841 resultados para software project management
Resumo:
As a management tool Similation Software deserves greater analysis from both an academic and industrial viewpoint. A comparative study of three packages was carried out from a 'first time' use approach. This allowed the ease of use and package features to be assessed using a simple theoretical benchmark manufacturing process. To back the use of these packages an objective survey on simulation use and package features was carried out within the manufacturing industry.This identified the use of simulation software, its' applicability and preception of user requirements thereby proposing an ideal package.
Resumo:
Le projet de construction au XXIe siècle :nouveaux acteurs, nouvelles responsabilités. L’apparition de nouveaux intervenants dans les projets de contruction bouleverse le schéma classique Maître d’ouvrage – Architecte – Entrepreneur. Parmi ceux-ci, le Project Manager occupe une place de premier rang, dès lors qu’il interviendra bien souvent dès l’entame du projet et jusqu’à complétion de celui-ci. L’ouvrage offre une première analyse complète de sa situation juridique, en mêlant littérature juridique (belge, française et américaine) et pratique de terrain. Envisagé ici à travers le prisme de sa relation contractuelle avec le Maître d’ouvrage, le Project manager reçoit une définition légale d’où sont déduits les éléments essentiels de se son contrat. Son statut, ses missions ainsi que ses responsabilités sont identiés précisément et articulés harmonieusement avec ceux d’autre professionnels (arhitectes et entrepreneurs). Spécialement sur la question des reponsabilités, l’ouvrage démontre que certains cas de responsabilité traditionnellement imputés à l’un de ces autres acteurs pourront être imputés au Project Manager, allant dans le sens d’un régime unifié de responsabilité pour l’ensemble de ces acteurs. L’ouvrage s’enrichit encore d’un modèle contractuel de base et d’une bibliographie.Incontestablement, l’ouvrage vient combler un vide doctrinal et constituera un guide essentiel, tant pour les Maîtres d’ouvrage que pour les Project Manager.
Resumo:
Software metrics are the key tool in software quality management. In this paper, we propose to use support vector machines for regression applied to software metrics to predict software quality. In experiments we compare this method with other regression techniques such as Multivariate Linear Regression, Conjunctive Rule and Locally Weighted Regression. Results on benchmark dataset MIS, using mean absolute error, and correlation coefficient as regression performance measures, indicate that support vector machines regression is a promising technique for software quality prediction. In addition, our investigation of PCA based metrics extraction shows that using the first few Principal Components (PC) we can still get relatively good performance.
Resumo:
Research This paper outlines some of the key findings from an evaluation of the project and demonstrates that EC funded projects such as this, which seek to promote cross border collaboration and understanding (i.e. across organisational, sectoral and geographical boundaries) offer considerable learning potential – not least about variances in health politics across different communities. However, for this learning to be realised a comprehensive system of knowledge management needs to be an integral part of project planning alongside a system for sustaining embryonic professional networks. The concept of managing relationships was also a key part of the projects success. Executing a project funded by the EU demands the development of complex organisational skills to negotiate all the administrative challenges en route to successful completion and this project in particular relied for its success on the development of social relationships of trust and mutual respect across national, professional and social boundaries. Context A three–year European Commission funded project designed to exchange a wide range of staff (professional semiprofessional and voluntary staff in health and social care) project led by the University of Greenwich (UK) and the Université Catholique de Lille, France was completed this year (February 2008). The project was complex because it involved working in different national contexts, was multi-disciplinary, and demanded the negotiation of multiple boundaries. Theories A mixed method evaluation including written reports gathered immediately after each exchange visit and a post hoc series of individual interviews and focus groups was conducted in order to gain qualitative information (from the participants perspective) on their experiences and to identify any learning gained. Results Analysis of the data provided evidence of learning on a number of levels; personally, inter and intra professionally and organisationally as well as across sectors and also from a project management perspective. The learning crystallised around the extent of the differences noted by the participants between the UK and the French health and social care systems despite geographical proximity, common membership of the EU and many shared challenges in health and social care. The extent of these differences, noted at every level from policy to practice proved a rich source for reflection on organisational philosophies, ways of working, distribution of resources, professional roles and autonomy and professional registration and mobility - in short on health politics at ‘macro’ and ‘micro’ levels.
Resumo:
The construction industry is inherently risky, with a significant number of accidents and disasters occurring, particularly on confined construction sites. This research investigates and identifies the various issues affecting successful management of health and safety in confined construction sites. The rationale is that identifying the issues would assist the management of health and safety particularly in inner city centres which are mostly confined sites. Using empiricism epistemology, the methodology was based on qualitative research approach by means of multiple case studies in three different geographical locations of Ireland, UK and USA. Data on each case study were collected through individual interviews and focus group discussion with project participants. The findings suggest that three core issues are the underlying factors affecting management of health and safety on confined construction sites. It include, (i) lack of space, (ii) problem of co-ordination and management of site personnel, and (iii) overcrowding of workplace. The implication of this is that project teams and their organisations should see project processes from a holistic point of view, as a unified single system, where quick intervention in solving a particular issue should be the norm, so as not to adversely affect interrelated sequence of events in project operations. Proactive strategies should be devised to mitigate these issues and may include detail project programming, space management, effective constructability review and efficient co-ordination of personnel, plant and materials among others. The value of this research is to aid management and operation of brownfield sites by identifying issues impacting on health and safety management in project process.
Resumo:
Purpose – The purpose of this paper is to identify, clarify and tabulate the various managerial issues encountered, to aid in the management of the complex health and safety concerns which occur within a confined construction site environment.
Design/methodology/approach – This is achieved through conducting extensive qualitative and qualitative research in the form of case studies, interviews and questionnaire survey.
Findings – The leading managerial issues in the management of health and safety on a confined construction site are found to be: “Difficulty to move materials around site safely”; “Lack of adequate room for the effective handling of materials”; “Difficulty in ensuring site is tidy and all plant and materials are stored safely”; “Close proximity of individuals to operation of large plant and machinery”; and joint fifth “Difficulty in ensuring proper arrangement and collection of waste materials on-site” along with “Difficulty in controlling hazardous materials and equipment on site”.
Practical implications – The resulting implication for practice of these results can be summarised by identifying that with sustained development of urban centres on a global scale, coupled with the increasing complexity of architectural designs, the majority of on-site project management professionals are faced with the onerous task of completing often intricate designs within a limited spatial environment, under strict health and safety parameters.
Originality/value – The subsequent value of the findings are such that just as on-site management professionals successfully identify the various managerial issues highlighted, the successful management of health and safety on a confined construction site is attainable.
Resumo:
The aim of this paper is to identify and classify the numerous managerial issues encountered in the management of personnel in confined site construction. For the purpose of this research, a confined construction site is defined as a site where permanent works fit the site footprint, extending to levels above and/or below ground level, leaving spatial restrictions for other operations (e.g. plant and material movements, materials storage and temporary accommodation etc.) and require effective resource co-ordination beyond normal on-site management input. A literature review and analysis, case studies incorporating interviews and focus groups along with a questionnaire survey were used in order to gain a comprehensive insight into the issues in the management of personnel in a confined construction site environment. The following are the top five leading issues highlighted in the management of personnel in confined site construction; (1) Accidents due to an untidy site, (2) One contractor holding up another because of the lack of space, (3) A risk to personnel because of vehicular traffic on-site, (4) Difficult to facilitate several contractors at one work location, and (5) Numerous personnel working within the one space. In today’s modern environment, spatial restrictions are quickly becoming the norm in the industry. Therefore, the management of personnel on-site becomes progressively more difficult with the decrease in available space on-site. Where such environments exist, acknowledging the numerous issues highlighted above, aids site management in the supervision and co-ordination of personnel on-site, thus reducing accidents, increasing productivity and increase profit margins, in spatially restricted environments. As on-site management professionals successfully identify, acknowledge and counteract the numerous issues illustrated, the successful management of personnel on a confined construction site is achievable. By identifying the numerous issues, on-site management can proactively mitigate such issues through adopting counteractive measures and through successful identification of the traits identified.
Resumo:
The overall aim of this research is to identify and catalogue the numerous managerial strategies for effective management of health and safety on a confined, urban, construction site. A mixed methods methodology was adopted using interviews and focus group discussions on three selected case studies of confined construction sites. In addition to these, a questionnaire survey was used based on the findings from the interviews and the focus group discussions. The top five key strategies include (1) Employ safe system of work plans to mitigate personnel health and safety issues; (2) Inform personnel, before starting on-site, of the potential issues using site inductions; (3) Effective communication among site personnel; (4) Draft and implement an effective design site layout prior to starting on-site; and (5) Use of banksman (traffic co-ordinator) to segregate personnel from vehicular traffic. The construction sector is one of the leading industries in accident causation and with the continued development and regeneration of our urban centres, confined site construction is quickly becoming the norm - an environment which only fuels accident creation within the construction sector. This research aids on-site management that requires direction and assistance in the identification and implementation of key strategies for the management of health and safety, particularly in confined construction site environments.
Resumo:
An approach to the management of non-functional concerns in massively parallel and/or distributed architectures that marries parallel programming patterns with autonomic computing is presented. The necessity and suitability of the adoption of autonomic techniques are evidenced. Issues arising in the implementation of autonomic managers taking care of multiple concerns and of coordination among hierarchies of such autonomic managers are discussed. Experimental results are presented that demonstrate the feasibility of the approach.
Resumo:
Cloud services are exploding, and organizations are converging their data centers in order to take advantage of the predictability, continuity, and quality of service delivered by virtualization technologies. In parallel, energy-efficient and high-security networking is of increasing importance. Network operators, and service and product providers require a new network solution to efficiently tackle the increasing demands of this changing network landscape. Software-defined networking has emerged as an efficient network technology capable of supporting the dynamic nature of future network functions and intelligent applications while lowering operating costs through simplified hardware, software, and management. In this article, the question of how to achieve a successful carrier grade network with software-defined networking is raised. Specific focus is placed on the challenges of network performance, scalability, security, and interoperability with the proposal of potential solution directions.
Resumo:
This research assesses the effectiveness of current MSc. Construction Project Management programmes within the UK and Ireland. A review of published prospectuses is used to create questionnaires for universities, graduates and employers. Responses provide an insight into programme creation and their relative success in addressing the needs of industry and in achieving other educational objectives. Since the majority of learning institutions have attained professional accreditation, it is useful to review these awards and to assess their potential value to both graduates and industry alike. Interviews are conducted with representatives from the main professional accrediting bodies to understand their procedures and rigour in enforcing standards of education and training. The results show that project management education could be further enhanced by the inclusion of more practical learning and that current programmes place greater emphasis on hard skills at the expense of the softer human skills. There is clearly a need for a closer working relationship between academics and practitioners to tackle the perceived gap between theoretical learning and construction practice. Learning institutions can use the findings to improve their programmes and address the education deficiencies identified by the industry, by the professional institutions and by graduates.
Resumo:
Good performance characterizes project success and value for money. However, performance problems are not uncommon in project management. Incentivization is generally recognized as a strategy of addressing performance problems. This chapter aims to explore incentive mechanisms and their impact on project performance. It is mainly based on the use of incentives in construction and engineering projects. The same principles apply to project management in other industry sectors. Incentivization can be used in such performance areas as time, cost, quality, safety and environment. A client has different ways of incentivizing his contractor’s performance, e.g. (1) a single incentive or multiple incentives; and (2) incentives or disincentives or a combination of both. The establishment of incentive mechanisms proves to have a significant potential for relationship development, process enhancement and performance improvement. In order to ensure the success of incentive mechanisms, both contractors and clients need to make extra efforts. As a result, a link is developed among incentive mechanisms, project management system and project performance.
Resumo:
There is still a lack of effective paradigms and tools for analysing and discovering the contents and relationships of project knowledge contexts in the field of project management. In this paper, a new framework for extracting and representing project knowledge contexts using topic models and dynamic knowledge maps under big data environments is proposed and developed. The conceptual paradigm, theoretical underpinning, extended topic model, and illustration examples of the ontology model for project knowledge maps are presented, with further research work envisaged.