923 resultados para Implementation process


Relevância:

30.00% 30.00%

Publicador:

Resumo:

A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The processes of mobilization of land for infrastructures of public and private domain are developed according to proper legal frameworks and systematically confronted with the impoverished national situation as regards the cadastral identification and regularization, which leads to big inefficiencies, sometimes with very negative impact to the overall effectiveness. This project report describes Ferbritas Cadastre Information System (FBSIC) project and tools, which in conjunction with other applications, allow managing the entire life-cycle of Land Acquisition and Cadastre, including support to field activities with the integration of information collected in the field, the development of multi-criteria analysis information, monitoring all information in the exploration stage, and the automated generation of outputs. The benefits are evident at the level of operational efficiency, including tools that enable process integration and standardization of procedures, facilitate analysis and quality control and maximize performance in the acquisition, maintenance and management of registration information and expropriation (expropriation projects). Therefore, the implemented system achieves levels of robustness, comprehensiveness, openness, scalability and reliability suitable for a structural platform. The resultant solution, FBSIC, is a fit-for-purpose cadastre information system rooted in the field of railway infrastructures. FBSIC integrating nature of allows: to accomplish present needs and scale to meet future services; to collect, maintain, manage and share all information in one common platform, and transform it into knowledge; to relate with other platforms; to increase accuracy and productivity of business processes related with land property management.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Requirements Engineering has been acknowledged an essential discipline for Software Quality. Poorly-defined processes for eliciting, analyzing, specifying and validating requirements can lead to unclear issues or misunderstandings on business needs and project’s scope. These typically result in customers’ non-satisfaction with either the products’ quality or the increase of the project’s budget and duration. Maturity models allow an organization to measure the quality of its processes and improve them according to an evolutionary path based on levels. The Capability Maturity Model Integration (CMMI) addresses the aforementioned Requirements Engineering issues. CMMI defines a set of best practices for process improvement that are divided into several process areas. Requirements Management and Requirements Development are the process areas concerned with Requirements Engineering maturity. Altran Portugal is a consulting company concerned with the quality of its software. In 2012, the Solution Center department has developed and applied successfully a set of processes aligned with CMMI-DEV v1.3, what granted them a Level 2 maturity certification. For 2015, they defined an organizational goal of addressing CMMI-DEV maturity level 3. This MSc dissertation is part of this organization effort. In particular, it is concerned with the required process areas that address the activities of Requirements Engineering. Our main goal is to contribute for the development of Altran’s internal engineering processes to conform to the guidelines of the Requirements Development process area. Throughout this dissertation, we started with an evaluation method based on CMMI and conducted a compliance assessment of Altran’s current processes. This allowed demonstrating their alignment with the CMMI Requirements Management process area and to highlight the improvements needed to conform to the Requirements Development process area. Based on the study of alternative solutions for the gaps found, we proposed a new Requirements Management and Development process that was later validated using three different approaches. The main contribution of this dissertation is the new process developed for Altran Portugal. However, given that studies on these topics are not abundant in the literature, we also expect to contribute with useful evidences to the existing body of knowledge with a survey on CMMI and requirements engineering trends. Most importantly, we hope that the implementation of the proposed processes’ improvements will minimize the risks of mishandled requirements, increasing Altran’s performance and taking them one step further to the desired maturity level.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The EM3E Master is an Education Programme supported by the European Commission, the European Membrane Society (EMS), the European Membrane House (EMH), and a large international network of industrial companies, research centres and universities (http://www.em3e.eu)

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The present Working Project aims at studying the topic of assurance mapping in a specific organizational context of a Portuguese retail company. For this purpose, an assurance map framework was designed to support the decision making process of stakeholders, through the delivery of comfort concerning risks, operations and control. In the end, the framework was successfully implemented for the process sourcing of goods in two business units of the company. Although, further implementation of the framework proved not to be feasible during the project’s timespan, it is expected to occur in the near future.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This study is specifically concerned with the effect of the Enterprise Resource Planning (ERP) on the Business Process Redesign (BPR). Researcher’s experience and the investigation on previous researches imply that BPR and ERP are deeply related to each other and a study to found the mentioned relation further is necessary. In order to elaborate the hypothesis, a case study, in particular Turkish electricity distribution market and the phase of privatization are investigated. Eight companies that have taken part in privatization process and executed BPR serve as cases in this study. During the research, the cases are evaluated through critical success factors on both BPR and ERP. It was seen that combining the ERP Solution features with business processes lead the companies to be successful in ERP and BPR implementation. When the companies’ success and efficiency were compared before and after the ERP implementation, a considerable change was observed in organizational structure. It was spotted that the team composition is important in the success of ERP projects. Additionally, when the ERP is in driver or enabler role, the companies can be considered successful. On the contrary, when the ERP has a neutral role of business processes, the project fails. In conclusion, it can be said that the companies, which have implemented the ERP successfully, have accomplished the goals of the BPR.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The assessment of existing timber structures is often limited to information obtained from non or semi destructive testing, as mechanical testing is in many cases not possible due to its destructive nature. Therefore, the available data provides only an indirect measurement of the reference mechanical properties of timber elements, often obtained through empirical based correlations. Moreover, the data must result from the combination of different tests, as to provide a reliable source of information for a structural analysis. Even if general guidelines are available for each typology of testing, there is still a need for a global methodology allowing to combine information from different sources and infer upon that information in a decision process. In this scope, the present work presents the implementation of a probabilistic based framework for safety assessment of existing timber elements. This methodology combines information gathered in different scales and follows a probabilistic framework allowing for the structural assessment of existing timber elements with possibility of inference and updating of its mechanical properties, through Bayesian methods. The probabilistic based framework is based in four main steps: (i) scale of information; (ii) measurement data; (iii) probability assignment; and (iv) structural analysis. In this work, the proposed methodology is implemented in a case study. Data was obtained through a multi-scale experimental campaign made to old chestnut timber beams accounting correlations of non and semi-destructive tests with mechanical properties. Finally, different inference scenarios are discussed aiming at the characterization of the safety level of the elements.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper reports on the experience of the implementation of a new mechanism to assess individual student contribution within project work, where students work in teams to solve a large-scale open-ended interdisciplinary project. The study takes place at the University of Minho, with first year engineering students, enrolled in the Industrial Management and Engineering (Integrated Masters) degree. The aim of this paper is to describe the main principles and procedures underlying the assessment mechanism created and also provide some feedback from its first implementation, based on the students, lecturers and tutors perceptions. For data collection, a survey was sent to all course lecturers and tutors involved in the assessment process. Students also contributed with suggestions, both on a workshop held at the end of the project and also by answering a survey on the overall satisfaction with PBL experience. Findings show a positive level of acceptance of the new mechanism by the students and also by the lecturers and tutors. The study identified the need to clarify the criteria used by the lecturers and the exact role of the tutor, as well as the need for further improvement of its features and procedures. Some recommendations are also issued regarding technical aspects related to some of the steps of the procedures, as well as the need for greater support on the adjustment and final setting of the individual grades.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Companies from the motorcycles components branch are dealing with a dynamic environment, resulting from the introduction of new products and the increase of market demand. This dynamic environment requires frequent changes in production lines and requires flexibility in the processes, which can cause reductions in the level of quality and productivity. This paper presents a Lean Six Sigma improvement project performed in a production line of the company's machining sector, in order to eliminate losses that cause low productivity, affecting the fulfillment of the production plan and customer satisfaction. The use of Lean methodology following the DMAIC stages allowed analyzing the factors that influence the line productivity loss. The major problems and causes that contribute to a reduction on productivity and that were identified in this study are the lack of standardization in the setup activities and the excessive stoppages for adjustment of the processes that caused an increase of defects. Control charts, Pareto analysis and cause-and-effect diagrams were used to analyze the problem. On the improvement stage, the changes were based on the reconfiguration of the line layout as well as the modernization of the process. Overall, the project justified an investment in new equipment, the defective product units were reduced by 84% and an increase of 29% of line capacity was noticed.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

All organisations make some contribution to the degradation of the environment through their use of resources and production of waste. Environmental management systems (EMS) standards can provide a tool for companies to systematically reduce their environmental impacts. ISO 14001 was published in 1996. This fitted in with plans of the case study company to take proactive action in this area, even though there was no legislative requirement for them to do so. As EMS implementation was a new area at the time, appropriate methodologies were developed to address different aspects of the implementation, and ISO 14001 was successfully implemented in the company. The results of the primary research included: ♦ Drawing up a methodology for identifying and interpreting the environmental legislation that may have an impact on the organisation and compiling a register of such regulations. ♦ Developing a robust methodology for assessing significant environmental aspects and impacts and applying this to the software company. ♦ Establishing objectives and targets for those aspects identified as significant and implementing environmental management programmes to meet these. ♦ Developing an internal environmental audit procedure based on auditing against the significant aspects. ♦ Integrating areas of the EMS with the existing quality management system in order to avoid duplication of effort. ♦ Undergoing an external assessment process in order to achieve certification of the system. The thesis concludes that the systematic approach defined in ISO 14001 provided a mechanism that the organisation was able to adopt to bring about improvement in its environmental performance. The system was based on a thorough evaluation of the organisation's significant environmental aspects in order to bring about a reduction in its negative impacts. The ISO 14001 requirement for continual improvement is the key driver of the system, and this is what differentiates it from ISO 9000.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

An appropriate assessment of end-to-end network performance presumes highly efficient time tracking and measurement with precise time control of the stopping and resuming of program operation. In this paper, a novel approach to solving the problems of highly efficient and precise time measurements on PC-platforms and on ARM-architectures is proposed. A new unified High Performance Timer and a corresponding software library offer a unified interface to the known time counters and automatically identify the fastest and most reliable time source, available in the user space of a computing system. The research is focused on developing an approach of unified time acquisition from the PC hardware and accordingly substituting the common way of getting the time value through Linux system calls. The presented approach provides a much faster means of obtaining the time values with a nanosecond precision than by using conventional means. Moreover, it is capable of handling the sequential time value, precise sleep functions and process resuming. This ability means the reduction of wasting computer resources during the execution of a sleeping process from 100% (busy-wait) to 1-1.5%, whereas the benefits of very accurate process resuming times on long waits are maintained.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This article describes the problem of commercializing of scientific researches in universities. Management tasks are reduced to subtasks and combined formal algorithm. The overall control problem is reduced to a set of formal subtasks combined into a single algorithm. Here the necessity of joint control of all commercialization projects as well as the use of information systems for the successful implementation of the existing commercialpotential is shown.