914 resultados para Lodging houses
Resumo:
[Excerpt] Today’s hospitality and tourism companies face complex, dramatically shifting challenges, most notably the need to compete for increasingly sophisticated customers in a global, fluid marketplace. To attract and retain the loyal cadre of customers that will ensure the organization’s success, service companies such as hospitality organizations must employ technologically advanced, yet margin sensitive, product and pricing strategies and practices that will differentiate themselves to their intended market. Even more importantly, these service organizations need to devise strategies that will capture and retain the most important yet, from a financial perspective, unrecognized asset on the balance sheet: the employees that design and deliver the service to the customer base. Human resource strategists (i.e. Becker & Gerhart, 1996; Cappelli & Crocker-Hefter, 1996; O’Reilly & Pfeffer, 2000; Pfeffer, 1998; Ulrich, 1997), including those who take a hospitality perspective (i.e. Baumann, 2000; Hume, 2000; Worcester, 1999) advocate a renewed attention to the investment in employees or “human capital” as a source of strategic competitive advantage.
Resumo:
Purpose – The objective of this exploratory study is to investigate the “flow-through” or relationship between top-line measures of hotel operating performance (occupancy, average daily rate and revenue per available room) and bottom-line measures of profitability (gross operating profit and net operating income), before and during the recent great recession. Design/methodology/approach – This study uses data provided by PKF Hospitality Research for the period from 2007-2009. A total of 714 hotels were analyzed and various top-line and bottom-line profitability changes were computed using both absolute levels and percentages. Multiple regression analysis was used to examine the relationship between top and bottom line measures, and to derive flow-through ratios. Findings – The results show that average daily rate (ADR) and occupancy are significantly and positively related to gross operating profit per available room (GOPPAR) and net operating income per available room (NOIPAR). The evidence indicates that ADR, rather than occupancy, appears to be the stronger predictor and better measure of RevPAR growth and bottom-line profitability. The correlations and explained variances are also higher than those reported in prior research. Flow-through ratios range between 1.83 and 1.91 for NOIPAR, and between 1.55 and 1.65 for GOPPAR, across all chain-scales. Research limitations/implications – Limitations of this study include the limited number of years in the study period, limited number of hotels in a competitive set, and self-selection of hotels by the researchers. Practical implications – While ADR and occupancy work in combination to drive profitability, the authors' study shows that ADR is the stronger predictor of profitability. Hotel managers can use flow-through ratios to make financial forecasts, or use them as inputs in valuation models, to forecast future profitability. Originality/value – This paper extends prior research on the relationship between top-line measures and bottom-line profitability and serves to inform lodging owners, operators and asset managers about flow-through ratios, and how these ratios impact hotel profitability.
Resumo:
Shows cadastral and topographic data (land tracts with proprietors' names) in unurbanized areas.
Resumo:
Partial cadastral map showing zoning boundary.
Resumo:
Adaptability and invisibility are hallmarks of modern terrorism, and keeping pace with its dynamic nature presents a serious challenge for societies throughout the world. Innovations in computer science have incorporated applied mathematics to develop a wide array of predictive models to support the variety of approaches to counterterrorism. Predictive models are usually designed to forecast the location of attacks. Although this may protect individual structures or locations, it does not reduce the threat—it merely changes the target. While predictive models dedicated to events or social relationships receive much attention where the mathematical and social science communities intersect, models dedicated to terrorist locations such as safe-houses (rather than their targets or training sites) are rare and possibly nonexistent. At the time of this research, there were no publically available models designed to predict locations where violent extremists are likely to reside. This research uses France as a case study to present a complex systems model that incorporates multiple quantitative, qualitative and geospatial variables that differ in terms of scale, weight, and type. Though many of these variables are recognized by specialists in security studies, there remains controversy with respect to their relative importance, degree of interaction, and interdependence. Additionally, some of the variables proposed in this research are not generally recognized as drivers, yet they warrant examination based on their potential role within a complex system. This research tested multiple regression models and determined that geographically-weighted regression analysis produced the most accurate result to accommodate non-stationary coefficient behavior, demonstrating that geographic variables are critical to understanding and predicting the phenomenon of terrorism. This dissertation presents a flexible prototypical model that can be refined and applied to other regions to inform stakeholders such as policy-makers and law enforcement in their efforts to improve national security and enhance quality-of-life.
Resumo:
The relationship between indoor and outdoor concentration levels of particles in the absence and in the presence of indoor sources has been attracting an increasing level of attention. Understanding of the relationship and the mechanisms driving it, as well as the ability to quantify it, are of importance for assessment of source contribution, assessment of human exposure and for control and management of particles. It became particularly important to address this topic when evidence came from epidemiological studies on the close association between outdoor concentration levels of particles and health effects, yet with many studies showing that indoor concentrations could be significantly higher than those outdoors. This paper presents a summary of an extensive literature review on this topic conducted with an aim to identify general trends in relation to the I/O relationship emerging from studies conducted worldwide. The review considered separately a larger body of papers published on PM10, PM2.5, as well as the smaller database on particle number and number or volume size distribution. A specific focus of this paper is on naturally ventilated houses. The conclusion from the review is that despite the multiplicity of factors that play role in affecting the relationship, there are clear trends emerging in relation to the I/O relationship for particle mass concentration, enabling more general predictions to be made about the relationship. However, more research is still needed on particle number concentration and size distribution.
Resumo:
Executive Summary The objective of this report was to use the Sydney Opera House as a case study of the application of Building Information Modelling (BIM). The Sydney opera House is a complex, large building with very irregular building configuration, that makes it a challenging test. A number of key concerns are evident at SOH: • the building structure is complex, and building service systems - already the major cost of ongoing maintenance - are undergoing technology change, with new computer based services becoming increasingly important. • the current “documentation” of the facility is comprised of several independent systems, some overlapping and is inadequate to service current and future services required • the building has reached a milestone age in terms of the condition and maintainability of key public areas and service systems, functionality of spaces and longer term strategic management. • many business functions such as space or event management require up-to-date information of the facility that are currently inadequately delivered, expensive and time consuming to update and deliver to customers. • major building upgrades are being planned that will put considerable strain on existing Facilities Portfolio services, and their capacity to manage them effectively While some of these concerns are unique to the House, many will be common to larger commercial and institutional portfolios. The work described here supported a complementary task which sought to identify if a building information model – an integrated building database – could be created, that would support asset & facility management functions (see Sydney Opera House – FM Exemplar Project, Report Number: 2005-001-C-4 Building Information Modelling for FM at Sydney Opera House), a business strategy that has been well demonstrated. The development of the BIMSS - Open Specification for BIM has been surprisingly straightforward. The lack of technical difficulties in converting the House’s existing conventions and standards to the new model based environment can be related to three key factors: • SOH Facilities Portfolio – the internal group responsible for asset and facility management - have already well established building and documentation policies in place. The setting and adherence to well thought out operational standards has been based on the need to create an environment that is understood by all users and that addresses the major business needs of the House. • The second factor is the nature of the IFC Model Specification used to define the BIM protocol. The IFC standard is based on building practice and nomenclature, widely used in the construction industries across the globe. For example the nomenclature of building parts – eg ifcWall, corresponds to our normal terminology, but extends the traditional drawing environment currently used for design and documentation. This demonstrates that the international IFC model accurately represents local practice for building data representation and management. • a BIM environment sets up opportunities for innovative processes that can exploit the rich data in the model and improve services and functions for the House: for example several high-level processes have been identified that could benefit from standardized Building Information Models such as maintenance processes using engineering data, business processes using scheduling, venue access, security data and benchmarking processes using building performance data. The new technology matches business needs for current and new services. The adoption of IFC compliant applications opens the way forward for shared building model collaboration and new processes, a significant new focus of the BIM standards. In summary, SOH current building standards have been successfully drafted for a BIM environment and are confidently expected to be fully developed when BIM is adopted operationally by SOH. These BIM standards and their application to the Opera House are intended as a template for other organisations to adopt for the own procurement and facility management activities. Appendices provide an overview of the IFC Integrated Object Model and an understanding IFC Model Data.
Resumo:
“SOH see significant benefit in digitising its drawings and operation and maintenance manuals. Since SOH do not currently have digital models of the Opera House structure or other components, there is an opportunity for this national case study to promote the application of Digital Facility Modelling using standardized Building Information Models (BIM)”. The digital modelling element of this project examined the potential of building information models for Facility Management focusing on the following areas: • The re-usability of building information for FM purposes • BIM as an Integrated information model for facility management • Extendibility of the BIM to cope with business specific requirements • Commercial facility management software using standardised building information models • The ability to add (organisation specific) intelligence to the model • A roadmap for SOH to adopt BIM for FM The project has established that BIM – building information modelling - is an appropriate and potentially beneficial technology for the storage of integrated building, maintenance and management data for SOH. Based on the attributes of a BIM, several advantages can be envisioned: consistency in the data, intelligence in the model, multiple representations, source of information for intelligent programs and intelligent queries. The IFC – open building exchange standard – specification provides comprehensive support for asset and facility management functions, and offers new management, collaboration and procurement relationships based on sharing of intelligent building data. The major advantages of using an open standard are: information can be read and manipulated by any compliant software, reduced user “lock in” to proprietary solutions, third party software can be the “best of breed” to suit the process and scope at hand, standardised BIM solutions consider the wider implications of information exchange outside the scope of any particular vendor, information can be archived as ASCII files for archival purposes, and data quality can be enhanced as the now single source of users’ information has improved accuracy, correctness, currency, completeness and relevance. SOH current building standards have been successfully drafted for a BIM environment and are confidently expected to be fully developed when BIM is adopted operationally by SOH. There have been remarkably few technical difficulties in converting the House’s existing conventions and standards to the new model based environment. This demonstrates that the IFC model represents world practice for building data representation and management (see Sydney Opera House – FM Exemplar Project Report Number 2005-001-C-3, Open Specification for BIM: Sydney Opera House Case Study). Availability of FM applications based on BIM is in its infancy but focussed systems are already in operation internationally and show excellent prospects for implementation systems at SOH. In addition to the generic benefits of standardised BIM described above, the following FM specific advantages can be expected from this new integrated facilities management environment: faster and more effective processes, controlled whole life costs and environmental data, better customer service, common operational picture for current and strategic planning, visual decision-making and a total ownership cost model. Tests with partial BIM data – provided by several of SOH’s current consultants – show that the creation of a SOH complete model is realistic, but subject to resolution of compliance and detailed functional support by participating software applications. The showcase has demonstrated successfully that IFC based exchange is possible with several common BIM based applications through the creation of a new partial model of the building. Data exchanged has been geometrically accurate (the SOH building structure represents some of the most complex building elements) and supports rich information describing the types of objects, with their properties and relationships.
Resumo:
The challenges of maintaining a building such as the Sydney Opera House are immense and are dependent upon a vast array of information. The value of information can be enhanced by its currency, accessibility and the ability to correlate data sets (integration of information sources). A building information model correlated to various information sources related to the facility is used as definition for a digital facility model. Such a digital facility model would give transparent and an integrated access to an array of datasets and obviously would support Facility Management processes. In order to construct such a digital facility model, two state-of-the-art Information and Communication technologies are considered: an internationally standardized building information model called the Industry Foundation Classes (IFC) and a variety of advanced communication and integration technologies often referred to as the Semantic Web such as the Resource Description Framework (RDF) and the Web Ontology Language (OWL). This paper reports on some technical aspects for developing a digital facility model focusing on Sydney Opera House. The proposed digital facility model enables IFC data to participate in an ontology driven, service-oriented software environment. A proof-of-concept prototype has been developed demonstrating the usability of IFC information to collaborate with Sydney Opera House’s specific data sources using semantic web ontologies.
Resumo:
As a functioning performing arts centre, commercial enterprise, tourist attraction and major national asset, Sydney Opera House must continue to demonstrate the optimal use and effectiveness of its facilities management (FM) to provide value for its stakeholders. To better achieve this, the Cooperative Research Centre for Construction Innovation focussed on the following three themes for investigation in the FM Exemplar Project — Sydney Opera House: digital modelling — developing a building information model capable of integrating information from disparate software systems and hard copy, and combining this with a spatial 3D computeraided design (CAD)/geographic information system (GIS) platform. This model offers a visual representation of the building and its component elements in 3D, and provides comprehensive information on each element. The model can work collaboratively through an open data exchange standard (common to all compliant software) in order to mine the data required to further FM objectives (such as maintenance) more efficiently and effectively. services procurement — developing a multi-criteria performance-based procurement framework aligned with organisational objectives for FM service delivery performance benchmarking — developing an FM benchmarking framework that enables facilities/ organisations to develop key performance indicators (KPIs) to identify better practice and improvement strategies. These three research stream outcomes were then aligned within the broader context of Sydney Opera House’s Total Asset Management (TAM) Plan and Strategic Asset Maintenance (SAM) Plan in arriving at a business framework aligned with, and in support of, organisational objectives. The Sydney Opera House is managed by the Sydney Opera House Trust on behalf of the Government of the State of New South Wales. Within the framework of the TAM Plan prepared in accordance with NSW Treasury Guidelines, the assimilation of these three themes provides an integrated FM solution capable of supporting Sydney Opera House’s business objectives and functional requirements. FM as a business enabler showcases innovative methods in improving FM performance, a better alignment of service and performance objectives and provides a better-practice model to support the business enterprise.
Resumo:
"This book investigates the origins and implications of the securitization crisis, described by the chief executive of ANZ as a "financial services bloodbath". Based on extensive interviews it offers an integrated series of case studies drawn from the United States, the United Kingdom and Australia. A central purpose is to not only chart what went wrong with the investment houses and why the regulatory systems failed, but also provide policy guidance. The book therefore combines the empirical with the normative. In so doing, it provides a route map to navigate one of the most significant financial and regulatory failures in modern times."
Resumo:
Residential property in New Zealand comprises both freestanding residential properties and medium to high density residential properties. Medium to high density residential property comprises the typical units, townhouses and semi-detached houses common in most residential property markets. However, in many of the larger cities of New Zealand the free standing residential property market has evolved into two separate markets being freehold residential property and cross lease residential property. Cross leases have developed as a form of infill housing to reduce the urban sprawl in major canters, while reducing the time and cost for residential property developers. A cross lease is created when an existing freestanding residential property subdivides a portion of the existing land for the erection of another house on the original title, basically dividing one larger residential section into two smaller residential blocks. This paper will analyse house prices in Christchurch over the period 1992 to 2006 to determine if the various housing markets have shown similar capital returns or if there is a specific preference for a particular residential property title.