This Phase II project follows a previous project titled Strategies to Address Nighttime Crashes at Rural, Unsignalized Intersections. Based on the results of the previous study, the Iowa Highway Research Board (IHRB) indicated interest in pursuing further research to address the quality of lighting, rather than just the presence of light, with respect to safety. The research team supplemented the literature review from the previous study, specifically addressing lighting level in terms of measurement, the relationship between light levels and safety, and lamp durability and efficiency. The Center for Transportation Research and Education (CTRE) teamed with a national research leader in roadway lighting, Virginia Tech Transportation Institute (VTTI) to collect the data. An integral instrument to the data collection efforts was the creation of the Roadway Monitoring System (RMS). The RMS allowed the research team to collect lighting data and approach information for each rural intersection identified in the previous phase. After data cleanup, the final data set contained illuminance data for 101 lighted intersections (of 137 lighted intersections in the first study). Data analysis included a robust statistical analysis based on Bayesian techniques. Average illuminance, average glare, and average uniformity ratio values were used to classify quality of lighting at the intersections.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This phase of the electronic collaboration project involved two major efforts: 1) implementation of AEC Sync (formerly known as Attolist), a web-based project management system (WPMS), on the Broadway Viaduct Bridge Project and the Iowa Falls Arch Bridge Project and 2) development of a web-based project management system for bridge and highway construction projects with less than $10 million in contract value. During the previous phase of this project (fiscal year 2010), the research team helped with the implementation process for AEC Sync and collected feedback from the Broadway Viaduct project team members before the start of the project. During the 2011 fiscal year, the research team collected the post-project surveys from the Broadway Viaduct project members and compared them to the pre-project survey results. The results of the AEC Sync implementation on the Broadway project were positive. The project members were satisfied with the performance of the AEC Sync software and how it facilitated document management and its transparency. In addition, the research team distributed, collected, and analyzed the pre-project surveys for the Iowa Falls Arch Bridge Project. The implementation of AEC Sync for the Iowa Falls Arch Bridge Project appears to also be positive, based on the pre-project surveys. The fourth phase of this electronic collaboration project involves the identification and implementation of a WPMS solution for smaller bridge and highway projects. The workflow for the shop drawing approval process for sign truss projects was documented and used to identify possible WPMS solutions. After testing and evaluating several WPMS solutions, Microsoft SharePoint Foundation’s site pages were selected to be pilot-tested on sign truss projects. Due to the limitation on the SharePoint license that the Iowa Department of Transportation (DOT) has, a file transfer protocol (FTP) site will be developed alongside this site to allow contractors to upload shop drawings to the Iowa DOT. The SharePoint site pages are expected to be ready for implementation during the 2012 calendar year.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Map produced by Iowa Department of Transportation about Iowa Commercial and Industrial Network.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

OBJECTIVE: Intervention during the pre-psychotic period of illness holds the potential of delaying or even preventing the onset of a full-threshold disorder, or at least of reducing the impact of such a disorder if it does develop. The first step in realizing this aim was achieved more than 10 years ago with the development and validation of criteria for the identification of young people at ultra-high risk (UHR) of psychosis. Results of three clinical trials have been published that provide mixed support for the effectiveness of psychological and pharmacological interventions in preventing the onset of psychotic disorder. METHOD: The present paper describes a fourth study that has now been undertaken in which young people who met UHR criteria were randomized to one of three treatment groups: cognitive therapy plus risperidone (CogTher + Risp: n = 43); cognitive therapy plus placebo (CogTher + Placebo: n = 44); and supportive counselling + placebo (Supp + Placebo; n = 28). A fourth group of young people who did not agree to randomization were also followed up (monitoring: n = 78). Baseline characteristics of participants are provided. RESULTS AND CONCLUSION: The present study improves on the previous studies because treatment was provided for 12 months and the independent contributions of psychological and pharmacological treatments in preventing transition to psychosis in the UHR cohort and on levels of psychopathology and functioning can be directly compared. Issues associated with recruitment and randomization are discussed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A method of making a multiple matched filter which allows the recognition of different characters in successive planes in simple conditions is proposed. The generation of the filter is based on recording on the same plate the Fourier transforms of the different patterns to be recognized, each of which is affected by different spherical phase factors because the patterns have been placed at different distances from the lens. This is proved by means of experiments with a triple filter which allows satisfactory recognition of three characters.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Report on a review of selected application controls over the Iowa State University of Science and Technology Facilities Planning and Management - Facilities Administrative Management Information System for the period of April 18, 2011 through May 16, 2011

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Iowa Department of Transportation (Iowa DOT), Nebraska Department of Roads (NDOR), and the Federal Highway Administration (FHWA) are proposing improvements to the interstate system in the Omaha/Council Bluffs metropolitan area, extending across the Missouri River on Interstate 80 (I-80) to east of the Interstate 480 (I-480) interchange in Omaha, Nebraska (see Figure 1-1). The study considers long-term, broad-base transportation improvements along Interstate I-29 (I-29), I-80, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system1, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. These improvements, once implemented, would bring the segments of I-80 and I-29 up to current engineering standards and modernize the roadway to accommodate future traffic needs.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Iowa Department of Transportation (Iowa DOT), Nebraska Department of Roads (NDOR), and the Federal Highway Administration (FHWA) are proposing improvements to the interstate system in the Omaha/Council Bluffs metropolitan area, extending across the Missouri River on Interstate 80 (I-80) to east of the Interstate 480 (I-480) interchange in Omaha, Nebraska (see Figure 1-1). The study considers long-term, broad-base transportation improvements along Interstate I-29 (I-29), I-80, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system1, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. These improvements, once implemented, would bring the segments of I-80 and I-29 up to current engineering standards and modernize the roadway to accommodate future traffic needs.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Tort claims resulting from alleged highway defects have introduced an additional element in the planning, design, construction, and maintenance of highways. A survey of county governments in Iowa was undertaken in order to quantify the magnitude and determine the nature of this problem. This survey included the use of mailed questionnaires and personal interviews with County Engineers. Highway-related claims filed against counties in Iowa amounted to about $52,000,000 during the period 1973 through 1978. Over $30,000,000 in claims was pending at the end of 1978. Settlements of judgments were made at a cost of 12.2% of the amount claimed for those claims that had been disposed of, not including costs for handling claims, attorney fees, or court costs. There was no clear time trend in the amount of claims for the six-year period surveyed, although the anount claimed in 1978 was about double the average for the preceding five years. Problems that resulted in claims for damages from counties have generally related to alleged omissions in the use of traffic control devices or defects, often temporary, resulting from alleged inadequacies in highway maintenance. The absence of stop signs or warning signs often has been the central issue in a highway-related tort claim. Maintenance problems most frequently alleged have included inadequate shoulders, surface roughness, ice o? snow conditions, and loose gravel. The variation in the occurrence of tort claims among 85 counties in Iowa could not be related to any of the explanatory variables that were tested. Claims hppeared to have occurred randomly. However, using data from a subsample of 11 counties, a significant relationship was shown probably to exist between the amount of tort claims and the extensiveness of use of wcirning signs on the respective county road systems. Although there was no indication in any county that their use of warning signs did not conform with provisions of the Manual on Uniform Traffic Control Devices (Federal Highway Administration, Government Printing Office, Washington, D.C., 1978), many more warning signs were used in some counties than would be required to satisfy this minimum requirement. Sign vandalism reportedly is a problem in all counties. The threat of vandalism and the added costs incurred thereby have tended to inhibit more extensive use of traffic control devices. It also should be noted that there is no indication from this research of a correlation between the intensiveness of sign usage and highway safety. All highway maintenance activities introduce some extraordinary hazard for motorists. Generally effective methodologies have evolved for use on county road systems for routine maintenance activities, procedures that tend to reduce the hazard to practical and reasonably acceptable levels. Blading of loose-surfaced roads is an examples such a routine maintenance activity. Alternative patterns for blading that were investigated as part of this research offered no improvements in safety when compared with the method in current use and introduced a significant additional cost that was unacceptable, given the existing limitations in resources available for county roads.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Calcium magnesium acetate (CMA) has been identified by Bjorksten Research Laboratories as an environmentally harmless alternative to sodium or calcium chloride for deicing highways. Their study found CMA to be noncorrosive to steel, aluminum and zinc with little or no anticipated environmental impact. When used, it degrades into elements found in abundance in nature. The deicing capabilities were found to be similar to sodium chloride. The neutralized CMA they produced did cause scaling of PC concrete, but they did not expect mildly alkaline CMA to have this effect. In the initial investigation of CMA at the Iowa DOT laboratory, it was found that CMA produced from hydrated lime and acetic acid was a light, fluffy material. It was recognized that a deicer in this form would be difficult to effectively distribute on highways without considerable wind loss. A process was developed to produce CMA in the presence of sand to increase particle weight. In this report the product of this process, which consists of sand particles coated with CMA, is referred to as "CMA deicer". The mixture of salts, calcium magnesium acetate, is referred to as "CMA". The major problems with CMA for deicing are: (1) it is not commercially available, (2) it is expensive with present production methods and (3) there is very little known about how it performs on highways under actual deicing conditions. In view of the potential benefits this material offers, it is highly desirable to find solutions or answers to these problems. This study provides information to advance that effort.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

An experimental modification of the transverse groove surface texture of a section of an urban interstate highway was performed by the Iowa Department of Transportation. Transverse groove texturing i s a design feature required by the Federal Highway Administration t o reduce skidding under wet pavement conditions. Adjacent residents claimed the texturing was the cause of especially annoying tonal characteristics within the traffic noise. A research proposal to modify the existing texture pattern by surface grinding and to study the noise and friction effects was approved for funding by the Iowa Highway Research Board. Results i n the form of a comparison between traffic noise before modification and traffic noise immediately after and 15 months after modification indicate that the change in surface texture has lowered overall traffic noise levels by reducing a high frequency component of the traffic noise spectrum. Fraffic testing data show reduced capacity of the roadway to inhibit wet pavement skidding as a result of the surface modification.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The major objective of this research project was to investigate the chemistry and morphology of portland cement concrete pavements in Iowa. The integrity of the various pavements was evaluated qualitatively, based on the presence or absence of microcracks, the presence or absence of sulfate minerals, and the presence or absence of alkali-silica gel(s). Major equipment delays and subsequent equipment replacements resulted in significant delays over the course of this research project. However, all these details were resolved and the equipment is currently in place and fully operational. The equipment that was purchased for this project included: ( I ) a LECO VP 50, 12-inch diameter, variable speed grinder/polisher: (2) a Hitachi S-2460N variable pressure scanning electron microscope; and (3) a OXFORD Instruments Link ISIS microanalysis system with a GEM (high-purity germanium) X-ray detector. This study has indicated that many of the concrete pavements contained evidence of multiple deterioration mechanisms: and hence, the identification of a single reason for the distress that was observed in any given pavement typically had to be based on opinion rather than empirical evidence.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

When concrete deterioration begins to occur in highway pavement, repairs become necessary to assure the rider safety, extend its useful life and restore its riding qualities. One rehabilitation technique used to restore the pavement to acceptable highway standards is to apply a thin portland cement concrete (PCC) overlay to the existing pavement. First, any necessary repairs are made to the existing pavement, the surface is then prepared, and the PCC overlay is applied. Brice Petrides-Donohue, Inc. (Donohue) was retained by the Iowa Department of Transportation (IDOT) to evaluate the present condition with respect to debonding of the PCC overlay at fifteen sites on Interstate 80 and State Highway 141 throughout the State of Iowa. This was accomplished by conducting an infrared thermographic and ground penetrating radar survey of these sites which were selected by the Iowa Department of Transportation. The fifteen selected sites were all two lanes wide and one-tenth of a mile long, for a total of three lane miles or 190,080 square feet. The selected sites are as follows: On Interstate 80 Eastbound, from milepost 35.25 to 35.35, milepost 36.00 to 36.10, milepost 37.00 to 37.10, milepost 38.00 to 38.10 and milepost 39.00 to 39.10, on State Highway 141 from milepost 134.00 to 134.10, milepost 134.90 to milepost 135.00, milepost 135.90 to 136.00, milepost 137.00 to 137.10 and milepost 138.00 to 138.10, and on Interstate 80 Westbound from milepost 184.00 to 184.10, milepost 185.00 to 185.10, milepost 186.00 to 186.10, milepost 187.00 to 187.10, and from milepost 188.00 to 188.10.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The quadrennial need study was developed to assist in identifying county highway financial needs (construction, rehabilitation, maintenance, and administration) and in the distribution of the road use tax fund (RUTF) among the counties in the state. During the period since the need study was first conducted using HWYNEEDS software, between 1982 and 1998, there have been large fluctuations in the level of funds distributed to individual counties. A recent study performed by Jim Cable (HR-363, 1993), found that one of the major factors affecting the volatility in the level of fluctuations is the quality of the pavement condition data collected and the accuracy of these data. In 1998, the Center for Transportation Research and Education researchers (Maze and Smadi) completed a project to study the feasibility of using automated pavement condition data collected for the Iowa Pavement Management Program (IPMP) for the paved county roads to be used in the HWYNEEDS software (TR-418). The automated condition data are objective and also more current since they are collected in a two year cycle compared to the 10-year cycle used by HWYNEEDS right now. The study proved the use of the automated condition data in HWYNEEDS would be feasible and beneficial in educing fluctuations when applied to a pilot study area. In another recommendation from TR-418, the researchers recommended a full analysis and investigation of HWYNEEDS methodology and parameters (for more information on the project, please review the TR-418 project report). The study reported in this document builds on the previous study on using the automated condition data in HWYNEEDS and covers the analysis and investigation of the HWYNEEDS computer program methodology and parameters. The underlying hypothesis for this study is thatalong with the IPMP automated condition data, some changes need to be made to HWYNEEDS parameters to accommodate the use of the new data, which will stabilize the process of allocating resources and reduce fluctuations from one quadrennial need study to another. Another objective of this research is to investigate the gravel roads needs and study the feasibility of developing a more objective approach to determining needs on the counties gravel road network. This study identifies new procedures by which the HWYNEEDS computer program is used to conduct the quadrennial needs study on paved roads. Also, a new procedure will be developed to determine gravel roads needs outside of the HWYNEED program. Recommendations are identified for the new procedures and also in terms of making changes to the current quadrennial need study. Future research areas are also identified.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Structural repairs of bridges piers and abutments require patching concrete or mortar be placed at various thickness. Whether concrete or mortar is use depends upon the depth of the patch to be made. In some instances, the use of a liquid bonding agent has been specified in the mixes as well as in a grout scrubbed onto the surface to be patched prior to the mix placement. Most of the bonding agents presently approved by the Iowa D.O.T. are polyvinyl acetate (PVA) or some type of latex. In a general discussion with a consultant about various types of bridge repair materials and processes, the subject of bonding agents was discussed at some length. It was the opinion of the consultant that the usage of polyvinyl acetates should be discontinued because of possible deterioration of this material with time. Some of these materials apparently re-emulsify in a high - moisture environment causing serious patch deterioration. As a result of this information, a study was initiated to determine the durability of these materials.