924 resultados para Keywords: highway maintenance
Resumo:
As our nation’s highway system continues to age, asphalt maintenance and rehabilitation techniques have become increasingly important. The deterioration of pavement over time is inevitable. Preventive maintenance is a strategy to extend the serviceable life of a pavement by applying cost-effective treatments that slow the deterioration of pavement and extend its usable life. Thin maintenance surfaces (TMSs) are preventive maintenance techniques that can effectively prolong the life of pavement when applied at an opportune time. Common TMSs include bituminous fog seal, bituminous seal coat, slurry seal, cold in-place recycling (CIR), and micro-surfacing. This research project investigated ways to improve Iowa Statewide Urban Design and Specifications (SUDAS) and Iowa Department of Transportation (DOT) documents regarding asphalt roadway maintenance and rehabilitation. Researchers led an effort to review and help ensure that the documents supporting proper selection, design, and construction for asphalt maintenance and rehabilitation techniques reflect the latest research findings on these processes: seal coating, slurry sealing, micro-surfacing, and fog sealing. Full results of this investigation are included in this report and its appendices. This report also presents a summary of the recommendations based on the study results.
Resumo:
The Quadrennial Needs Study was developed to assist in the identification of highway needs and the distribution of road funds in Iowa among the various highway entities. During the period 1978 to 1990, the process has seen large shifts in needs and associated funding distribution in individual counties with no apparent reasons. This study investigated the reasons for such shifts. The study identified program inputs that can result in major shifts in needs either up or down from minor changes in the input values. The areas of concern were identified as the condition ratings for roads and structures, traffic volume and mix counts, and the assignment of construction cost areas. Eight counties exhibiting the large shifts (greater than 30%) in needs over time were used to test the sensitivity of the variables. A ninth county was used as the base line for the study. Recommendations are identified for improvements in the process of data collection in the areas of road and structure condition--rating, traffic, and in the assignment of construction cost areas. Advice is also offered in how to account for changes in jurisdiction between successive studies. Maintenance cost area assignment and levels of maintenance service are identified as requiring additional detailed research.
Resumo:
Recent reports have indicated that 23.5 percent of the nation's highway bridges are structurally deficient and 17.7 percent are functionally obsolete. A significant number of these bridges are on the Iowa county road system. The objective of the investigation described in this report was to identify, review and evaluate replacement bridges currently being used by various counties in Iowa and surrounding states. Iowa county engineers, county engineers in neighboring states as well as private manufacturers of bridge components, and regional precad prestressed concrete manufacturers were contacted to determine the most common replacement bridge types being used. Depending upon the findings of the review, possible improvements and/or new replacement bridge systems were to be proposed. A questionnaire was developed and sent to county engineers in Iowa and several counties in surrounding states. The results of the questionnaire showed that the most common replacement bridges in Iowa are the continuous concrete slab and prestressed concrete bridges. The primary reason these types are used is because of the availability of standard designs and because of their ease of maintenance. Counties seldom construct these types of bridges using their own labor forces, but instead contract the work. However, county forces are used to construct steel stringer, precast reinforced concrete and timber bridges. In general, 69 percent of the counties indicate an ability and willingness to use their own forces to design and construct relatively short span bridges (i.e., 40 A or less) provided the construction procedures are relatively simple. Several unique replacement bridge types used in Iowa that are constructed by county forces are documented and presented in this report. Sufficient details are provided to allow county engineers to determine if some of these bridges could be used to resolve some of their own replacement bridge problems. Where possible, cost information has also been provided. Each of these bridge types were evaluated for various criteria (e.g., cost effectiveness, conformance to AASI-ITO standards, range of sizes, etc.) by a panel of four Iowa county engineers; a summary of this critique is included. After evaluating the questionnaire responses from the counties and evaluating the various bridge replacement concepts currently in use, one new bridge replacement concept and one modification of a current Iowa county bridge replacement concept were developed. Both of these concepts would utilize county labor forces.
Resumo:
1. Iowa Code Section 309.22 requires the County Engineer to submit an Annual Report to the Iowa DOT by September 15 of each year. 2. Iowa DOT Administrative Rule 761, Chapter 173.3 requires the Iowa DOT to distribute a detailed set of instructions to the counties for the preparation of the report. The instructions constitute the standard requirements and forms to be followed. 3. Iowa DOT Administrative Rule 761,Chapter 178 establishes requirements for the reporting by cities and counties of project cost information to the Iowa DOT 4. Iowa DOT policy states that the report shall cover the fiscal year from July 1st of the past calendar year to June 30th of the current calendar year.
Resumo:
The State of Iowa [STATE] and the Iowa Department of Transportation [IDOT] hereby is claim any warranty of any kind, express or implied, in reference to the information contained herein. The STATE and the IDOT neither assume nor authorize any person to assume for the STATE or the IDOT any liability in connection with the information contained herein, and there are no oral agreements or warranties regarding the information contained herein. Each and every person is hereby notified that the vertical clearances specified herein are subject to change due to resurfacing, surface buckling, weather conditions, or any other event. It is the responsibility of each and every vehicle operator to ascertain whether sufficient ACTUAL vertical clearance exists to move his vehicle or motor vehicle between the roadway and the underpasses and bridges listed herein. The May 15 date on this map reflects the end of the update schedule for the previous calendar year. Any vertical clearance restrictions which could or may change AFTER this date will not be reflected on this map. For the latest information on vertical clearance restrictions call the Office of Motor Carrier Services in Ankeny, (515) 237-3264 or visit http://www.iowadot.gov/mvd/omcs.
Resumo:
Highway safety and pavement performance can be directly influenced by the type of shoulders that are constructed. Shoulder design alternatives have always been rather limited. Moreover, the use of some of the alternatives has always been restricted by funding limitations. This research project seeks to explore the use of modified macadam base construction for shoulders. This type of shoulder design could offer the designer another option when paved or stabilized shoulders are being considered. Macadam base construction has in the past been shown to be quite strong and free draining. Two macadam base shoulder designs were developed and constructed for this research project. A new roadway embankment and P.C.C. pavement were constructed on a section of US 6 east of Adel in Dallas County. The macadam base shoulders were constructed adjacent to the pavement as part of the project. The north shoulder was finished with a choke stone course and bituminous surface treatment and the south shoulder was finished with a two (2) inch layer of Type B Class I1 asphalt concrete. Macadam stone base shoulders can be built with relatively minor construction problems with comparable strength and less cost than asphalt treated base shoulders. The macadam stone base shoulders have performed well with very little maintenance necessary. The improved drainage substantially reduces deterioration of the pavement joints.
Resumo:
The film depicts period traffic congestion, sharp and winding sections of road, steep hills making trucks slow to a crawl, and dangerous vehicle and pedestrian crossings, all important reasons why highway design and safety improvements, and highway relocation were needed. In fact, when the film was produced, U.S. 30 or the Lincoln Highway was the busiest primary road in Iowa; and the section between State Center and Boone was deemed “critical,” meaning it was considered dangerous by the ISHC’s Efficiency Standards.
Resumo:
Crohn's disease (CD), a major form of human inflammatory bowel disease, is characterized by primary immunodeficiencies. The nuclear receptor peroxisome proliferator-activated receptor gamma (PPARgamma) is essential for intestinal homeostasis in response to both dietary- and microbiota-derived signals. Its role in host defense remains unknown, however. We show that PPARgamma functions as an antimicrobial factor by maintaining constitutive epithelial expression of a subset of beta-defensin in the colon, which includes mDefB10 in mice and DEFB1 in humans. Colonic mucosa of Ppargamma mutant animals shows defective killing of several major components of the intestinal microbiota, including Candida albicans, Bacteroides fragilis, Enterococcus faecalis, and Escherichia coli. Neutralization of the colicidal activity using an anti-mDefB10 blocking antibody was effective in a PPARgamma-dependent manner. A functional promoter variant that is required for DEFB1 expression confers strong protection against Crohn's colitis and ileocolitis (odds ratio, 0.559; P = 0.018). Consistently, colonic involvement in CD is specifically linked to reduced expression of DEFB1 independent of inflammation. These findings support the development of PPARgamma-targeting therapeutic and/or nutritional approaches to prevent colonic inflammation by restoring antimicrobial immunity in CD.
Resumo:
BACKGROUND: High-dose chemotherapy with autologous stem-cell transplantation is a standard treatment for young patients with multiple myeloma. Residual disease is almost always present after transplantation and is responsible for relapse. This phase 3, placebo-controlled trial investigated the efficacy of lenalidomide maintenance therapy after transplantation. METHODS: We randomly assigned 614 patients younger than 65 years of age who had nonprogressive disease after first-line transplantation to maintenance treatment with either lenalidomide (10 mg per day for the first 3 months, increased to 15 mg if tolerated) or placebo until relapse. The primary end point was progression-free survival. RESULTS: Lenalidomide maintenance therapy improved median progression-free survival (41 months, vs. 23 months with placebo; hazard ratio, 0.50; P<0.001). This benefit was observed across all patient subgroups, including those based on the β(2)-microglobulin level, cytogenetic profile, and response after transplantation. With a median follow-up period of 45 months, more than 70% of patients in both groups were alive at 4 years. The rates of grade 3 or 4 peripheral neuropathy were similar in the two groups. The incidence of second primary cancers was 3.1 per 100 patient-years in the lenalidomide group versus 1.2 per 100 patient-years in the placebo group (P=0.002). Median event-free survival (with events that included second primary cancers) was significantly improved with lenalidomide (40 months, vs. 23 months with placebo; P<0.001). CONCLUSIONS: Lenalidomide maintenance after transplantation significantly prolonged progression-free and event-free survival among patients with multiple myeloma. Four years after randomization, overall survival was similar in the two study groups. (Funded by the Programme Hospitalier de Recherche Clinique and others; ClinicalTrials.gov number, NCT00430365.).
Resumo:
FHWA and the Iowa Department of Transportation are proposing geometric and capacity improvements to the Interstate 29 and Interstate 80 mainline in Segment 3 and the I-80/I-29 East System interchange, the South Expressway interchange, the U.S. Highway 275 interchange, and the Madison Avenue interchange to to safely and efficiently of transportation in the City of Council Bluffs, the Iowa DOT is also proposing to eliminate several railroad alignments and to develop new, consolidated tracks in Segment 3.
Resumo:
Description of the Proposed Action The Iowa Department of Transportation (Iowa DOT) and the Federal Highway Administration (FHWA) propose to improve a 3.9-mile segment of Iowa Highway 86 (IA 86) from Iowa Highway 9 (IA 9) to near the Minnesota border within Dickinson County, Iowa (the Project). The existing IA 86 has narrow travel lanes and shoulders, steep foreslopes, and poor vertical alignment. Environmental Assessment Availability The Environmental Assessment (EA) for the Project was signed on June 30, 2011, and distributed to selected federal, state, and local resource agencies on July 5, 2011, for review and comment. A Notice of Public Hearing and Environmental Assessment Availability was published in the legal section of the Estherville Daily News on July 5, 2011, and the Ocheyedan Press-Melvin News and Dickinson County News on July 6, 2011. Review and Comment Period A review and comment period was established for receipt of comments on the EA, with an expiration date of August 8, 2011. A public hearing for the Project was held at the Dickinson County Courthouse on July 21, 2011. The public hearing used a combined open forum and formal format. A transcript of this meeting has been prepared and is available upon request.
Resumo:
This document provides language that can be used by an Owner-Agency to develop materials and construction specifications with the objective of reducing tire/pavement noise. While the practices described herein are largely prescriptive, they have been demonstrated to increase the likelihood of constructing a durable, quieter concrete surface.
Resumo:
This document provides language that can be used by an Owner-Agency to develop materials and construction specifications with the objective of reducing tire/pavement noise. While the practices described herein are largely prescriptive, they have been demonstrated to increase the likelihood of constructing a durable, quieter concrete surface. Guidance is provided herein for texturing the concrete surface since texture geometry has a paramount effect on tire/pavement noise. Guidance for curing is also provided to improve strength and durability of the surface mortar, and thus to improve texture durability.
Resumo:
This document provides language that can be used by an Owner-Agency to develop materials and construction specifications with the objective of reducing tire/pavement noise. While the practices described herein are largely prescriptive, they have been demonstrated to increase the likelihood of constructing a durable, quieter concrete surface. Guidance is provided herein for texturing the concrete surface since texture geometry has a paramount effect on tire/pavement noise. Guidance for curing is also provided to improve strength and durability of the surface mortar, and thus to improve texture durability.