931 resultados para highway operating contracts
Resumo:
Man’s never-ending search for better materials and construction methods and for techniques of analysis and design has overcome most of the early difficulties of bridge building. Scour of the stream bed, however, has remained a major cause of bridge failures ever since man learned to place piers and abutments in the stream in order to cross wide rivers. Considering the overall complexity of field conditions, it is not surprising that no generally accepted principles (not even rules of thumb) for the prediction of scour around bridge piers and abutments have evolved from field experience alone. The flow of individual streams exhibits a manifold variation, and great disparity exists among different rivers. The alignment, cross section, discharge, and slope of a stream must all be correlated with the scour phenomenon, and this in turn must be correlated with the characteristics of the bed material ranging from clays and fine silts to gravels and boulders. Finally, the effect of the shape of the obstruction itself-the pier or abutment-must be assessed. Since several of these factors are likely to vary with time to some degree, and since the scour phenomenon as well is inherently unsteady, sorting out the influence of each of the various factors is virtually impossible from field evidence alone. The experimental approach was chosen as the investigative method for this study, but with due recognition of the importance of field measurements and with the realization that the results must be interpreted so as to be compatible with the present-day theories of fluid mechanics and sediment transportation. This approach was chosen because, on the one hand, the factors affecting the scour phenomenon can be controlled in the laboratory to an extent that is not possible in the field, and, on the other hand, the model technique can be used to circumvent the present inadequate understanding of the phenomenon of the movement of sediment by flowing water. In order to obtain optimum results from the laboratory study, the program was arranged at the outset to include a related set of variables in each of several phases into which the whole problem was divided. The phases thus selected were : 1. Geometry of piers and abutments, 2. Hydraulics of the stream, 3. Characteristics of the sediment, 4. Geometry of channel shape and alignment.
Resumo:
In the preparation of this compilation of drainage laws of Iowa, an attempt has been made to include those sections of the Code to which reference is frequently required by the State Highway Commission, Boards of Supervisors and County Engineers in the conduct of highway and road administration as it is affected by the Iowa drainage laws. Of necessity some Code provisions which have a bearing on the principal subject were omitted. Enactments of the 56th General Assembly which modify existing code sections have been included as part of the regular text of the Code sections included in this publication. THE USER IS CAUTIONED THAT THESE CODE SECTIONS, AS MODIFIED BY THE 56th GENERAL ASSEMBLY, ARE NOT A PART OF THE 1954 CODE OF IOWA AND ARE OFFICIAL ONLY INSOFAR AS THEY ARE PRINTED IN THE OFFICIAL PUBLICATION ACTS OF THE 56TH GENERAL ASSEMBLY. SINCE THE 57TH GENERAL ASSEMBLY IS IN SESSION DURING THE PRINTING OF THIS PUBLICATION, ENACTMENTS OF THAT BODY WHICH AMEND OR REPEAL SECTIONS SET OUT HEREIN ARE INCLUDED IN THE BACK OF THIS VOLUME ON THE PINK-COLORED PAPER. THE USER IS CAUTIONED IN USING THIS VOLUME TO REFER TO THE TABLE OF SECTIONS REPEALED OR AMENDED, ON THE PINK-COLORED PAPER AT THE BACK OF THIS VOLUME. This publication is offered with the hope and belief that it will prove to be of value and assistance to those concerned with the problems of administering a highway, road and drainage system.
Resumo:
The Iowa Department of Natural Resources uses benthic macroinvertebrate and fish sampling data to assess stream biological condition and the support status of designated aquatic life uses (Wilton 2004; IDNR 2013). Stream physical habitat data assist with the interpretation of biological sampling results by quantifying important physical characteristics that influence a stream’s ability to support a healthy aquatic community (Heitke et al., 2006; Rowe et al. 2009; Sindt et al., 2012). This document describes aquatic community sampling and physical habitat assessment procedures currently followed in the Iowa stream biological assessment program. Standardized biological sampling and physical habitat assessment procedures were first established following a pilot sampling study in 1994 (IDNR 1994a, 1994b). The procedure documents were last updated in 2001 (IDNR 2001a; 2001b). The biological sampling and physical habitat assessment procedures described below are evaluated on a continual basis. Revision of this working document will occur periodically to reflect additional changes.
Resumo:
This report concerns a proposed Parkway and Scenic Highway along both sides of the Missouri River in Harrison, Pottawattamie and Mills County in Iowa and Washington, Douglas and Sarpy Counties in Nebraska. This Parkway will make the Missouri River valley accessible to the public, link existing and planned attractions and facilitate planned development while at the same time preserving for posterity the best of the natural attributes of the area.
Resumo:
Introduction: As part of the roadside development along the Interstate Highway System, the Iowa State Highway Commission has constructed eight pair of rest area facilities. Furthermore, two pair are presently under construction with an additional two pair proposed for letting in 1967. An additional nine and one-half pairs of rest areas are in the planning phase, a grand total of 45 rest Brea buildings. The facilities existing were planned and designed in a relatively short period of time. The rest area facilities are unusual in terms of water use, water demand rates, and the fact that there are no applicable guidelines from previous installations. Such facilities are a pioneering effort to furnish a service -which the travelling public desires and will use. The acceptance and current use of the existing facilities shows that the rest areas do provide a service the public will use and appreciate. The Iowa State Highway Commission is to be congratulated for this· pioneering effort. However there are problems, as should be expected when design of a new type of facility has no past operating experience to use as a guide. Another factor which enters is that a rest area facility is quite different and rather unrelated to engineering in the highway field of practice. Basically, the problems encountered can be resolved into several areas, namely 1) maintenance problems in equipment due to 2) insufficient capacity of several other elements of the water systems, and 3) no provisions for water quality control. This study and report is supposed to essentially cover the review of the rest areas, either existing and under construction or letting. However, the approach used has been somewhat different. Several basic economically feasible water system schemes have been developed which are· adaptable to the different well capacities and different water qualities encountered. These basic designs are used as a guide in recommending modifications to the existing rest area water systems, anticipating that the basic designs will be used for future facilities. The magnitude of the problems involved is shown by the fact that the projected water use and demand variations of each rest area building is equivalent to the water supply for a community of about 100 people. The problems of proper operation and maintenance of an eventual thirty to forty-five such facilities are gigantic. For successful operation the rest area water systems must have a high degree of standardization and interchangeability of all elements of the water systems, even if it means a limited degree of over-design in some rest area facilities.
Resumo:
3D engineered modeling is a relatively new and developing technology that can provide numerous benefits to owners, engineers, contractors, and the general public. This manual is for highway agencies that are considering or are in the process of switching from 2D plan sets to 3D engineered models in their highway construction projects. It will discuss some of the benefits, applications, limitations, and implementation considerations for 3D engineered models used for survey, design, and construction. Note that is not intended to cover all eventualities in all states regarding the deployment of 3D engineered models for highway construction. Rather, it describes how one state—Iowa—uses 3D engineered models for construction of highway projects, from planning and surveying through design and construction.
Resumo:
US Geological Survey (USGS) based elevation data are the most commonly used data source for highway hydraulic analysis; however, due to the vertical accuracy of USGS-based elevation data, USGS data may be too “coarse” to adequately describe surface profiles of watershed areas or drainage patterns. Additionally hydraulic design requires delineation of much smaller drainage areas (watersheds) than other hydrologic applications, such as environmental, ecological, and water resource management. This research study investigated whether higher resolution LIDAR based surface models would provide better delineation of watersheds and drainage patterns as compared to surface models created from standard USGS-based elevation data. Differences in runoff values were the metric used to compare the data sets. The two data sets were compared for a pilot study area along the Iowa 1 corridor between Iowa City and Mount Vernon. Given the limited breadth of the analysis corridor, areas of particular emphasis were the location of drainage area boundaries and flow patterns parallel to and intersecting the road cross section. Traditional highway hydrology does not appear to be significantly impacted, or benefited, by the increased terrain detail that LIDAR provided for the study area. In fact, hydrologic outputs, such as streams and watersheds, may be too sensitive to the increased horizontal resolution and/or errors in the data set. However, a true comparison of LIDAR and USGS-based data sets of equal size and encompassing entire drainage areas could not be performed in this study. Differences may also result in areas with much steeper slopes or significant changes in terrain. LIDAR may provide possibly valuable detail in areas of modified terrain, such as roads. Better representations of channel and terrain detail in the vicinity of the roadway may be useful in modeling problem drainage areas and evaluating structural surety during and after significant storm events. Furthermore, LIDAR may be used to verify the intended/expected drainage patterns at newly constructed highways. LIDAR will likely provide the greatest benefit for highway projects in flood plains and areas with relatively flat terrain where slight changes in terrain may have a significant impact on drainage patterns.
Resumo:
The main objective of this study was to utilize light detection and ranging (LIDAR) technology to obtain highway safety-related information. The safety needs of older drivers in terms of prolonged reaction times were taken into consideration. The tasks undertaken in this study were (1) identification of crashes that older drivers are more likely to be involved in, (2) identification of highway geometric features that are important in such crashes, (3) utilization of LIDAR data for obtaining information on the identified highway geometric features, and (4) assessment of the feasibility of using LIDAR data for such applications. A review of previous research indicated that older drivers have difficulty negotiating intersections, and it was recognized that intersection sight triangles were critical to safe intersection negotiation. LIDAR data were utilized to obtain information on potential sight distance obstructions at six selected intersections located on the Iowa Highway 1 corridor by conducting in-office line-of-sight analysis. Crash frequency, older driver involvement, and data availability were considerations in the selection of the six intersections. Results of the in-office analysis were then validated by visiting the intersections in the field. Sixty-six potential sight distance obstructions were identified by the line-of-sight analysis, out of which 62 (89.8%) were confirmed while four (5.8%) were not confirmed by the video. At least three (4.4%) potential sight distance obstructions were discovered in the video that were not detected by the line-of-sight analysis. The intersection with the highest crash frequency involving older drivers was correctly found to have obstructions located within the intersection sight triangles. Based on research results, it is concluded that LIDAR data can be utilized for identifying potential sight distance obstructions at intersections. The safety of older drivers can be enhanced by locating and rectifying intersections with obstructions in sight triangles.
Resumo:
The Federal Highway Administration published the final rule updating 23 CFR 630 Subpart J in September 2004. The revised rule requires agencies using federal funding to address both safety and mobility in planning and construction of roadway improvements. The Iowa Department of Transportation (Iowa DOT) requested the assistance of the Center for Transportation and Research in developing guidance for a policy and procedures to comply with the final rule. This report describes an in-depth examination of current Iowa DOT project development processes for all types of improvements, including maintenance, as well as a detailed characterization of work zone impact considerations throughout project completion. To comply with both the letter and perceived intent of the final rule on safety and mobility, the report features a suggested work zone policy statement and suggested revisions in the Iowa DOT project development processes, including a definition of the key element: significant projects.
Resumo:
For several years, the Iowa Department of Transportation has constructed bypasses along rural highways. Most bypasses were constructed on the state’s Commercial Industrial Network (CIN). Now that work on the CIN has been completed and the system is open to traffic, it is possible to study the impacts of bypasses. In the past, construction of highway bypasses has led community residents and business people to raise concerns about the loss of business activity. For policy development purposes, it is essential to understand the impacts that a bypass might have on safety, the community, and economics. By researching these impacts, policies can be produced to help to alleviate any negative impacts and create a better system that is ultimately more cost-effective. This study found that the use of trade area analysis does not provide proof that a bypass can positively or negatively impact the economy of a rural community. The analysis did show that, even though the population of a community may be stable for several years and per capita income is increasing, sales leakage still occurs. The literature, site visits, and data make it is apparent that a bypass can positively affect a community. Some conditions that would need to exist in order to maximize a positive impact include the installation of signage along the bypass directing travelers to businesses and services in the community, community or regional plans that include the bypass in future land development scenarios, and businesses adjusting their business plans to attract bypass users. In addition, how proactive a community is in adapting to the bypass will determine the kinds of effects felt in the community. Results of statistical safety analysis indicate that, at least when crashes are separated by severity, bypasses with at-grade accesses appear to perform more poorly than either the bypasses with fully separated accesses or with a mix of at-grade and fully separated accesses. However, the benefit in terms of improved safety of bypasses with fully separated accesses relative to bypasses with a mixed type of accesses is not statistically conclusive.
Resumo:
Adverse weather conditions dramatically affect the nation’s surface transportation system. The development of a prototype winter Maintenance Decision Support System (MDSS) is part of the Federal Highway Administration’s effort to produce a prototype tool for decision support to winter road maintenance managers to help make the highways safer for the traveling public. The MDSS is based on leading diagnostic and prognostic weather research capabilities and road condition algorithms, which are being developed at national research centers. In 2003, the Iowa Department of Transportation was chosen as a field test bed for the continuing development of this important research program. The Center for Transportation Research and Education assisted the Iowa Department of Transportation by collecting and analyzing surface condition data. The Federal Highway Administration also selected five national research centers to participate in the development of the prototype MDSS. It is anticipated that components of the prototype MDSS system developed by this project will ultimately be deployed by road operating agencies, including state departments of transportation, and generally supplied by private vendors.
Resumo:
This report documents Phase III of a four-phase project. The goals of the project are to study the feasibility of using advanced technology from other industries to improve he efficiency and safety of winter highway maintenance vehicle operations, and to provide travelers with the level of service defined by policy during the winter season at the least cost to the taxpayers. The results of the first phase of the research were documented in the Concept Highway Maintenance Vehicle Final Report: Phase One dated April 1997, which describes the desirable functions of a concept maintenance vehicle and evaluates its feasibility. Phase I concluded by establishing the technologies that would be assembled and tested on the prototype vehicles in Phase II. The primary goals of phase II were to install the selected technologies on the prototype winter maintenance vehicles and to conduct proof of concept in advance of field evaluations planned for Phase III. This Phase III final report documents the work completed since the end of Phase II. During this time period, the Phase III work plan was completed and the redesigned friction meter was field tested. A vendor meeting was held to discuss future private sector participation and the new design for the Iowa vehicle. In addition, weather and roadway condition data were collected from the roadway weather information systems at selected sites in Iowa and Minnesota, for comparison to the vehicles' onboard temperature sensors. Furthermore, the team received new technology, such as the mobile Frensor unit, for bench testing and later installation.
Resumo:
Few topics in transportation are of greater significance, now and in the future, than making today’s roads safe for those who use them. This study aims to assist the formulation of policy by examining the empirical evidence currently available on the ability of several forms of communication efforts and activities to increase knowledge about and affect attitudes and behavior toward highway safety practices. The objective of this effort is to provide a comparative synthesis of what works and what does not in highway safety campaigns across a large number of topical areas that have a mass media component. This was accomplished by conducting an extensive literature review to determine the current state of knowledge concerning what works and what has significant potential for wide use in future highway safety campaigns. An analytic framework for investigating highway safety campaigns was created. The framework includes (1) the types of media components, (2) the types of collaborations, (3) the context in which the campaign is intended to have impact, (4) the structure or procedural steps into which campaigns are organized, (5) the principles for what works in a campaign, and (6) the desired impact of a campaign on its target audience. The report reveals 25 characteristics of successful communication campaigns, strategies that stand a chance of achieving changes in knowledge, attitude, and behavior. The actual impact of mass communication remains unproven because of a perceived lag in the development of adequate evaluation techniques. Education by itself has not generally resulted in significant changes in the behaviors targeted, but education of the public and advocacy groups has often helped enact necessary legislation, transmit knowledge about the provisions and penalties of laws in ways that increase their deterrent effect, and generate public support for law enforcement programs. Even in such cases, however, when enforcement is inconsistent, public compliance frequently decreases with time. Approaches to traffic safety that emphasize the need for long-term individual- and community-based measures are found to be especially crucial for addressing complex problems like drinking and driving that are determined by a myriad of lifestyle and psychosocial factors.
Resumo:
This report describes the highway construction program, actual expenditures of the program and contractual obligations of the program for FY 2015.
Resumo:
This report, entitled Iowa Highway Research and Development Activities FY 2015, is submitted in compliance with Iowa Code section 310.36 and 312.3A, which direct the submission of a report of the Secondary Road Research Fund and the Street Research Fund, respectively. It is a report of the status of research and development projects in process on June 30, 2015. It is also a report on projects completed during the fiscal year beginning July 1, 2014 and ending June 30, 2015. Detailed information on each of the research and development projects mentioned in this report is available from the office of Research and Analytics, Performance and Technology Division, Iowa Department of Transportation. All approved reports are also online for viewing at http://www.iowadot.gov/research/pdf/IHRBAnnualReport.pdf.