942 resultados para Performance Appraisal, Management
Resumo:
Purpose: The aim of this article is to detail the correlation between quality management, specifically its tools and critical success factors, and performance in terms of primary operational and secondary organisational performances. Design/methodology/approach: Survey data from the UK and Turkey were analysed using exploratory factor analyses, structural equation modelling and regression analysis. Findings: The results show that quality management has a significant and positive impact on both primary and secondary performances; that Turkish and UK attitudes to quality management are similar; and that quality management is widely practised in manufacturing and service industries but has more statistical emphasis in the manufacturing sector. The main challenge for making quality management practice more effective lies in an appropriate balanced use of the different sorts of the tools and critical success factors. Originality/value: This study takes a novel approach by: (i) exploring the relationship between primary operational and secondary organisational performances, (ii) using service and manufacturing data and (iii) making a cross-country comparison between the UK (a developed economy) and Turkey (a developing economy). Limitations: Detailed contrast provided between only two countries. © 2013 Copyright Taylor and Francis Group, LLC.
Resumo:
This project is focused on exchanging knowledge between ABS, UKBI and managers of business incubators in the UK. The project relates to exploitation of extant knowledge-base on assessing and improving business incubation management practice and performance and builds on two earlier studies. It addresses a pressing need for assessing and benchmarking business incubation input, process and outcome performance and highlighting best practice. The overarching aim of this project was to obtain proof-of-concept for a business incubation performance assessment and benchmarking online tool, fine-tune it and put it in use by nurturing a community of business incubation management practice, aligned by the resultant tool. The purpose was to offer an appropriate set of measures, in areas identified by relevant research on business incubation performance management and impact as critical, against which: 1.The input and process performance of business incubation management practice can be assessed and benchmarked within the auspices of a community of incubator managers concerned with best practice 2.The outcome performance and impact of business incubators can be assessed longitudinally. As such, the developed online assessment framework is geared towards the needs of researchers, policy makers and practitioners concerned with business incubation performance, added value and impact.
Resumo:
Purpose – The purpose of the paper was to conduct an empirical investigation to explore the impact of project management maturity models (PMMMs) on improving project performance. Design/methodology/approach – The investigation used a cross-case analysis involving over 90 individuals in seven organisations. Findings – The findings of the empirical investigation indicate that PMMMs demonstrate very high levels of variability in individual's assessment of project management maturity. Furthermore, at higher levels of maturity, the type of performance improvement adopted following their application is related to the type of PMMM used in the assessment. The paradox of the unreliability of PMMMs and their widespread acceptance is resolved by calling upon the “wisdom of crowds” phenomenon which has implications for the use of maturity model assessments in other arena. Research limitations/implications – The investigation does have the usual issues associated with case research, but the steps that have been taken in the cross-case construction and analysis have improved the overall robustness and extendibility of the findings. Practical implications – The tendency for PMMMs to shape improvements based on their own inherent structure needs further understanding. Originality/value – The use of empirical methods to investigate the link between project maturity models and extant changes in project management performance is highly novel and the findings that result from this have added resonance.
Resumo:
We examine the impact of the fiber type and dispersion management on the performance of a 16 × 40 Gb/s dense wavelength-division-multiplexing nonreturn-to-zero transmission system. The transmission line is composed of G.652 or G.655 fiber with periodic dispersion compensation and hybrid Raman erbium-doped fiber amplifier amplification.
Resumo:
The profusion of performance measurement models suggested by Management Accounting literature in the 1990’s is one illustration of the substantial changes in Management Accounting teaching materials since the publication of “Relevance Lost” in 1987. At the same time, in the general context of increasing competition and globalisation it is widely thought that national cultural differences are tending to disappear, meaning that management techniques used in large companies, including performance measurement and management instruments (PMS), tend to be the same, irrespective of the company nationality or location. North American management practice is traditionally described as a contractually based model, mainly focused on financial performance information and measures (FPMs), more shareholder-focused than French companies. Within France, literature historically defined performance as being broadly multidimensional, driven by the idea that there are no universal rules of management and that efficient management takes into account local culture and traditions. As opposed to their North American brethren, French companies are pressured more by the financial institutions that fund them rather than by capital markets. Therefore, they pay greater attention to the long-term because they are not subject to quarterly capital market objectives. Hence, management in France should rely more on long-term qualitative information, less financial, and more multidimensional data to assess performance than their North American counterparts. The objective of this research is to investigate whether large French and US companies’ practices have changed in the way the textbooks have changed with regards to performance measurement and management, or whether cultural differences are still driving differences in performance measurement and management between them. The research findings support the idea that large US and French companies share the same PMS features, influenced by ‘universal’ PM models.
Resumo:
Margaret Woods discusses lessons from the UK's too organizations on integrating risk and performance management.
Resumo:
This article argues that, post Enron, governance reforms around the world have served to raise the profile of risk management, and emphasise the need for a corporate wide approach to internal control that is overseen by the Board of Directors. In the US, this is most clearly demonstrated by the emergence of Enterprise Risk Management (ERM), defined as 'a process, effected by an entity's board of directors, management and other personnel, applied in strategy setting across the enterprise, designed to identify potential events that may affect the entity, and manage risk to be within its risk appetite, to provide reasonable assurance regarding the achievement of entity objectives.' (COSO, 2004, p.2). In practical terms, however, the introduction of an enterprise wide holistic risk management system poses a big challenge to all but the smallest of organisations. The financial crisis has clearly shown that enterprise wide risk management remains a dream rather than a reality for even the world's largest and once highly respected companies.
Resumo:
We examine impact of the fiber type and nonlinear management over the performance of a 16x40Gb/s DWDM NRZ transmission system. The line is constituted of 3x100km of G.652 or G.655 fiber with hybrid Raman-EDFA amplification.
Resumo:
This thesis is a study of performance management of Complex Event Processing (CEP) systems. Since CEP systems have distinct characteristics from other well-studied computer systems such as batch and online transaction processing systems and database-centric applications, these characteristics introduce new challenges and opportunities to the performance management for CEP systems. Methodologies used in benchmarking CEP systems in many performance studies focus on scaling the load injection, but not considering the impact of the functional capabilities of CEP systems. This thesis proposes the approach of evaluating the performance of CEP engines’ functional behaviours on events and develops a benchmark platform for CEP systems: CEPBen. The CEPBen benchmark platform is developed to explore the fundamental functional performance of event processing systems: filtering, transformation and event pattern detection. It is also designed to provide a flexible environment for exploring new metrics and influential factors for CEP systems and evaluating the performance of CEP systems. Studies on factors and new metrics are carried out using the CEPBen benchmark platform on Esper. Different measurement points of response time in performance management of CEP systems are discussed and response time of targeted event is proposed to be used as a metric for quality of service evaluation combining with the traditional response time in CEP systems. Maximum query load as a capacity indicator regarding to the complexity of queries and number of live objects in memory as a performance indicator regarding to the memory management are proposed in performance management of CEP systems. Query depth is studied as a performance factor that influences CEP system performance.