978 resultados para Administrative Plan
Resumo:
Nivel educativo: Grado. Duración (en horas): Más de 50 horas
Resumo:
Elaboración de un plan de negocio para la puesta en marcha de una Agencia de Comunicación Digital Gastronómica.
Resumo:
In 1948, the U.S.S.R. began a global campaign of illegal whaling that lasted for three decades and, together with the poorly managed “legal” whaling of other nations, seriously depleted whale populations. Although the general story of this whaling has been told and the catch record largely corrected for the Southern Hemisphere, major gaps remain in the North Pacific. Furthermore, little attention has been paid to the details of this system or its economic context. Using interviews with former Soviet whalers and biologists as well as previously unavailable reports and other material in Russian, our objective is to describe how the Soviet whaling industry was structured and how it worked, from the largest scale of state industrial planning down to the daily details of the ways in which whales were caught and processed, and how data sent to the Bureau of International Whaling Statistics were falsified. Soviet whaling began with the factory ship Aleut in 1933, but by 1963 the industry had a truly global reach, with seven factory fleets (some very large). Catches were driven by a state planning system that set annual production targets. The system gave bonuses and honors only when these were met or exceeded, and it frequently increased the following year’s targets to match the previous year’s production; scientific estimates of the sustainability of the resource were largely ignored. Inevitably, this system led to whale populations being rapidly reduced. Furthermore, productivity was measured in gross output (weights of whales caught), regardless of whether carcasses were sound or rotten, or whether much of the animal was unutilized. Whaling fleets employed numerous people, including women (in one case as the captain of a catcher boat). Because of relatively high salaries and the potential for bonuses, positions in the whaling industry were much sought-after. Catching and processing of whales was highly mechanized and became increasingly efficient as the industry gained more experience. In a single day, the largest factory ships could process up to 200 small sperm whales, Physeter macrocephalus; 100 humpback whales, Megaptera novaeangliae; or 30–35 pygmy blue whales, Balaenoptera musculus brevicauda. However, processing of many animals involved nothing more than stripping the carcass of blubber and then discarding the rest. Until 1952, the main product was whale oil; only later was baleen whale meat regularly utilized. Falsified data on catches were routinely submitted to the Bureau of International Whaling Statistics, but the true catch and biological data were preserved for research and administrative purposes. National inspectors were present at most times, but, with occasional exceptions, they worked primarily to assist fulfillment of plan targets and routinely ignored the illegal nature of many catches. In all, during 40 years of whaling in the Antarctic, the U.S.S.R. reported 185,778 whales taken but at least 338,336 were actually killed. Data for the North Pacific are currently incomplete, but from provisional data we estimate that at least 30,000 whales were killed illegally in this ocean. Overall, we judge that, worldwide, the U.S.S.R. killed approximately 180,000 whales illegally and caused a number of population crashes. Finally, we note that Soviet illegal catches continued after 1972 despite the presence of international observers on factory fleets.
Resumo:
Historic map of the River Lune Fishery District.
Resumo:
This is the Water Level Management Plan for the Rostherne Mere by the Environment Agency. The purpose of the Plan is to provide a formal basis for managing the land drainage system and water supply system of the area in order to provide a sustainable balance between the conservation and agricultural interest in the area. No changes are proposed to present water level management or maintenance practices unless and until such changes are agreed by all parties. The report contains sections on description of Site, water level management, maintenance, nature conservation, agriculture, fisheries, archaeology, water quality and water resources, development adjacent to watercourses, contingencies and objectives of the Water Level Management.
Resumo:
This is a report on the Conservation Plan for Rostherne Mere. The project primarly involved collating existing information from a variety of sources, supplemented by a limited amount of survey work commissioned for the project, including identification of the surface water catchment, water flows, and land use within the catchment. The section 1 outlines the physical situation of the Site of Special Scientific Interest (SSSI), its geological setting and hydrological regime. A summary of the ecological characteristics, conservation interest and objectives is provided in Section 2, and the issues affecting the site are identified in Section 3. . Operations and mechanisms for addressing the issues are suggested in Section 4, compiled from field visits, information held on file by English Nature and the Environment Agency, and English Nature. The last Section 5 provides a brief summary of the site’s condition and a discussion of the issues and operations suggested. A summary table is provided of the recommended actions for each site. Supporting information on the hydrology and aquatic ecology (where relevant) is provided in appendices.
Resumo:
This is the River Gowy and Thornton Brook improvements: Environmental Action Plan report produced by the Environment Agency in 2000. This Environmental Action Plan relates to the proposals by the Environment Agency to improve the flood defences of land adjacent to the River Gowy, about 3 km east of Ellesmere Port, Cheshire. The purpose of the Environmental Action Plan (EAP) is to provide details of how the issues addressed in the Environmental Statement (ES) will be carried through to the completion of the project. The EAP represents a commitment to the environmental recommendations formulated during the environmental assessment process and should be closely adhered to during the design, construction and post project monitoring o f the works. For any matters that cannot be finalised until during construction the constraints will be detailed in the plan so they are implemented in the contracts.
Resumo:
This is the River Camel Salmon Action Plan Final document produced by the Environment Agency in 2002. This final Salmon Action Plan (SAP) for the River Camel catchment has been produced after consideration of feedback from external consultation. It provides a list of the agreed issues and actions for the next five years to maintain and improve the River Camel salmon stock. The actions presented within this Salmon Action Plan clarify the important issues and factors currently limiting the salmon stock on the river. The resolution of these issues should ensure that a sustainable salmon population will be maintained for future generations. An attempt has been made to cost these actions, identify possible sources of funding and to provide a timescale for action. This Action Plan aims to promote long term collaboration and co-operation between the Agency and other interested parties to effectively and efficiently manage the stock of salmon on the River Camel.
Resumo:
This is the River Fowey Salmon Action Plan Final document produced by the Environment Agency in 2003. This final Salmon Action Plan (SAP) for the River Fowey catchment has been produced after consideration of feedback from external consultation. It provides a list of the agreed issues and actions for the next five years to maintain and improve the River Fowey salmon stock. The actions presented within this final Salmon Action Plan clarify the important issues and factors currently limiting the salmon stock on the river. The resolution of these issues should ensure that a sustainable salmon population will be maintained for future generations. The main objective of the Fowey SAP therefore, is to maintain, improve and develop the Fowey salmon stocks to a sustainable level that, on the basis of historic catch records, the catchment can clearly support. Although the Fowey is passing its conservation limit, the consultees felt very strongly that there were two major factors limiting the salmon stock of the River Fowey- the overgrazing of Bodmin Moor and the use of the catchment for water supply by South West Water.
Resumo:
This is the River Lynher Salmon Action Plan Final document produced by the Environment Agency in 1999. This final Salmon Action Plan (SAP) for the River Lynher catchment has been produced after consideration of feedback from external consultation. It provides a list of the agreed issues and actions for the next five years to maintain and improve the River Lynher salmon stock. The actions presented within this final Salmon Action Plan clarify the important issues and factors currently limiting the salmon stock on the river. The resolution of these issues should ensure that a sustainable salmon population will be maintained for future generations. The River Lynher salmon stock has suffered two periods of spawning target failure within the past ten years. This assessment can only be estimated and in this case is likely to be dependent on river flow and the availability of salmon to the rods as only rod catch is used in the compliance assessment.
Resumo:
This is the River Plym Salmon Action Plan Final document produced by the Environment Agency in 2003. This final Salmon Action Plan (SAP) for the River Plym catchment has been produced after consideration of feedback from external consultation. It provides a list of the agreed issues and actions for the next five years to maintain and improve the River Lynher salmon stock. These issues and actions follow on from the detailed analysis of the catchment, which is presented in the River Plym SAP Consultation document.The actions presented within this final Salmon Action Plan clarify the important issues and factors currently limiting the salmon stock on the river. The resolution of these issues should ensure that a sustainable salmon population will be maintained for future generations. The main objective of the River Plym SAP therefore, is to maintain, improve and develop the River Plym salmon stocks to a sustainable level that, on the basis of historic catch records, the catchment can clearly support. The River Plym has failed to pass its conservation limit since 1996, and the consultees felt very strongly that there were three major factors limiting the salmon stock of the River Plym.
Resumo:
This is the River Tavy Salmon Action Plan Final document produced by the Environment Agency in 2000. This final Salmon Action Plan (SAP) for the River Tavy catchment has been produced after consideration of feedback from external consultation. It provides a list of the agreed issues and actions for the next five years to maintain and improve the River Tavy salmon stock. The actions presented within this Salmon Action Plan clarify the important issues and factors currently limiting the salmon stock on the river. The resolution of these issues should ensure that a sustainable salmon population will be maintained for future generations. An attempt has been made to cost these actions, identify possible sources of funding and to provide a timescale for action. This Action Plan aims to promote long term collaboration and co-operation between the Agency and other interested parties to effectively and efficiently manage the stock of salmon on the River Tavy.
Resumo:
This is the River Yealm Salmon Action Plan Final document produced by the Environment Agency in 2003. This final Salmon Action Plan (SAP) for the River Yealm catchment has been produced after consideration of feedback from external consultation. It provides a list of the agreed issues and actions for the next five years to maintain and improve the River Yealm salmon stock. The actions presented within this Salmon Action Plan clarify the important issues and factors currently limiting the salmon stock on the river. The resolution of these issues should ensure that a sustainable salmon population will be maintained for future generations. An attempt has been made to cost these actions, identify possible sources of funding and to provide a timescale for action. The main objective of the River Yealm SAP is to maintain, improve and develop the River Yealm salmon stocks to a sustainable level that, on the basis of historic catch records, the catchment can clearly support.
Resumo:
This is the Rivers Avon & Erme Salmon Action Plan Final document produced by the Environment Agency in 2004. The Rivers Avon and Erme Salmon Action Plan (SAP) has been produced after consideration of feedback from public consultation. The final plan provides a list of the agreed issues and actions for the next five years to maintain and improve the salmon stocks and fisheries of both rivers. Efforts have been made to identify possible sources of funding, partners and timescales. It indicates how the plan will be managed, including the process for reviewing stock status, issues, actions and progress. Low marine survival is currently a major factor limiting the numbers of salmon returning to spawn in both the Avon and the Erme. Actions to improve the accessibility of spawning areas and to maximise the productivity of spawning and nursery habitats are seen as priorities, which should help to offset the low marine survival. The quality of the information available to assess salmon stocks is recognised as a limiting factor in the management of salmon fisheries. The SAP aims also to promote long term collaboration between the Agency and other interested parties in managing the salmon stocks and fisheries of the Avon and the Erme.
Resumo:
This is the River Axe Salmon Action Plan Final document produced by the Environment Agency in 2004. The River Axe Salmon Action Plan (SAP) has been produced after consideration of feedback from public consultation. The final plan provides a list of the agreed issues and actions for the next five years to maintain and improve the salmon stock of the River Axe. Efforts have been made to identify possible sources of funding, partners and timescales. It indicates how the plan will be managed, including the process for reviewing stock status, issues, actions and progress. Low marine survival is currently a major factor limiting salmon stocks throughout the United Kingdom. However, on the River Axe the freshwater environment is still the main factor limiting the recovery of the salmon stock. Most of the adults returning to the Axe at present are probably derived from hatchery reared smolts, although there has been some natural reproduction in recent years. Juvenile populations in the Yarty indicate that this is a tributary where salmon have started to re-establish a self-sustaining population. Actions to improve the quality of the freshwater environment, both in terms of water quality and sedimentation, are seen as the top priorities, and are required to allow the Axe to support a self-sustaining salmon population.