973 resultados para Air Force Flight Test Center (U.S.)


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Automated airborne collision-detection systems are a key enabling technology for facilitat- ing the integration of unmanned aerial vehicles (UAVs) into the national airspace. These safety-critical systems must be sensitive enough to provide timely warnings of genuine air- borne collision threats, but not so sensitive as to cause excessive false-alarms. Hence, an accurate characterisation of detection and false alarm sensitivity is essential for understand- ing performance trade-offs, and system designers can exploit this characterisation to help achieve a desired balance in system performance. In this paper we experimentally evaluate a sky-region, image based, aircraft collision detection system that is based on morphologi- cal and temporal processing techniques. (Note that the examined detection approaches are not suitable for the detection of potential collision threats against a ground clutter back- ground). A novel collection methodology for collecting realistic airborne collision-course target footage in both head-on and tail-chase engagement geometries is described. Under (hazy) blue sky conditions, our proposed system achieved detection ranges greater than 1540m in 3 flight test cases with no false alarm events in 14.14 hours of non-target data (under cloudy conditions, the system achieved detection ranges greater than 1170m in 4 flight test cases with no false alarm events in 6.63 hours of non-target data). Importantly, this paper is the first documented presentation of detection range versus false alarm curves generated from airborne target and non-target image data.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper summarises the achievements of the Smart Skies Project, a three-year, multi-award winning international project that researched, developed and extensively flight tested four enabling aviation technologies: an electrooptical mid-air collision avoidance system, a static obstacle avoidance system, a mobile ground-based air traffic surveillance system, and a global automated airspace separation management system. The project included the development of manned and unmanned flight test aircraft, which were used to characterise the performance of the prototype systems for a range of realistic scenarios under a variety of environmental conditions. In addition to the collection of invaluable flight data, the project achieved world-firsts in the demonstration of future automated collision avoidance and separation management concepts. This paper summarises these outcomes, the overall objectives of the project, the research and the development of the prototype systems, the engineering of the flight test systems, and the results obtained from flight-testing.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Load bearing Light Gauge Steel Frame (LSF) walls made of cold-formed steel studs and tracks are commonly used in residential and commercial buildings. Fire safety of these walls is essential to minimize the damage caused by fire related accidents. Past investigations on the fire performance of load bearing LSF wall systems have been limited to LSF walls made of conventional lipped channel section studs. Although structurally efficient hollow flange steel sections are available in the building industry, they are not used as LSF wall studs due to the lack of fire performance data for such walls. The hollow flange sections have torsionally rigid hollow flanges that eliminate the occurrence of local and distortional buckling to an extent, thereby increasing their structural efficiency. The weaknesses of hollow flange sections such as lower lateral distortional buckling capacity are also eliminated when they are used as studs of LSF walls as the plasterboard restraints will prevent any lateral movement. Therefore hollow flange sections can be considered as structurally more efficient studs for use in LSF wall systems. This paper reports the full scale fire tests of LSF walls made of hollow flange section studs under standard fire conditions. The frames were made of 1.6 mm thick and 150 mm deep hollow flange section studs with two closed rectangular flanges of 45 mm width x 15 mm depth. Dual plasterboards were attached on both sides of the test wall panels. The load ratio was varied and the failure times, the lateral deflections and the axial displacements of the test walls were obtained. The failure behaviour of LSF walls made of hollow flange section studs was found to be different to that of LSF walls made of conventional lipped channel section studs. The results of these fire tests show that hollow flange section studs have a higher potential in being used in load bearing LSF Walls.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Fire safety design of building structures has received greater attention in recent times due to continuing losses of properties and lives in fires. However, the structural behaviour of thin-walled cold-formed steel columns under fire conditions is not well understood despite the increasing use of light gauge steels in building construction. Cold-formed steel columns are often subject to local buckling effects. Therefore a series of laboratory tests of lipped and unlipped channel columns made of varying steel thicknesses and grades was undertaken at uniform elevated temperatures up to 700°C under steady state conditions. Finite element models of the tested columns were also developed, and their elastic buckling and nonlinear analysis results were compared with test results at elevated temperatures. Effects of the degradation of mechanical properties of steel with temperature were included in the finite element analyses. The use of accurately measured yield stress, elasticity modulus and stress-strain curves at elevated temperatures provided a good comparison of the ultimate loads and load-deflection curves from tests and finite element analyses. The commonly used effective width design rules and the direct strength method at ambient temperature were then used to predict the ultimate loads at elevated temperatures by using the reduced mechanical properties. By comparing these predicted ultimate loads with those from tests and finite element analyses, the accuracy of using this design approach was evaluated.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This article discusses the design and development of GRDB (General Purpose Relational Data Base System) which has been implemented on a DEC-1090 system in Pascal. GRDB is a general purpose database system designed to be completely independent of the nature of data to be handled, since it is not tailored to the specific requirements of any particular enterprise. It can handle different types of data such as variable length records and textual data. Apart from the usual database facilities such as data definition and data manipulation, GRDB supports User Definition Language (UDL) and Security definition language. These facilities are provided through a SEQUEL-like General Purpose Query Language (GQL). GRDB provides adequate protection facilities up to the relation level. The concept of “security matrix” has been made use of to provide database protection. The concept of Unique IDentification number (UID) and Password is made use of to ensure user identification and authentication. The concept of static integrity constraints has been used to ensure data integrity. Considerable efforts have been made to improve the response time through indexing on the data files and query optimisation. GRDB is designed for an interactive use but alternate provision has been made for its use through batch mode also. A typical Air Force application (consisting of data about personnel, inventory control, and maintenance planning) has been used to test GRDB and it has been found to perform satisfactorily.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The records consist of documentation of the American Jewish Committee's project to describe Jewish participation in the United States Armed Forces during World War I. The bulk of the material consists of questionnaires that the AJC sent to servicemen to determine Jewish identity, which contain information on personal identification and details of military service. Responses to the questionnaire come from both Jews and non-Jews. In addition, the collection contains office papers concerning the project and a ledger of manuscripts. The manuscripts document the distribution of records the Office of Jewish War Records collected, as well as list Jews who died or were given military honors.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A study is presented which is aimed at developing techniques suitable for effective planning and efficient operation of fleets of aircraft typical of the air force of a developing country. An important aspect of fleet management, the problem of resource allocation for achieving prescribed operational effectiveness of the fleet, is considered. For analysis purposes, it is assumed that the planes operate in a single flying-base repair-depot environment. The perennial problem of resource allocation for fleet and facility buildup that faces planners is modeled and solved as an optimal control problem. These models contain two "policy" variables representing investments in aircraft and repair facilities. The feasibility of decentralized control is explored by assuming the two policy variables are under the control of two independent decisionmakers guided by different and not often well coordinated objectives.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper describes the use of simulation in the planning and operation of a small fleet of aircraft typical of the air force of a developing country. We consider a single flying base, where the opera tionally ready aircraft are stationed, and a repair depot, where the planes are overhauled. The measure of effectiveness used is "system availability, the percentage of airplanes that are usable. The system is modeled in GPSS as a cyclic queue process. The simulation model is used to perform sensitivity analyses and to validate the principal assumptions of the analytical model on which the simulation model is based.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A study is presented which is aimed at developing techniques suitable for effective planning and efficient operation of fleets of aircraft typical of the air force of a developing country. An important aspect of fleet management, the problem of resource allocation for achieving prescribed operational effectiveness of the fleet, is considered. For analysis purposes, it is assumed that the planes operate in a single flying-base repair-depot environment. The perennial problem of resource allocation for fleet and facility buildup that faces planners is modeled and solved as an optimal control problem. These models contain two "policy" variables representing investments in aircraft and repair facilities. The feasibility of decentralized control is explored by assuming the two policy variables are under the control of two independent decisionmakers guided by different and not often well coordinated objectives.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The high cost and extraordinary demands made on sophisticated air defence systems, pose hard challenges to the managers and engineers who plan the operation and maintenance of such systems. This paper presents a study aimed at developing simulation and systems analysis techniques for the effective planning and efficient operation of small fleets of aircraft, typical of the air force of a developing country. We consider an important aspect of fleet management: the problem of resource allocation for achieving prescribed operational effectiveness of the fleet. At this stage, we consider a single flying-base, where the operationally ready aircraft are stationed, and a repair-depot, where the planes are overhauled. An important measure of operational effectiveness is ‘ availability ’, which may be defined as the expected fraction of the fleet fit for use at a given instant. The tour of aircraft in a flying-base, repair-depot system through a cycle of ‘ operationally ready ’ and ‘ scheduled overhaul ’ phases is represented first by a deterministic flow process and then by a cyclic queuing process. Initially the steady-state availability at the flying-base is computed under the assumptions of Poisson arrivals, exponential service times and an equivalent singleserver repair-depot. This analysis also brings out the effect of fleet size on availability. It defines a ‘ small ’ fleet essentially in terms of the important ‘ traffic ’ parameter of service rate/maximum arrival rate.A simulation model of the system has been developed using GPSS to study sensitivity to distributional assumptions, to validate the principal assumptions of the analytical model such as the single-server assumption and to obtain confidence intervals for the statistical parameters of interest.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A study on the reproductive biology of Amblema neislerii, Elliptoideus sloatianus, Lampsilis subangulata, Medionidus penicillatus, and Pleurobema pyriforme was conducted from May 1995 to May 1997. The objectives of this study were as follows: 1) determine period of gravidity for each of the five mussel species, 2) determine host fish via laboratory experiments, 3) test whether unionid glochidia will transform on a nonidingenous fish, and 4) describe the glochidial morphology for each of the five mussel species using a scanning electron microscope. Amblema neislerii are tachytictic breeders and were found with mature glochidia in May. Elliptoideus sloatianus are tachytictic breeders and were found with mature glochidia from late February to early April. Lampsilis subangulata are bradytictic breeders and were found with mature glochidia from December to August. Superconglutinates were released by L. subangulata from late May to early July. Medionidus penicillatus are bradytictic breeders and were found with mature glochidia in November and February to April. Pleurobema pyriforme are tachytictic breeders and were found with mature glochidia from March to July. The following fish species served as hosts for A. neislerii: Notropis texanus, Lepomis macrochirus, L. microlophus, Micropterus salmoides, and Percina nigrofasciata. The following fish species served as hosts for E. sloatianus: Gambusia holbrooki, Poecilia reticulata, and P. nigrofasciata. The following fish species served as hosts for L. subangulata: G. holbrooki, P. reticulata, L. macrochirus, Micropterus punctulatus, and M. salmoides. The following fish species served as hosts for M. penicillatus: G. holbrooki, P. reticulata, Etheostoma edwini, and P. nigrofasciata. The following fish species served as hosts for P. pyriforme: Pteronotropis hypselopterus, G. holbrooki, and P. reticulata. Poecilia reticulata, a nonindigenous fish, served as a host for E. sloatianus, L. subangulata, M. penicillatus, and P. pyriforme. (76 page document)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

HIGHLIGHTS FOR FY 2007 1. Completed a three-year Gulf sturgeon population study on the Escambia River, Florida. The population was estimated at 451 fish. 2. Implemented the Gulf Striped Bass Restoration Plan by coordinating the 24th Annual Morone Workshop, leading the technical committee, transporting broodfish, coordinating stocking on the Apalachicola-Chattahoochee-Flint (ACF) river system, and evaluating post-stocking success. 3. Completed a survey to document the extent of aquatic resources, recreational fishing opportunities, and fishery management needs on Department of Defense (DoD) facilities located in Region 4. 4. Continued a project in the Apalachicola River to describe the effects of exceptional drought conditions on freshwater mussel recovery. 5. Initiated a study to locate extant populations of the federally endangered Ochlockonee moccasinshell in the Ochlockonee River Basin. We documented the first live individuals in 14 years. 6. Completed a five-year status review for seven threatened and endangered freshwater mussels in the NEG drainages. 7. Restored Mill Creek to improve habitat for the endangered Okaloosa darter by removing six fish passage barriers and creating approximately 3,000 linear feet of new and regenerated stream channel with floodplain and native vegetation. 8. Completed a fish passage project that connected about 5 miles of habitat in Little Rocky Creek, Eglin Air Force Base, to benefit the Okaloosa darter. 9. Completed a threats analysis to aquatic species in the Chipola River watershed using GIS stream data, aerial imagery, and land cover data. 10. Multiple outreach projects were completed to detail aquatic resource conservation needs and opportunities, including National Fishing Week, Earth Day, several festivals, and school outreach.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

HIGHLIGHTS FOR FY 2006 1. Captured and tagged 475 Gulf sturgeons in five Florida rivers and one bay. 2. Documented Gulf sturgeon marine movement and habitat use in the Gulf of Mexico. 3. Assisted the National Oceanic and Atmospheric Administration (NOAA) with the collection of Gulf sturgeon, implantation of acoustic tags, and monitoring of fish in a study to examine movement patterns and habitat use in Pensacola and Choctawhatchee bays post-Hurricane Ivan. 4. Provided technical assistance to Jon “Bo” Sawyer in completing a study – Summer Resting Areas of the Gulf Sturgeon in the Conecuh/Escambia River System, Alabama-Florida – for acquiring a Degree of Master of Science at Troy University, Alabama. 5. Coordinated tagging and data collection with NOAA observers aboard trawlers while collecting Gulf sturgeon during dredging operations in the coastal Gulf of Mexico. 6. Hosted the 7th Annual Gulf Sturgeon Workshop. 7. Implemented Gulf Striped Bass Restoration Plan by coordinating the 23rd Annual Morone Workshop, leading the technical committee, transporting broodfish, coordinating the stocking on the Apalachicola-Chattahoochee-Flint (ACF) river system, and evaluating post-stocking success. 8. Continued updating and managing the Freshwater Mussel Survey Database, a Geographic Information System (GIS) database, for over 800 unique sites in the Northeast Gulf (NEG) drainages in Alabama (AL), Georgia (GA), and Florida (FL). 9. Formed a recovery implementation team for listed mussels in the ACF river basin and oversaw grant cooperative agreements for 14 listed and candidate freshwater mussels in the NEG watersheds. 10. Initiated a project in the Apalachicola River to relocate mussels stranded as a result of drought conditions, and calculate river flows at which mussels would be exposed. 11. Initiated a project in Sawhatchee Creek, Georgia to determine the status of threatened and endangered (T&E) freshwater mussels and target restoration projects, population assessments, and potential population augmentation to lead toward recovery of the listed species. 12. Initiated a study to determine the age and growth of the endangered fat threeridge mussel (Amblema neislerii). 13. Provided technical assistance to the Panama City Ecological Services office for a biological opinion on the operations of Jim Woodruff Lock and Dam and its effects on the listed species and designated and proposed critical habitat in the Apalachicola River, Florida. 14. Assisted with a multi-State, inter-agency team to develop a management plan to restore the Alabama shad in the ACF river system. 15. Conducted fishery surveys on Tyndall AFB, Florida and Ft. Benning, Georgia and completed a report with recommendations for future recreational fishery needs. 16. Provided fishery technical assistance to four National Wildlife Refuges (NWR) (i.e., Okefenokee NWR, Banks Lake NWR, St. Vincent NWR, and St. Marks NWR). 17. Initiated an Aquatic Resources and Recreation Fishing Survey on Department of Defense facilities located in Region 4. 18. Identified 130 road-stream crossings on Eglin AFB for rehabilitation and elimination of sediment imputs. 19. Continued the Aquatics Monitoring Program at Eglin AFB to assess techniques that determine current status and sustainability of aquatic habitat and develop a measure to determine quality or degradation of habitat. 20. Assisted Eglin AFB Natural Resource managers in revising the installation’s Integrated Natural Resources Management Plan (INRMP) and its associated component plans. 21. Coordinated recovery efforts for the endangered Okaloosa darter including population/life history surveys, stream restoration, and outreach activities. 22. Initiated a comprehensive status review of the Okaloosa darter with analyses performed to assess available habitat, preferred habitats, range expansions/reductions/fragmentations, population size, and probability of extinction. 23. Assisted the Gulf Coastal Plain Ecosystem Partnership and the Florida Fish and Wildlife Conservation Commission (FWC) under a Memorandum of Agreement to develop conservation strategies, implement monitoring and assessment programs, and secure funds for aquatic management programs in six watersheds in northwest Florida and southeast Alabama. 24. Entered into a cooperative agreement with the U.S. Air Force to encourage the conservation and rehabilitation of natural resources at Hurlburt Field, Florida. 25. Multiple outreach projects were completed to detail aquatic resources’ conservation needs and opportunities; including National Fishing Week, Earth Day, several festivals, and school outreach.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

HIGHLIGHTS FOR FY 2004 1. Completed the second of a 3-year Gulf sturgeon population estimate on the Escambia River, Florida. 2. Completed the first of a 2-year Gulf sturgeon population estimate on the Apalachicola River, Florida. 3. Conducted Gulf sturgeon presence-absence surveys in three other Florida river systems. 4. Documented Gulf sturgeon marine habitat use in the near shore waters of the Gulf of Mexico. 5. Identified environmental threats to Gulf sturgeon spawning habitat in the Choctawhatchee River, Florida. 6. Initiated a study to document Gulf sturgeon spawning with the collection of fertilized eggs in the Yellow River, Florida. 7. Implemented Gulf Striped Bass Restoration Plan by coordinating the 21st Annual Morone Workshop, leading the technical committee, transporting broodfish, and coordinating the stocking on the Apalachicola-Chattahoochee-Flint (ACF) river system. 8. Over 86,000 Phase II Gulf striped bass were marked with sequential coded wire tags and stocked in Lake Seminole and the Apalachicola River. Post-stocking evaluations were conducted at 31 sites. 9. Drafted updates to Apalachicola-Chattahoochee-Flint Striped Bass Restoration and Evaluation Five-Year Plan with partners. 10. Fishery surveys were conducted on Tyndall Air Force Base and St. Marks and St. Vincent National Wildlife Refuges. 11. Habitat evaluations and population surveys were completed at 153 Okaloosa darter stream sites. 12. Aquatic insect biomonitoring and identification of over 39,000 individual aquatic macroinvertebrates was completed and provided to Eglin Air Force Base. 13. Ten years of fishery data from Okefenokee and Banks Lake National Wildlife Refuges was analyzed with recommendations incorporated into the refuge Comprehensive Conservation Plan. 14. A draft mussel sampling protocol was tested in wadeable streams in northwest Florida and southwest Georgia. 15. Implemented recovery plan and candidate conservation actions for 14 listed and candidate freshwater mussels in the Northeast Gulf Watersheds. 16. Worked with partners in developing the Spring Creek Watershed Partnership in the Flint River basin, Georgia. 17. Multiple stream restoration and watershed management projects were initiated or completed. A total of 6.8 stream miles were restored for stream fishes, along with 56.4 miles of coastline were enhanced for sea turtle lighting. A total of 135 acres of wetlands and 58 acres of understory habitat were restored. 18. Multiple outreach projects were completed to detail aquatic resources conservation needs and opportunities. Participated in National Fishing Week event, BASS ProShops event, several festivals, and school outreach.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

HIGHLIGHTS FOR FY 2003 1. Continued a 3-year threatened Gulf sturgeon population estimate in the Escambia River, Florida and conducted presence-absence surveys in 4 other Florida river systems and 1 bay. 2. Five juvenile Gulf sturgeon collected, near the mouth of the Choctawhatchee River, Florida, were equipped with sonic tags and monitored while over-wintering in Choctawhatchee Bay. 3. Continued to examine Gulf sturgeon marine habitat use. 4. Implemented Gulf Striped Bass Restoration Plan by coordinating the 20th Annual Morone Workshop, leading the technical committee, transporting broodfish, and coordinating the stocking on the Apalachicola-Chattahoochee-Flint (ACF) river system. 5. Over 73,000 Phase II Gulf striped bass were marked with sequential coded wire tags and stocked in the Apalachicola River. Post-stocking evaluations were conducted at 31 sites. 6. Three stream fisheries assessment s were completed to evaluate the fish community at sites slated for habitat restoration by the Partners for Fish and Wildlife Program (PFW). 7. PFW program identified restoration needs and opportunities for 10 areas. 8. Developed an Unpaved Road Evaluation Handbook. 9. Completed restoration of Chipola River Greenway, Seibenhener Streambank Restoration, Blackwater River State Forest, and Anderson Property. 10. Assessments for fluvial geomorphic conditions for design criteria were completed for 3 projects. 11. Geomorphology in Florida streams initiated development of Rosgen regional curves for Northwest Florida for use by the Florida Department of Transportation. 12. Developed a Memorandum of Understanding between partners for enhancing, protecting, and restoring stream, wetland, and upland habitat in northwest Florida 13. Completed aquatic fauna and fish surveys with new emphasis on integration of data from reach level into watershed and landscape scale and keeping database current. 14. Compliance based sampling of impaired waterbodies on Eglin Air Force Base in conjunction with Florida Department of Environmental Protection for Total Maximum Daily Load development support. 15. Surveyed 20 sites for the federally endangered Okaloosa darter, provided habitat descriptions, worked with partners to implement key recovery tasks and set priorities for restoration. 16. Worked with partners to develop a freshwater mussel survey protocol to provide standard operating procedures for establishing the presence/absence of federally listed mussel species within a Federal project area. 17. GIS database was created to identify all known freshwater mussel records from the northeast Gulf ecosystem. 18. Completed recovery plan for seven freshwater mussels and drafted candidate elevation package for seven additional mussels. Developed proposals to implement recovery plan. 19. Worked with Corps of Engineers and State partners to develop improved reservoir operating policies to benefit both riverine and reservoir fisheries for the ACF river system. 20. Multiple outreach projects were completed to detail aquatic resources conservation opportunities. 21. Multiple stream restoration and watershed management projects initiated or completed (see Appendix A).