952 resultados para U. maydis


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The 1935 Iowa-Illinois Memorial Bridge is being documented at this time to fulfill the requirements of the Memorandum of Agreement regarding the removal of the Iowa-Illinois Memorial Bridge and the Iowana Farms Milk Company Building for the proposed improvements to Interstate 7 4 in Bettendorf, Iowa, and Moline, Illinois.1 The 1959 twin suspension bridge will be removed as well, but it was determined to be ineligible for the National Register of Historic Places. Discussion of the history of the 1959 twin span is included, however, in the current report as part of the overall history of the Iowa-Illinois Memorial Bridge. Fieldwork for the documentation occurred in November 2009 and October 2010 (Fig. 1). Limitations on photography included limited shoreline access on the Illinois side, making good views of the bridge from the south somewhat challenging. Also, photographs on the bridge deck were not possible because of interstate traffic and prohibitions on pedestrian traffic. Within the last few years, online primary sources have proliferated, along with historical materials regarding the Iowa-Illinois Memorial Bridge. Sources available online for this report included numerous historical photographs, as well as historical Davenport, Iowa, and U.S. newspapers that document the bridge planning and construction. Additional primary source material was found at the University of Iowa Libraries, the State Historical Society of Iowa in Iowa City, the Bettendorf Public Library, the Richardson-Sloane Special Collections Center at the Davenport Public Library, and the Iowa State University Special Collections in Ames.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Center for Transportation Research and Education (CTRE) used the traffic simulation model CORSIM to access proposed capacity and safety improvement strategies for the U.S. 61 corridor through Burlington, Iowa. The comparison between the base and alternative models allow for evaluation of the traffic flow performance under the existing conditions as well as other design scenarios. The models also provide visualization of performance for interpretation by technical staff, public policy makers, and the public. The objectives of this project are to evaluate the use of traffic simulation models for future use by the Iowa Department of Transportation (DOT) and to develop procedures for employing simulation modeling to conduct the analysis of alternative designs. This report presents both the findings of the U.S. 61 evaluation and an overview of model development procedures. The first part of the report includes the simulation modeling development procedures. The simulation analysis is illustrated through the Burlington U.S. 61 corridor case study application. Part I is not intended to be a user manual but simply introductory guidelines for traffic simulation modeling. Part II of the report evaluates the proposed improvement concepts in a side by side comparison of the base and alternative models.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This document represents a substantial attempt to survey the literature of labor negotiations as it relates to the faculty in higher education.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Vertical Clearance Log is prepared for the purpose of providing vertical clearance restrictions by route on the primary road system. This report is used by the Iowa Department of Transportation’s Motor Carrier Services to route oversize vehicles around structures with vertical restrictions too low for the cargo height. The source of the data is the Geographic Information Management System (GIMS) that is managed by the Office of Research & Analytics in the Performance & Technology Division. The data is collected by inspection crews and through the use of LiDAR technology to reflect changes to structures on the primary road system. This log is produced annually.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Proposed Action consists of the improvement of Iowa Highway 58 (IA 58) from U.S. Highway 20 (U.S. 20) north to Greenhill Road in Cedar Falls (Black Hawk County, Iowa). The improvement would include limiting at-grade access to IA 58 by adding one or more interchanges to the corridor which would be located at Viking Road, Greenhill Road, and reconfiguring the U.S. 20 interchange (Figure 1). In order to construct these interchanges and associated ramps, the pavement of IA 58 would be reconstructed. In a couple of locations, the alignment of IA 58 would be shifted.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The proposed action consists of upgrading Mississippi Drive (Iowa Highway 92) through downtown Muscatine, Iowa. The Mississippi Drive Corridor Project begins south of the Main Street/Grandview Avenue intersection, continuing to the East 2nd Street/Norbert F. Beckey Bridge intersection, which marks the end of the project. It passes through a mix of commercial, residential, Central Business District and industrial land uses. The total length of the project is approximately 1.6 miles, including 19 intersections (6 with traffic signals). Refer to the vicinity map on Figure 1. The current roadway is a 3- to 4-lane, urban facility with both divided and undivided medians. The roadway, ranging from 40 to 64 feet wide, is considered difficult to cross for pedestrians, especially for small children or elderly. The width of this roadway is being considered to be narrowed to improve the accessibility to the downtown from the Mississippi River riverfront area by pedestrians. This project also includes accommodations for bicycles and pedestrians and measures to reduce flooding on the roadway.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

New geochronological data which clarify the timing of syn-orogenic magmatism and regional metamorphism in the Connemara Dalradian are presented. U-Pb zircon data on four intermediate to acid foliated magmatic rocks show important inherited components but the most concordant fractions demonstrate that major magmatism continued until 465 Ma whereas the earliest, basic magmatism has been dated previously at 490 Ma; a fine-grained, fabric-cutting granite contains discordant zircons which also appear to be 465 Ma old. Are magmatism in Connemara therefore spanned a period of at least 25 Ma. Recent U-Pb data on titanite from central Connemara which gave a peak metamorphic age of 478 Ma are supplemented by U-Pb data on titanite and monazite from metamorphic veins in the east of Connemara which indicate that low-P, high-T regional metamorphism ism continued there to 465 Ma, i.e. at least 10 Ma later than in the central region dated previously. New Rb-Sr data on muscovites from coarse-grained segregations in different structural settings range from 475 to 435 Ma; in part this range probably also reflects differences in age from west to east, with three ages close to 455 Ma from the eastern area, which is also the site of the lowest pressure metamorphism. Thermal modelling indicates that at any one locality the duration of metamorphism was probably as little as 1-2 Ma. The new dates emphasize the complexity in the spatial and temporal distribution of high-level regional metamorphism caused by magmatic activity. The relatively simple overall distribution of mineral-appearance isograds revealed by regional mapping masks the complexity of a prolonged but punctuated metamorphic history related to multiple intrusions, primarily in the southern part of Connemara. The later stages of magmatic activity followed progressive uplift and erosion after the onset of magmatism, and were localized in the eastern part of the region.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This project concept and assessment of impacts includes information on future four-lane construction of U.S. 151 from the existing four-lane section near Cedar Rapids to Dubuque.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Iowa Department of Transportation (Iowa DOT) has re-initiated planning and preliminary design studies to improve U.S. 61 from Memorial Park Road in Burlington north to 1-mile north of IA 78 in Louisa County. The proposed project consists of improving approximately 18 miles of roadway from 2-lanes to 4-lanes and evaluating a potential bypass around Mediapolis.