857 resultados para Continuous improvements
Resumo:
Of the approximately 25,000 bridges in Iowa, 28% are classified as structurally deficient, functionally obsolete, or both. The state of Iowa thus follows the national trend of an aging infrastructure in dire need of repair or replacement with a relatively limited funding base. Therefore, there is a need to develop new materials with properties that may lead to longer life spans and reduced life-cycle costs. In addition, new methods for determining the condition of structures are needed to monitor the structures effectively and identify when the useful life of the structure has expired or other maintenance is needed. High-performance steel (HPS) has emerged as a material with enhanced weldability, weathering capabilities, and fracture toughness compared to conventional structural steels. In 2004, the Iowa Department of Transportation opened Iowa's first HPS girder bridge, the East 12th Street Bridge over I-235 in Des Moines, Iowa. The objective of this project was to evaluate HPS as a viable option for use in Iowa bridges with a continuous structural health monitoring (SHM) system. The scope of the project included documenting the construction of the East 12th Street Bridge and concurrently developing a remote, continuous SHM system using fiber-optic sensing technology to evaluate the structural performance of the bridge. The SHM system included bridge evaluation parameters, similar to design parameters used by bridge engineers, for evaluating the structure. Through the successful completion of this project, a baseline of bridge performance was established that can be used for continued long-term monitoring of the structure. In general, the structural performance of the HPS bridge exceeded the design parameters and is performing well. Although some problems were encountered with the SHM system, the system functions well and recommendations for improving the system have been made.
Resumo:
Objectives: To assess the difference in direct medical costs between on-demand (OD) treatment with esomeprazole (E) 20 mg and continuous (C) treatment with E 20 mg q.d. from a clinical practice view in patients with gastroesophageal reflux disease (GERD) symptoms. Methods: This open, randomized study (ONE: on-demand Nexium evaluation) compared two long-term management options with E 20 mg in endoscopically uninvestigated patients seeking primary care for GERD symptoms who demonstrated complete relief of symptoms after an initial treatment of 4 weeks with E 40 mg. Data on consumed quantities of all cost items were collected in the study, while data on prices during the time of study were collected separately. The analysis was done from a societal perspective. Results: Forty-nine percent (484 of 991) of patients randomized to the OD regimen and 46% (420 of 913) of the patients in the C group had at least one contact with the investigator that would have occurred nonprotocol-driven. The difference of the adjusted mean direct medical costs between the treatment groups was CHF 88.72 (95% confidence interval: CHF 41.34-153.95) in favor of the OD treatment strategy (Wilcoxon rank-sum test: P < 0.0001). Adjusted direct nonmedical costs and productivity loss were similar in both groups. Conclusions: The adjusted direct medical costs of a 6-month OD treatment with esomeprazole 20 mg in uninvestigated patients with symptoms of GERD were significantly lower compared with a continuous treatment with E 20 mg once a day. The OD therapy represents a cost-saving alternative to the continuous treatment strategy with E.
Resumo:
This report addresses the field testing and analysis of those results to establish the behavior of the original Clive Road Bridge that carried highway traffic over Interstate 80 (I-80) in the northwest region of Des Moines, Iowa. The bridge was load tested in 1959, shortly after its construction and in 1993, just prior to its demolition. This report presents some of the results from both field tests, finite element predictions of the behavior of aluminum bridge girders, and load distribution studies.
Resumo:
Nous présontons l'étalonnage d'un test mnésique de recognition dans un échantillon de 180 adultes francophones de la Suisse Romande. Le test comprend trois formes utilisant un matériel verbal (mots) ou non verbal (visages ou paysages). Une attention particulière est accordée à l'âge dans la présentation des résultats. Celui-ci affecte plus précocement et plus intensément la performance aux formes non verbales qu'à la forme verbale du test. Il induit également une importante augmentation du nombre de fausses reconnaissances pour les formes non verbales.
Resumo:
Motivation: Hormone pathway interactions are crucial in shaping plant development, such as synergism between the auxin and brassinosteroid pathways in cell elongation. Both hormone pathways have been characterized in detail, revealing several feedback loops. The complexity of this network, combined with a shortage of kinetic data, renders its quantitative analysis virtually impossible at present.Results: As a first step towards overcoming these obstacles, we analyzed the network using a Boolean logic approach to build models of auxin and brassinosteroid signaling, and their interaction. To compare these discrete dynamic models across conditions, we transformed them into qualitative continuous systems, which predict network component states more accurately and can accommodate kinetic data as they become available. To this end, we developed an extension for the SQUAD software, allowing semi-quantitative analysis of network states. Contrasting the developmental output depending on cell type-specific modulators enabled us to identify a most parsimonious model, which explains initially paradoxical mutant phenotypes and revealed a novel physiological feature.
Resumo:
In 1957, the Iowa State Highway Commission, with financial assistance from the aluminum industry, constructed a 220-ft (67-m) long, four-span continuous, aluminum girder bridge to carry traffic on Clive Road (86th Street) over Interstate 80 near Des Moines, Iowa. The bridge had four, welded I-shape girders that were fabricated in pairs with welded diaphragms between an exterior and an interior girder. The interior diaphragms between the girder pairs were bolted to girder brackets. A composite, reinforced concrete deck served as the roadway surface. The bridge, which had performed successfully for about 35 years of service, was removed in the fall of 1993 to make way for an interchange at the same location. Prior to the bridge demolition, load tests were conducted to monitor girder and diaphragm bending strains and deflections in the northern end span. Fatigue testing of the aluminum girders that were removed from the end spans were conducted by applying constant-amplitude, cyclic loads. These tests established the fatigue strength of an existing, welded, flange-splice detail and added, welded, flange-cover plates and horizontal web plate attachment details. This part, Part 2, of the final report focuses on the fatigue tests of the aluminum girder sections that were removed from the bridge and on the analysis of the experimental data to establish the fatigue strength of full-size specimens. Seventeen fatigue fractures that were classified as Category E weld details developed in the seven girder test specimens. Linear regression analyses of the fatigue test results established both nominal and experimental stress-range versus load cycle relationships (SN curves) for the fatigue strength of fillet-welded connections. The nominal strength SN curve obtained by this research essentially matched the SN curve for Category E aluminum weldments given in the AASHTO LRFD specifications. All of the Category E fatigue fractures that developed in the girder test specimens satisfied the allowable SN relationship specified by the fatigue provisions of the Aluminum Association. The lower-bound strength line that was set at two standard deviations below the least squares regression line through the fatigue fracture data points related well with the Aluminum Association SN curve. The results from the experimental tests of this research have provided additional information regarding behavioral characteristics of full-size, aluminum members and have confirmed that aluminum has the strength properties needed for highway bridge girders.
Resumo:
Interior crises are understood as discontinuous changes of the size of a chaotic attractor that occur when an unstable periodic orbit collides with the chaotic attractor. We present here numerical evidence and theoretical reasoning which prove the existence of a chaos-chaos transition in which the change of the attractor size is sudden but continuous. This occurs in the Hindmarsh¿Rose model of a neuron, at the transition point between the bursting and spiking dynamics, which are two different dynamic behaviors that this system is able to present. Moreover, besides the change in attractor size, other significant properties of the system undergoing the transitions do change in a relevant qualitative way. The mechanism for such transition is understood in terms of a simple one-dimensional map whose dynamics undergoes a crossover between two different universal behaviors
Resumo:
OBJECTIVE: To determine the incidence and risk factors of electrical seizures and other electrical epileptic activity using continuous EEG (cEEG) in patients with acute stroke. METHODS: One hundred consecutive patients with acute stroke admitted to our stroke unit underwent cEEG using 10 electrodes. In addition to electrical seizures, repetitive focal sharp waves (RSHWs), repetitive focal spikes (RSPs), and periodic lateralized epileptic discharges (PLEDs) were recorded. RESULTS: In the 100 patients, cEEG was recorded for a mean duration of 17 hours 34 minutes (range 1 hour 12 minutes to 37 hours 10 minutes). Epileptic activity occurred in 17 patients and consisted of RSHWs in seven, RSPs in seven, and PLEDs in three. Electrical seizures occurred in two patients. On univariate Cox regression analysis, predictors for electrical epileptic activity were stroke severity (high score on the National Institutes of Health Stroke Scale) (hazard ratio [HR] 1.12; p = 0.002), cortical involvement (HR 5.71; p = 0.021), and thrombolysis (HR 3.27; p = 0.040). Age, sex, stroke type, use of EEG-modifying medication, and cardiovascular risk factors were not predictors of electrical epileptic activity. On multivariate analysis, stroke severity was the only independent predictor (HR 1.09; p = 0.016). CONCLUSION: In patients with acute stroke, electrical epileptic activity occurs more frequently than previously suspected.
Resumo:
The continuous wavelet transform is obtained as a maximumentropy solution of the corresponding inverse problem. It is well knownthat although a signal can be reconstructed from its wavelet transform,the expansion is not unique due to the redundancy of continuous wavelets.Hence, the inverse problem has no unique solution. If we want to recognizeone solution as "optimal", then an appropriate decision criterion hasto be adopted. We show here that the continuous wavelet transform is an"optimal" solution in a maximum entropy sense.
Resumo:
Under the circumstances of the increasing market pressure, enterprises try to improve their competitive position by development efforts, and a business development project is one tool for that. There are not many answers to the question of how the development projects launched to improve the business performance in SMEs have succeeded. Theacademic interest in the business development project success has mainly focused on projects implemented in larger organisations rather than in SMEs. The previous studies on the business success of SMEs have mainly focused on new business ventures rather than on existing SMEs. However, nowadays a large number of business development projects are undertaken in existing SMEs, where they can pose a great challenge. This study focuses on business development success in SMEs thathave already established their business. The objective of the present study is to gain a deep understanding on business development project success in the SME-context and to identify the dimensions and factors affecting the project success. Further, the aim is to clarify how the business development projects implemented in SMEs have affected their performance. The empirical evidence is based on multiple case study. This study builds a framework for a generic theory of business development success in the SME-context, based on literature from the areas ofproject and change management, entrepreneurship and small business management, as well as performance measurement, and on empirical evidence from SMES. The framework consists of five success dimensions: entrepreneurial, project preparation, change management, project management and project success. The framework provides a systematic way for analysing the business development project and its impact on the performance and on the performing company. This case evidence indicates that successful business development projects have a balanced, high performance concerning all the dimensions. Good performance in one dimension is not enoughfor the project success, but it gives a good ground for the other dimensions. The other way round, poor performance in one success dimension affects the others, leading to poor performance of the project. In the SME-context the business development project success seems to be dependent on several interrelated dimensions and factors. Success in one area leads to success in other areas, and so creates an upward success spiral. Failure in one area seems to lead to failure in other areas, creating a downward failure spiral. The study indicates that the internal business development projects have affected the SMEs' performance widely also on areas and functions not initially targeted. The implications cover all thesuccess categories: the project efficiency, the impact on the customer, the business success and the future potentiality. With successful cases, the success tends to spread out to areas and functions not mentioned as the project goals, andwith unsuccessful cases the failure seems to spread out widely to the SMEs' other functions. This study also indicates that the most important key factors for successful business development project implementation are the strength of intention, business ability, knowledge, motivation and participation of the employees, as well as adequate and well-timed training provided to the employees.
Resumo:
Carnitine-free total parenteral nutrition (TPN) is claimed to result in a carnitine deficiency with subsequent impairment of fat oxidation. The present study was designed to evaluate the possible benefit of carnitine supplementation on postoperative fat and nitrogen utilization. Sixteen patients undergoing total esophagectomy were evenly randomized and received TPN without or with L-carnitine supplementation (74 mumol.kg-1.d-1) during 11 postoperative days. On day 11, a 4-h infusion of L-carnitine (125 mumol/kg) was performed in both groups. The effect of supplementation was evaluated by indirect calorimetry, N balance, and repeated measurements of plasma lipids and ketone bodies. Irrespective of continuous or acute supplementation, respiratory quotient and fat oxidation were similarly maintained throughout the study in both groups whereas N balance appeared to be more favorable without carnitine. We conclude that carnitine-supplemented TPN does not improve fat oxidation or promote N utilization in the postoperative phase.
Resumo:
Tämän diplomityön tavoitteena oli selvittää ohutlevytuotteita valmistavan yrityksen tuotannonohjauksen nykytila ja kehitystä vaativat kohteet sekä laatia kehitysehdotuksia. Yrityksessävalmisteltiin samaan aikaan tutkimuksen aikana huomattavia tuotannonohjaukseen liittyviä kehitystoimia. Tutkimus käsitteli toiminnanohjaukseen sisältyviä aiheita, kuten tuotannonohjausta, tuotannon ohjattavuutta, varastoja ja organisaation kehittämistä. Tutkimustulokset osoittivat, että yrityksen on otettava käyttöön jatkuvan kehittämisen kulttuuri ja panostettava erityisesti suomalaiselle ohutlevyalalle tärkeisiin asioihin lukuisien
Resumo:
The objective of this work was to evaluate the addition of Bacillus subtilis probiotic to the feed of common snook (Centropomus undecimalis) fingerlings, in alternate and continuous regimens. Six hundred and sixty fish, with average length of 5.90±0.88 cm and weight of 1.92±0.28 g, were stocked in 12 cages of 1.0 m3, with 55 fish each. The experimental design was completely randomized, with three treatments and four replicates. The treatments consisted of diet with the addition of probiotic, provided in alternate regimen for 7 days and in continuous regimen; besides a control without probiotic in the feed. Zootechnical performance, body composition, immune response, and blood parameters were evaluated. No significant differences were observed in zootechnical performance indexes and in body composition of fish treated with probiotic, when compared to the control. Fish from the alternate regimen showed an increment in respiratory burst and a lower total erythrocyte count than fish from the continuous regimen and the control. Fish from the continuous regimen did not differ from those of the control. The addition of Bacillus subtilis does not increase growth rates of common snook fingerlings; however, it has an immunostimulant action when supplied in alternate regimen.
Resumo:
Tutkimuksen tavoitteena on tutkia telekommunikaatioalalla toimivan kohdeyrityksen ohjelmistojen toimitusprosessia° Tutkimus keskittyy mallintamaan toimitusprosessin, määrittelemään roolit ja vastuualueet, havaitsemaan ongelmakohdat ja ehdottamaan prosessille kehityskohteita. Näitä tavoitteita tarkastellaan teoreettisten prosessimallinnustekniikoiden ja tietojohtamisen SECI-prosessikehyksen läpi. Tärkein tiedonkeruun lähde oli haastatteluihin perustuva tutkimus, johon osallistuvat kaikki kohdeprosessiin kuuluvat yksiköt. Mallinnettu toimitusprosessi antoi kohdeyritykselle paremman käsityksen tarkasteltavasta prosessista ja siinä toimivien yksiköiden rooleistaja vastuualueista. Parannusehdotuksia olivat tiedonjaon kanavoinnin määritteleminen, luottamuksen ja sosiaalisten verkostojen parantaminen, ja tietojohtamisen laajamittainen implementointi.