558 resultados para hydroelectric megaprojects
Resumo:
In northwestern Sao Paulo State, it was established, in 1965, the hydroelectric station of Ilha Solteira (CESP) that produced extensive degraded areas, from where it was removed the soil superficial layers. For the re-establishment of the vegetation, in areas like these, it is necessary the addition of chemical inputs and organic material. Associating the presence in the area of macrophytes, to the need of recovery of degraded areas and the availability of seeds from native species of Cerrado, it was intended the development of this work, with the objective of evaluating the addition effects of organic residue and phosphorus on the material of degraded soil and on the initial growth of Dipteryx alata, arboreal species of 'cerrado'. The soil material was collected in area of degraded soil by the construction of Ilha Solteira hydroelectric station. The experiment was conducted in two environmental conditions, greenhouse and plenty of sun. The treatments consisted of four phosphorus doses (0, 100, 200 and 300 mg dm(-3) of P2O5), with or without macrophytes addition, with 16 treatments and 10 repetitions each one. The used macrophytes, collected at Jupia hydroelectric station, in Mato Grosso do Sul state, were dried, sliced, incorporated to the soil material and incubated during 60 days. The seeds of Dipteryx alata, collected around of the area, were sowed in washed sand and after 60 days introduced in the treatments. The plants were appraised monthly for height, stem diameter and leaves chlorophyll. After 210 days, the plants were collected and evaluated for fresh and dry weight of aerial part and radicular system and the soil material was evaluated for fertility and microbial activity by the carbon of liberated CO2. The organic residue, incorporated to the material of soil degraded, positively affects the soil fertility and the soil microbial activity. The applied phosphorus doses influenced the behavior of Ca, SB, H+Al and CTC, when applied in the absence of organic residue, it promoted significant and linear increments for values of potential acidity, and indicated the organic residue importance. The initial growth of the Dipteryx alata was favored by the protected cultivation, for the incorporation of organic residue and for the phosphorus addition to the soil. At the end although the material of degraded soil comes as good perspective for disposal of this residue, studies about the field conditions are necessary.
Resumo:
The Companhia Energetica de Sao Paulo - CESP owns six hydroelectric dams in the state of São Paulo. The dams, both in its construction and in operation, cause some environmental impacts, most of them negatives, for example, the flooding in regions before not flooded, deviation of the river’s course, among others, bringing harm to flora and fauna of these environments. As a way to compensating these damages, the CESP has acquired a region that was influenced by Sérgio Motta Hydroelectric Plant Engineer, or Porto Primavera, and turned it into Reserva Particular do Patrimônio Natural Foz do Rio Aguapeí. By law it fits in a Conservation Unit, and thus should be contemplate for a management plan, ie, a multidisciplinary technical document which allows, simply, the practice of actions within and around in a sustainably way. This work aimed at developing a land cover map of the reserve for this plan can be made and executed more efficiently. Initially, the project included field visits and meetings with members of the CESP to be specified classes contained on the map. Later, we ran different types of classifications of multispectral images (TM / Landsat 5)... (Complete abstract click electronic access below)
Comissionamento de turbinas hidráulicas: ensaios de faixa operativa, índex, test e rejeição de carga
Resumo:
With growing electricty demand, the importance of generation through hydropower, a renewable energy source, it’s of great importance. This demand derives from the country’s growth, as well as events that will occur in the coming years. The commission has a crucial role before the entry into operation of hydroelectric plant, sice, ensures a good operation of hydraulic and electrical systems, as well as the safety of the installation. This paper is a case study, commissioning in a PCH in especially the most important tests, such as range operation, índex tes and load rejection. In these trials we can get a Idea of the actual behavior of the unit, as well as future operation maneuvers, and evidence of real efficiency
Resumo:
não disponível
Resumo:
Brazil economic growth has to predict the need for implementation of new energy sources to ensure the continuity of the economic growth and improvement of life of the brazilian population. Until this moment, this assistance included the construction of large hydroelectric plants, mainly in the amazon region, where the environmental impact is difficult or, as in the case of the Belo Monte made this impossible so far, the implementation of these projects. In this work is conducted a study that demonstrates an example of application of wind energy, through an assessment of wind resources in the brazilian Northeast for the implementation of a wind farm
Resumo:
The crescent increasing demand of the electric power in Brazil has stimulated the implantation of Small Central Hydroelectric Power (SCHP) in several regions of the country. However, the silting up of the reservoirs is one of the main problems faced by hydroelectric power plants and SCHP. In this context, this research aimed evaluate the phenomenology and propose the enforcement of appropriate bioengineering techniques to control the intense erosive process of the hydrographical basin of the “Alto Rio Sucuriú,” that cause silting up of the reservoirs of the SCHP Costa Rica, located in the municipal district of Costa Rica (MS). In order to identify the phenomenology of the main falling in of this basin, a diagnosis of the conditions of the physical environment of the region (climate, geology, pedology, hydrology, and use of the ground) was realized. A surveying was also realized to specify the geometric feature of the falling in using the Total Station of the Ruide brand, series RTS 860R and the geodetic GPS of the Ashtech brand and the data obtained was used on the preparation of the Digital Elevation Model (DEM) of the falling in. Based on this diagnosis an official register of the falling in was done with identification of the different types of present erosion. Due to the advanced erosive stage of the falling in researched, the use of bioengineering techniques could be the best solution considering that the traditional engineering techniques make use of heavy material like concrete, iron and large machines that besides causing higher impact to the natural and esthetic aspects of the environment also require a higher investment of capital. This research establish a great cooperation to the knowledge of the erosive process and of the rehabilitation of the degraded areas with application of bioengineering techniques not only hydrographical basin of “Alto Rio Sucuriú” but also to other basins that show similar situation
Resumo:
The mathematical models are critical to determine theoretical prices of options and analyze whether they are overrated or underrated. This information strongly influence in operations carried out by the investor. Therefore, it is necessary that the employee model present high degree of reliability and be consistent with the reality of investment to which it is intended. In this sense, this dissertation aims to apply the steps of mathematical modeling in the Pricing of options for decision making in the investment of a hydroelectric power plant. Was used a Monte Carlo simulation, with the Latin Hypercube Method, to determine the volatility of returns of the project. In order to validate the proposed model, compared to the results found by the Binomial Model, which is one of the models most used in this type of investment. The results reinforce the hypothesis that the mathematical modeling with the Binomial Model is critical to investment decision-making in hydroelectric power
Resumo:
In Brazil, The power generation has always depended on the rivers, in other words, there are moments that the power generation can vary, which can cause variations in energy supply and even blackout according to the level of water in the reservoirs of the hydroelectric plants. For this reason, many options has been studied, like our example, which is about a combined cycle power plant in Canas. The use of combined cycle is interesting from the point o view of energy, because its efficiency is between 50 and 60%, and from the point of view of environment, because it can burn natural gas, which is cleaner than coal, it reduces the emission of gases that influence on the greenhouse effect. This work aims to perform a technical analysis of a case study of a power plant proposed to be built in Canas by the AES/AES Tietê Group. For the analysis will be used the commercial software GateCycle 6.0.0 from GE, this software has the power of simulating power generation cycles (nuclear, combined, etc.). The energy department of UNESP has the license, which makes possible the academic use of this tool. Two combined cycles were simulated, one using one pressure level HRSG, and another one closer to the real power plant, which is a combined cycle with a three pressure level HRSG. The results were close to expected, for the combined cycle with one pressure HRSG the power was 513,9 MW and a efficiency of 53,27%, in the case with the three pressure level HRSG the power was 517,1 MW and a efficiency of 53,5%. We conclude that the software requires that the user must have the knowledge about the subjects involved in the use of GateCycle in problems resolutions
Resumo:
Pós-graduação em Engenharia Mecânica - FEG
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
The objective of this work is to study the implantation feasibility of a small hydropower system in a rural area in Guaratinguetá. Due to its location and accessibility, and the costs involved in extending the public distribution line to the property it could turn become viable the construction of an individual electric generation system. As alternatives, a solar photovoltaic system and combustion engine-electric generator systems were considered. However, the existence of a small river inside the property, the construction of a micro hydropower plant was taken into account. The choice of the micro power hydropower plant was determined by the owner and was based on the costs. The topographic and hydrological profiles as well as the geometrical characteristics of the system, including the civil infrastructure needed and the more adequate turbine, were determined. Finally, the cost spreadsheet was set and the results were compared with those calculated for the extension of the available public distribution system
Resumo:
Introduces technical, economic and environmentally competitive solutions in the energy market is a great challenge for society. This work examines each of these aspects considering the production of electrolytic hydrogen with energy from wind power, solar and hydropower, in order to ensure an overview of this energy carrier. Initially, an assessment of the technical aspects is made addressing existing electrolysers technologies, its main characteristics and differences. The geographical distribution of wind, solar and hydroelectric potential in Brazil is also mapped, and a configuration scheme of a hydrogen production system is discussed. Subsequently, the economic analysis calculates the cost of investment in the alkaline electrolyser of 60 Nm³ / h, similar to the Brazilian bus powered by hydrogen project, coordinated by EMTU. Since the main input of electrolysis is electricity, is analyzed the latest energy auctions of each primary source and it is calculated the cost of production of the wind, solar and hydropower hydrogen. Postponed to this, are investigated the intrinsic environmental impacts of electricity generation process, proposing a readjustment of an indicator of ecological efficiency for the production of hydrogen. Finally, the work discusses the concept of externalities and demonstrates how the incorporation of external costs can leverage the hydrogen economy. In short, it is evident that the wind and hydroelectric hydrogens are more promising compared to solar hydrogen, whether in the economic aspect, because it achieved lower costs, whether in the environmental aspect, because it reached the highest ecological efficiency
Resumo:
Pós-graduação em Engenharia Mecânica - FEIS
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)