages in our implementation and find that our new response-time analysis indeed offers an upper bound on the response times. This enables a new class of wireless real-time systems with timeliness guarantees for sporadic messages and it opens-up a new research area: schedulability analysis for wireless networks.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

We propose a collision-free medium access control (MAC) protocol, which implements static-priority scheduling and works in the presence of hidden nodes. The MAC protocol allows multiple masters and is fully distributed; it is an adaptation to a wireless channel of the dominance protocol used in the CAN bus. But unlike that protocol, our protocol does not require a node having the ability to sense the channel while transmitting to the channel. Our protocol is collision-free even in the presence of hidden nodes and it achieves this without synchronized clocks or out-of-band busy tones. In addition, the protocol is designed to ensure that many non-interfering nodes can transmit in parallel and it functions for both broadcast and unicast transmissions.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The resource constrained project scheduling problem (RCPSP) is a difficult problem in combinatorial optimization for which extensive investigation has been devoted to the development of efficient algorithms. During the last couple of years many heuristic procedures have been developed for this problem, but still these procedures often fail in finding near-optimal solutions. This paper proposes a genetic algorithm for the resource constrained project scheduling problem. The chromosome representation of the problem is based on random keys. The schedule is constructed using a heuristic priority rule in which the priorities and delay times of the activities are defined by the genetic algorithm. The approach was tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

- The resource constrained project scheduling problem (RCPSP) is a difficult problem in combinatorial optimization for which extensive investigation has been devoted to the development of efficient algorithms. During the last couple of years many heuristic procedures have been developed for this problem, but still these procedures often fail in finding near-optimal solutions. This paper proposes a genetic algorithm for the resource constrained project scheduling problem. The chromosome representation of the problem is based on random keys. The schedule is constructed using a heuristic priority rule in which the priorities and delay times of the activities are defined by the genetic algorithm. The approach was tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper presents a biased random-key genetic algorithm for the resource constrained project scheduling problem. The chromosome representation of the problem is based on random keys. Active schedules are constructed using a priority-rule heuristic in which the priorities of the activities are defined by the genetic algorithm. A forward-backward improvement procedure is applied to all solutions. The chromosomes supplied by the genetic algorithm are adjusted to reflect the solutions obtained by the improvement procedure. The heuristic is tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A racionalização do uso de medicamentos constitui-se como um fator contribuinte para a melhoria da segurança do doente, particularmente no que respeita à segurança na medicação, tendo-se tornado prioritária para as organizações e instituições de saúde. A avaliação do uso de medicamentos inapropriados no idoso constitui-se como uma medida que concorre para evitar, prevenir ou corrigir eventos adversos associados ao seu uso. As benzodiazepinas são uma das classes de medicamentos mais prescritas em idosos. No entanto, e apesar de sua utilidade clínica, algumas benzodiazepinas são consideradas inapropriadas nesta faixa etária por potenciarem o efeito sedativo e aumentar a incidência de quedas e fraturas. A longo prazo, na promoção da qualidade do sono, a sua efetividade é discutível já que a toma de uma benzodiazepina para a resolução de um problema como o sono, muitas vezes pontual, passa a ser um problema crónico de exigência de toma contínua, sem que a qualidade deste seja restabelecida, pondo em risco a segurança do doente. Este estudo tem como objetivo caracterizar o consumo de benzodiazepinas por idosos institucionalizados, numa instituição de longa permanência do concelho de Sesimbra, sua inapropriação e a relação com a qualidade de sono. Foi desenvolvido um estudo descritivo e transversal, assente no paradigma qualitativo, com a recolha de dados a decorrer em três momentos: registo de informação em grelha própria da caracterização sociodemográfica e da caracterização do consumo de benzodiazepinas; aplicação do índice de Katz para determinar a funcionalidade dos participantes; aplicação do questionário adaptado do Pittsburgh Sleep Quality Index para avaliação da qualidade do sono. A inapropriação foi avaliada pela aplicação dos critérios de Beers. Após aplicação dos critérios de inclusão (idade superior a 65 anos e capacidade funcional) aos 97 utentes da instituição, a amostra foi constituída por 51 utentes. Foi recolhido consentimento informado de todos os participantes. Os resultados obtidos mostram que 46% das benzodiazepinas consumidas são de duração intermédia de ação, observando-se ainda um valor considerável de consumo de benzodiazepinas de longa duração de ação (36%). Estes valores correspondem a um grau elevado de inapropriação, potenciando os riscos para a segurança do doente nesta faixa etária. O lorazepam 2,5mg é a benzodiazepina mais utilizada como hipnótico. Mas, apesar do consumo deste grupo de medicamentos 81,6% dos idosos que consumem benzodiazepinas não apresentam boa qualidade de sono (PSQI>5), enquanto 77% dos idosos que não consomem benzodiazepinas apresentam boa qualidade de sono (PSQI≤5). Nos idosos que consomem benzodiazepinas, a média de tempo despendido na cama até adormecer foi de cerca de 55 minutos, valor superior ao grupo que não consome benzodiazepinas, onde a média é de 27 minutos. Neste grupo de idosos, o consumo de benzodiazepinas não só é inapropriado como não contribuiu para uma melhoria na qualidade de sono nem para a segurança do doente, como são os consumidores de benzodiazepinas que apresentam uma pior qualidade de sono, nas suas várias dimensões.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

ABSTRACT OBJECTIVE To describe the spatial distribution of avoidable hospitalizations due to tuberculosis in the municipality of Ribeirao Preto, SP, Brazil, and to identify spatial and space-time clusters for the risk of occurrence of these events. METHODS This is a descriptive, ecological study that considered the hospitalizations records of the Hospital Information System of residents of Ribeirao Preto, SP, Southeastern Brazil, from 2006 to 2012. Only the cases with recorded addresses were considered for the spatial analyses, and they were also geocoded. We resorted to Kernel density estimation to identify the densest areas, local empirical Bayes rate as the method for smoothing the incidence rates of hospital admissions, and scan statistic for identifying clusters of risk. Softwares ArcGis 10.2, TerraView 4.2.2, and SaTScanTM were used in the analysis. RESULTS We identified 169 hospitalizations due to tuberculosis. Most were of men (n = 134; 79.2%), averagely aged 48 years (SD = 16.2). The predominant clinical form was the pulmonary one, which was confirmed through a microscopic examination of expectorated sputum (n = 66; 39.0%). We geocoded 159 cases (94.0%). We observed a non-random spatial distribution of avoidable hospitalizations due to tuberculosis concentrated in the northern and western regions of the municipality. Through the scan statistic, three spatial clusters for risk of hospitalizations due to tuberculosis were identified, one of them in the northern region of the municipality (relative risk [RR] = 3.4; 95%CI 2.7–4,4); the second in the central region, where there is a prison unit (RR = 28.6; 95%CI 22.4–36.6); and the last one in the southern region, and area of protection for hospitalizations (RR = 0.2; 95%CI 0.2–0.3). We did not identify any space-time clusters. CONCLUSIONS The investigation showed priority areas for the control and surveillance of tuberculosis, as well as the profile of the affected population, which shows important aspects to be considered in terms of management and organization of health care services targeting effectiveness in primary health care.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper presents a genetic algorithm for the Resource Constrained Project Scheduling Problem (RCPSP). The chromosome representation of the problem is based on random keys. The schedule is constructed using a heuristic priority rule in which the priorities of the activities are defined by the genetic algorithm. The heuristic generates parameterized active schedules. The approach was tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper presents an optimization approach for the job shop scheduling problem (JSSP). The JSSP is a difficult problem in combinatorial optimization for which extensive investigation has been devoted to the development of efficient algorithms. The proposed approach is based on a genetic algorithm technique. The scheduling rules such as SPT and MWKR are integrated into the process of genetic evolution. The chromosome representation of the problem is based on random keys. The schedules are constructed using a priority rule in which the priorities and delay times of the operations are defined by the genetic algorithm. Schedules are constructed using a procedure that generates parameterized active schedules. After a schedule is obtained a local search heuristic is applied to improve the solution. The approach is tested on a set of standard instances taken from the literature and compared with other approaches. The computation results validate the effectiveness of the proposed approach.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Relatório da Prática Profissional Supervisionada Mestrado em Educação Pré-Escolar

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Relatório de estágio apresentado à Escola Superior de Educação de Lisboa para obtenção de grau de mestre em Ensino do 1.º e 2.º Ciclo do Ensino Básico

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Mestrado em Auditoria

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Este documento apresenta o trabalho desenvolvido no âmbito da disciplina de “Dissertação/Projeto/Estágio”, do 2º ano do Mestrado em Energias Sustentáveis. O crescente consumo energético das sociedades desenvolvidas e emergentes, associado ao consequente aumento dos custos de energia e dos danos ambientais resultantes, promove o desenvolvimento de novas formas de produção de energia, as quais têm como prioridade a sua obtenção ao menor custo possível e com reduzidos impactos ambientais. De modo a poupar os recursos naturais e reduzir a emissão com gases de efeito de estufa, é necessária a diminuição do consumo de energia produzida a partir de combustíveis fósseis. Assim, devem ser criadas alternativas para um futuro sustentável, onde as fontes renováveis de energia assumam um papel fundamental. Neste sentido, a produção de energia elétrica, através de sistemas solares fotovoltaicos, surge como uma das soluções. A presente dissertação tem como principal objetivo a realização do dimensionamento de uma central de miniprodução fotovoltaica, com ligação à rede elétrica, em uma exploração agrícola direcionada à indústria de laticínios, e o seu respetivo estudo de viabilidade económica. A exploração agrícola, que serve de objeto de estudo, está localizada na Ilha Graciosa, Açores, sendo a potência máxima a injetar na Rede Elétrica de Serviço Público, pela central de miniprodução, de 10 kW. Para o dimensionamento foi utilizado um software apropriado e reconhecido na área da produção de energia elétrica através de sistemas fotovoltaicos – o PVsyst –, compreendendo as seguintes etapas: a) definição das caraterísticas do local e do projeto; b) seleção dos módulos fotovoltaicos; c) seleção do inversor; d) definição da potência de ligação à rede elétrica da unidade de miniprodução. Posteriormente, foram estudadas diferentes hipóteses de sistemas fotovoltaicos, que se distinguem na opção de estrutura de fixação utilizada: dois sistemas fixos e dois com eixo incorporado. No estudo de viabilidade económica foram realizadas duas análises distintas a cada um dos sistemas fotovoltaicos considerados no dimensionamento, nomeadamente: uma análise em regime remuneratório bonificado e uma análise em regime remuneratório geral. Os resultados obtidos nos indicadores económicos do estudo de viabilidade económica realizado, serviram de apoio à decisão pelo sistema fotovoltaico mais favorável ao investimento. Conclui-se que o sistema fotovoltaico com inclinação adicional é a opção mais vantajosa em ambos os regimes remuneratórios analisados. Comprova-se, assim, que o sistema fotovoltaico com maior valor de produção de energia elétrica anual, que corresponde ao sistema fotovoltaico de dois eixos, não é a opção com maior rentabilidade em termos económicos, isto porque a remuneração proveniente da sua produção excedente não é suficiente para colmatar o valor do investimento mais acentuado de modo a obter indicadores económicos mais favoráveis, que os do sistema fotovoltaico com inclinação adicional. De acordo com o estudo de viabilidade económica efetuado independentemente do sistema fotovoltaico que seja adotado, é recuperado o investimento realizado, sendo a remuneração efetiva superior à que foi exigida. Assim, mesmo tendo em consideração o risco associado, comprova-se que todos os sistemas fotovoltaicos, em qualquer dos regimes remuneratórios, correspondem a investimentos rentáveis.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Os profissionais de saúde mental são o principal instrumento de intervenção nesta área considerada como prioridade de Saúde Pública e estão sujeitos a desgaste emocional e stress, que pode afetar negativamente a sua qualidade de vida. Com este estudo pretende-se avaliar a perceção do estado de saúde e da qualidade de vida relacionada com a saúde nos profissionais de saúde mental. Para responder ao objetivo traçado optou-se por realizar um estudo observacional analítico transversal, com abordagem quantitativa. Foi utilizado o SF36v2 como instrumento genérico de avaliação da Qualidade de Vida, que já se encontra validado para a população portuguesa, complementado por um questionário socioprofissional. A recolha de dados decorreu online, de 28 de Janeiro a 30 de Abril de 2013. A amostra foi constituída por 201 profissionais de saúde mental de Portugal Continental. Os profissionais de saúde mental que integraram a amostra revelaram pior perceção do estado de saúde e qualidade de vida, quando comparados com os valores de referência para a população portuguesa com nível de instrução alto. Em termos de domínios do instrumento, piores resultados foram encontrados para todos eles com exceção do domínio Saúde Mental. A avaliação da qualidade de vida dos profissionais de saúde mental possibilita a implementação alterações no funcionamento dos serviços de saúde mental, nomeadamente de programas de gestão de stress, de estratégias de coping e de competências de interação e comunicação entre os profissionais, podendo contribuir para uma melhoria na prestação dos cuidados de saúde aos utentes.