998 resultados para road project
Resumo:
The recycling of pavements is nowadays a very important question to the road paving industry. With the objective of incorporating higher percentages of reclaimed asphalt (RA) materials in recycled asphalt mixtures, new techniques have been developed in the last years. The use of foamed bitumen is normally associated with the production of cold asphalt mixtures, which usually show lower quality standards. However, the objective of the work presented in this paper is to assess the use of foamed bitumen as the binder of warm asphalt mixtures incorporating 30% RA, which have quality standards similar to those of conventional mixtures. Thus, five mixtures have been produced with 30% RA, one of them with a conventional bitumen (control mix) and the others with foamed bitumen at different production temperatures. The mixtures were tested for compactability and water sensitivity and the results show a possible reduction of 25 ºC in the production temperatures, while the water sensitivity test results were kept close to 90 %.
Resumo:
Road pavements are very important infrastructures for the Society, but they can cause serious environmental impacts during construction, operation and rehabilitation phases. Thus, it is essential to develop surface paving solutions that promote not only the durability but also a comfortable and safe use. In fact, this work aims to study the properties of new opengraded mixtures for surface layers produced with plastic wastes. First, HDPE and EVA wastes were used as bitumen modifiers, and then another plastic waste (PEX) replaced part of the aggregates. After studying the modified binders, the open-graded mixtures were designed, and then they were tested concerning their particle loss, rutting resistance, surface texture and damping effect. It was concluded that both ways of using the plastic wastes can improve the mechanical and functional properties of the open-graded mixtures related to the pavement performance.
Resumo:
This work compares the viscoelastic properties of an asphalt binder (70/100 pen) modified with different waste plastics and the mechanical properties of the resultant asphalt mixtures. Two different plastic wastes were used, namely recycled HDPE and EVA. Three different polymer modified binders were produced with these plastic wastes: i) 5% HDPE modified binder (P5); ii) 5% EVA modified binder (E5) and; iii) a modified binder with 4% of EVA and 2% HDPE (E4P2). Asphalt mixtures were produced with these modified binders, and their mechanical properties were analysed and compared with a conventional mixture produced with a 30/50 pen bitumen. It was possible to conclude that these recycled polymers are able to improve the mechanical performance of the asphalt mixtures used in road paving.
Resumo:
The increasing environmental concern about waste materials and the necessity of improving the performance of asphalt mixtures prompted the study of incorporating different waste materials in conventional bitumen. The reuse of waste materials can present benefits at an environmental and economic level, and some wastes can be used to improve the pavement performance. Thus, the purpose of this study is to evaluate the incorporation of different waste materials in bitumen, namely waste motor oil and different polymers. In order to accomplish this goal, 10% of waste motor oil and 5% of polymers (high density polyethylene, crumb rubber and styrene-butadiene-styrene) were added to a conventional bitumen and the resulting modified bitumens were characterized through basic and rheological tests. From this work, it can be concluded that the incorporation of different waste materials improve some important properties of the conventional bitumen. Such improvements might indicate a good behaviour at medium/high temperatures and an increase of fatigue and rutting resistance. Therefore, these modified bitumens with waste materials can contribute to a sustainable development of road paving industry due to their performance and environmental advantages.
Resumo:
O objetivo deste trabalho é apresentar os resultados da análise das concepções de dois protagonistas de uma reforma curricular que está sendo implementada numa escola de engenharia. A principal característica do novo currículo é o uso de projetos e oficinas como atividades complementares a serem realizadas pelos estudantes. As atividades complementares acontecerão em paralelo ao trabalho realizado nas disciplinas sem que haja uma relação de interdisciplinaridade. O novo currículo está sendo implantado desde fevereiro de 2015. Segundo Pacheco (2005) há dois momentos, dentre outros, no processo de mudança curricular, o currículo “ideal”, determinado por dimensões epistemológica, política, econômica, ideológica, técnica, estética, e histórica e, que recebe influência direta daquele que idealiza e cria o novo currículo e, o currículo “formal” que se traduz na prática implementada na escola. São essas duas etapas estudadas nesta pesquisa. Para isso serão considerados como fontes de dados dois protagonistas, um mais ligado à concepção do currículo e outro da sua implementação, a partir dos quais se busca compreender as motivações, crenças e percepções que, por sua vez, determinam a reforma curricular. Entrevistas semiestruturadas foram utilizadas como técnica de pesquisa, com o propósito de se entender a gênese da proposta e as mudanças entre essas duas etapas. Os dados revelam que mudanças aconteceram desde a idealização até a formalização do currículo, motivadas por demandas do processo de implementação, revela ainda diferenças na visão de currículo e a motivação para romper com padrões na formação de engenheiros no Brasil.
Resumo:
Studies in Computational Intelligence, 616
Resumo:
Companies from the motorcycles components branch are dealing with a dynamic environment, resulting from the introduction of new products and the increase of market demand. This dynamic environment requires frequent changes in production lines and requires flexibility in the processes, which can cause reductions in the level of quality and productivity. This paper presents a Lean Six Sigma improvement project performed in a production line of the company's machining sector, in order to eliminate losses that cause low productivity, affecting the fulfillment of the production plan and customer satisfaction. The use of Lean methodology following the DMAIC stages allowed analyzing the factors that influence the line productivity loss. The major problems and causes that contribute to a reduction on productivity and that were identified in this study are the lack of standardization in the setup activities and the excessive stoppages for adjustment of the processes that caused an increase of defects. Control charts, Pareto analysis and cause-and-effect diagrams were used to analyze the problem. On the improvement stage, the changes were based on the reconfiguration of the line layout as well as the modernization of the process. Overall, the project justified an investment in new equipment, the defective product units were reduced by 84% and an increase of 29% of line capacity was noticed.
Resumo:
An empirical system was developed to obtain a quality index for rock slopes in road infrastructures, named Slope Quality Index (SQI), and it was applied to a set of real slopes.The SQI is supported in nine factors affecting slope stability that contemplate the evaluation of different parameters. Consequently, each factor is classified by the degree of importance and influence by assigned weights. These weights were established through a statistical analysis of replies to a survey that was distributed to several experienced professionals in the field. The proposed SQI varies between1 and 5, corresponding to slopes in very good and very bad condition state, respectively. Besides the advantage linked to a quantitative and qualitative evaluation of slopes, theSQI also allows identifying the most critical factors on the slope stability, which is a fundamental issue for an efficient management of the slope network in the road infrastructure, namely in the planning of conservation and maintenance operations.
Resumo:
This paper aims to approach the urban transformation processes occurring in the city of Braga between Late Antiquity and the fourteenth-fifteenth centuries. Our approach is based upon the cross-referencing of documental, iconographic and cartographic data with data emerging from archaeological works conducted across the city throughout the last two decades. Despite the scarcity in sources documenting the historical period under study, a similar circumstance registered in other western European cities, new and emerging archaeological data associated with a regressive analysis of available information for the forthcoming centuries —documents, maps, plans and illustrations, have been contributing towards an advance in the overall knowledge regarding the continuity and changing processes impacting upon the urban area of Braga. Thereby, our goal is to develop a synthesis work describing the major evolutionary stages happening in Braga from the fifth to the fifteenth centuries and based upon anintegrated analysis of the architectonic markers, the morphology present in the urban setting, the existing Christian topography, the defensive system and the main road network.
Resumo:
The International Energy Agency established an Implementing Agreement within the Energy in Buildings and Communities Program to undertake research and provide an international focus on Cost Effective Energy and Carbon Emissions Optimization in Building Renovation (EBC Annex 56). The project aims at developing a new methodology to enable cost effective renovation of existing buildings while optimizing energy consumption and carbon emissions reduction. Gathering of case studies is one of the activities undertaken to reach the overall project. Of the case studies a selection of â Shining Examplesâ is made to encourage decision makers to promote efficient and cost effective renovations. This paper presents the results of the analyses made on the Shining Examples.
Resumo:
Risk management is an important component of project management. Nevertheless, such process begins with risk assessment and evaluation. In this research project, a detailed analysis of the methodologies used to treat risks in investment projects adopted by the Banco da Amazonia S.A. was made. Investment projects submitted to the FNO (Constitutional Fund for Financing the North) during 2011 and 2012 were considered for that purpose. It was found that the evaluators of this credit institution use multiple indicators for risk assessment which assume a central role in terms of decision-making and contribute for the approval or the rejection of the submitted projects; namely, the proven ability to pay, the financial records of project promotors, several financial restrictions, level of equity, level of financial indebtedness, evidence of the existence of a consumer market, the proven experience of the partners/owners in the business, environmental aspects, etc. Furthermore, the bank has technological systems to support the risk assessment process, an internal communication system and a unique system for the management of operational risk.
Resumo:
Project Management involves onetime endeavors that demand for getting it right the first time. On the other hand, project scheduling, being one of the most modeled project management process stages, still faces a wide gap from theory to practice. Demanding computational models and their consequent call for simplification, divert the implementation of such models in project management tools from the actual day to day project management process. Special focus is being made to the robustness of the generated project schedules facing the omnipresence of uncertainty. An "easy" way out is to add, more or less cleverly calculated, time buffers that always result in project duration increase and correspondingly, in cost. A better approach to deal with uncertainty seems to be to explore slack that might be present in a given project schedule, a fortiori when a non-optimal schedule is used. The combination of such approach to recent advances in modeling resource allocation and scheduling techniques to cope with the increasing flexibility in resources, as can be expressed in "Flexible Resource Constraint Project Scheduling Problem" (FRCPSP) formulations, should be a promising line of research to generate more adequate project management tools. In reality, this approach has been frequently used, by project managers in an ad-hoc way.
Resumo:
The authors propose a mathematical model to minimize the project total cost where there are multiple resources constrained by maximum availability. They assume the resources as renewable and the activities can use any subset of resources requiring any quantity from a limited real interval. The stochastic nature is inferred by means of a stochastic work content defined per resource within an activity and following a known distribution and the total cost is the sum of the resource allocation cost with the tardiness cost or earliness bonus in case the project finishes after or before the due date, respectively. The model was computationally implemented relying upon an interchange of two global optimization metaheuristics – the electromagnetism-like mechanism and the evolutionary strategies. Two experiments were conducted testing the implementation to projects with single and multiple resources, and with or without maximum availability constraints. The set of collected results shows good behavior in general and provide a tool to further assist project manager decision making in the planning phase.
Resumo:
Increasing the maturity in Project Management (PM) has become a goal for many organizations, leading them to adopt maturity models to assess the current state of its PM practices and compare them with the best practices in the industry where the organization is inserted. One of the main PM maturity models is the Organizational Project Management Maturity Model (OPM3®), developed by the Project Management Institute. This paper presents the Information Systems and Technologies organizations outcome analysis, of the assesses made by the OPM3® Portugal Project, identifying the PM processes that are “best” implemented in this particular industry and those in which it is urgent to improve. Additionally, a comparison between the different organizations’ size analyzed is presented.
Resumo:
[Excerpt] The idea of community is usually associated with radio today in the context of what Bart Cammaerts (2009,635) classifies as a "third type of broadcast, namely participatory radio, complementary to both commercial and public media". Following Ellie Rennie (2006, 3), community radio corresponds, as all other forms of community media, to non-profit media that provide "community members with an opportunity to participate in the production process". For the International Association for Media and Communication Research, which supports a research group on Community Communication, this area includes media that originate from, circulate and resonate with the sphere of civil society.