961 resultados para M OPERATION
Resumo:
Real operation scene This scene was recorded during a real Irradiation operation, more specifically during its final tasks (removing the irradiated sample). This scene was an extra recording to the script and planned ones. - Scene: Involved a number of persons, as: two operators, two personnel belonging to the radiological protection service, and the "client" who asked for the irradiation. Video file labels: "20140402150657_IPCAM": recorded by the right camera.
Resumo:
Real operation scene This scene was recorded during a real Irradiation operation, more specifically during its final tasks (removing the irradiated sample). This scene was an extra recording to the script and planned ones. - Scene: Involved a number of persons, as: two operators, two personnel belonging to the radiological protection service, and the "client" who asked for the irradiation. Video file labels: "20140402150658_IPCAM": recorded by the left camera.
Resumo:
A major determinant of the level of effective natural gas supply is the ease to feed customers, minimizing system total costs. The aim of this work is the study of the right number of Gas Supply Units – GSUs - and their optimal location in a gas network. This paper suggests a GSU location heuristic, based on Lagrangean relaxation techniques. The heuristic is tested on the Iberian natural gas network, a system modelized with 65 demand nodes, linked by physical and virtual pipelines. Lagrangean heuristic results along with the allocation of loads to gas sources are presented, using a 2015 forecast gas demand scenario.
Resumo:
The large increase of renewable energy sources and Distributed Generation (DG) of electricity gives place to the Virtual Power Producer (VPP) concept. VPPs may turn electricity generation by renewable sources valuable in electricity markets. Information availability and adequate decision-support tools are crucial for achieving VPPs’ goals. This involves information concerning associated producers and market operation. This paper presents ViProd, a simulation tool that allows simulating VPPs operation, focusing mainly in the information requirements for adequate decision making.
Resumo:
To comply with natural gas demand growth patterns and Europe´s import dependency, the gas industry needs to organize an efficient upstream infrastructure. The best location of Gas Supply Units – GSUs and the alternative transportation mode – by phisical or virtual pipelines, are the key of a successful industry. In this work we study the optimal location of GSUs, as well as determining the most efficient allocation from gas loads to sources, selecting the best transportation mode, observing specific technical restrictions and minimizing system total costs. For the location of GSUs on system we use the P-median problem, for assigning gas demands nodes to source facilities we use the classical transportation problem. The developed model is an optimisation-based approach, based on a Lagrangean heuristic, using Lagrangean relaxation for P-median problems – Simple Lagrangean Heuristic. The solution of this heuristic can be improved by adding a local search procedure - the Lagrangean Reallocation Heuristic. These two heuristics, Simple Lagrangean and Lagrangean Reallocation, were tested on a realistic network - the primary Iberian natural gas network, organized with 65 nodes, connected by physical and virtual pipelines. Computational results are presented for both approaches, showing the location gas sources and allocation loads arrangement, system total costs and gas transportation mode.
Resumo:
The management of energy resources for islanded operation is of crucial importance for the successful use of renewable energy sources. A Virtual Power Producer (VPP) can optimally operate the resources taking into account the maintenance, operation and load control considering all the involved cost. This paper presents the methodology approach to formulate and solve the problem of determining the optimal resource allocation applied to a real case study in Budapest Tech’s. The problem is formulated as a mixed-integer linear programming model (MILP) and solved by a deterministic optimization technique CPLEX-based implemented in General Algebraic Modeling Systems (GAMS). The problem has also been solved by Evolutionary Particle Swarm Optimization (EPSO). The obtained results are presented and compared.
Resumo:
Future distribution systems will have to deal with an intensive penetration of distributed energy resources ensuring reliable and secure operation according to the smart grid paradigm. SCADA (Supervisory Control and Data Acquisition) is an essential infrastructure for this evolution. This paper proposes a new conceptual design of an intelligent SCADA with a decentralized, flexible, and intelligent approach, adaptive to the context (context awareness). This SCADA model is used to support the energy resource management undertaken by a distribution network operator (DNO). Resource management considers all the involved costs, power flows, and electricity prices, allowing the use of network reconfiguration and load curtailment. Locational Marginal Prices (LMP) are evaluated and used in specific situations to apply Demand Response (DR) programs on a global or a local basis. The paper includes a case study using a 114 bus distribution network and load demand based on real data.
Resumo:
Database query languages on relations (for example SQL) make it possible to join two relations. This operation is very common in desktop/server database systems but unfortunately query processing systems in networked embedded computer systems currently do not support this operation; specifically, the query processing systems TAG, TinyDB, Cougar do not support this. We show how a prioritized medium access control (MAC) protocol can be used to efficiently execute the database operation join for networked embedded computer systems where all computer nodes are in a single broadcast domain.
Resumo:
The integration of growing amounts of distributed generation in power systems, namely at distribution networks level, has been fostered by energy policies in several countries around the world, including in Europe. This intensive integration of distributed, non-dispatchable, and natural sources based generation (including wind power) has caused several changes in the operation and planning of power systems and of electricity markets. Sometimes the available non-dispatchable generation is higher than the demand. This generation must be used; otherwise it is wasted if not stored or used to supply additional demand. New policies and market rules, as well as new players, are needed in order to competitively integrate all the resources. The methodology proposed in this paper aims at the maximization of the social welfare in a distribution network operated by a virtual power player that aggregates and manages the available energy resources. When facing a situation of excessive non-dispatchable generation, including wind power, real time pricing is applied in order to induce the increase of consumption so that wind curtailment is minimized. This method is especially useful when actual and day-ahead resources forecast differ significantly. The distribution network characteristics and concerns are addressed by including the network constraints in the optimization model. The proposed methodology has been implemented in GAMS optimization tool and its application is illustrated in this paper using a real 937-bus distribution network with 20.310 consumers and 548 distributed generators, some of them non-dispatchable and with must take contracts. The implemented scenario corresponds to a real day in Portuguese power system.
Resumo:
This paper presents the characterization of high voltage (HV) electric power consumers based on a data clustering approach. The typical load profiles (TLP) are obtained selecting the best partition of a power consumption database among a pool of data partitions produced by several clustering algorithms. The choice of the best partition is supported using several cluster validity indices. The proposed data-mining (DM) based methodology, that includes all steps presented in the process of knowledge discovery in databases (KDD), presents an automatic data treatment application in order to preprocess the initial database in an automatic way, allowing time saving and better accuracy during this phase. These methods are intended to be used in a smart grid environment to extract useful knowledge about customers’ consumption behavior. To validate our approach, a case study with a real database of 185 HV consumers was used.
Resumo:
GOAL: To evaluate the impact of the Ross operation, recently (1997) introduced in our unit, for the treatment of patients with congenital aortic valve stenosis. METHODS: The period from January 1997 to December 2000 was compared with the previous 5 years (1992-96). Thirty-seven children (< 16 yrs) and 49 young adults (16-50 yrs) with congenital aortic valve stenosis underwent one of these treatments: percutaneous balloon dilatation (PBD), aortic valve commissurotomy, aortic valve replacement and the Ross operation. The Ross operation was performed in 16 patients, mean age 24.5 yrs (range 9-46 yrs) with a bicuspid stenotic aortic valve, 7/10 adults with calcifications, 2/10 adults with previous aortic valve commissurotomy, 4/6 children with aortic regurgitation following PBD, and 1/6 children who had had a previous aortic valve replacement with a prosthetic valve and aortic root enlargement. RESULTS: PBD was followed by death in two neonates (fibroelastosis); all other children survived PBD. Although there were no deaths, PBD in adults was recently abandoned, owing to unfavourable results. Aortic valve commissurotomy showed good results in children (no deaths). Aortic valve replacement, although associated with good results (no deaths), has been recently abandoned in children in favour of the Ross operation. Over a mean follow-up of 16 months (2-40 months) all patients are asymptomatic following Ross operation, with no echocardiographic evidence of aortic valve regurgitation in 10/16 patients and with trivial regurgitation in 6/16 patients. CONCLUSIONS: The approach now for children and young adults with congenital aortic valve stenosis should be as follows: (1) PBD is the first choice in neonates and infants; (2) Aortic valve commissurotomy is the first choice for children, neonates and infants after failed PBD; (3) The Ross operation is increasingly used in children after failed PBD and in young adults, even with a calcified aortic valve.
Resumo:
A now 36-year-old woman developed a suprahepatic inferior vena cava stenosis, 9 years after liver transplantation for extensive liver echinococcosis. The lesion was treated by percutaneous angioplasty and stenting. Five years later, recurrence of echinococosis with intrastent stenosis together with clinical symptoms, prompted surgical treatment. Hepato-atrial anastomosis was performed under cardiopulmonary bypass with good result.
Resumo:
A single coronary artery can complicate the surgical technique of arterial switch operations, impairing early and late outcomes. We propose a new surgical approach, successfully applied in a 2.1 kg neonate, aimed at reducing the risk of early and late compression and/or distortion of the newly constructed coronary artery system.
Resumo:
A map titled "Plan of Operation against Cantigny" and dated 17 December 1918.