986 resultados para Thermal electric polarization
Resumo:
In this paper we present a Constraint Logic Programming (CLP) based model, and hybrid solving method for the Scheduling of Maintenance Activities in the Power Transmission Network. The model distinguishes from others not only because of its completeness but also by the way it models and solves the Electric Constraints. Specifically we present a efficient filtering algorithm for the Electrical Constraints. Furthermore, the solving method improves the pure CLP methods efficiency by integrating a type of Local Search technique with CLP. To test the approach we compare the method results with another method using a 24 bus network, which considerers 42 tasks and 24 maintenance periods.
Resumo:
This paper presents a simulator for electric vehicles in the context of smart grids and distribution networks. It aims to support network operator´s planning and operations but can be used by other entities for related studies. The paper describes the parameters supported by the current version of the Electric Vehicle Scenario Simulator (EVeSSi) tool and its current algorithm. EVeSSi enables the definition of electric vehicles scenarios on distribution networks using a built-in movement engine. The scenarios created with EVeSSi can be used by external tools (e.g., power flow) for specific analysis, for instance grid impacts. Two scenarios are briefly presented for illustration of the simulator capabilities.
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
Os objectivos principais deste estudo são a caracterização de uma das linhas de extrusão existentes na Cabelte, nomeadamente a linha de extrusão de referência EP5, composta por duas extrusoras. Pretende-se fazer a determinação de indicadores energéticos e de processo e a optimização do consumo energético, no que diz respeito à energia consumida e às perdas térmicas relativas a esta linha. Para fazer a monitorização da linha de extrusão EP5 foi colocado no quadro geral dessa linha um equipamento central de medida de forma a ser possível a sua monitorização. No entanto, para a extrusora auxiliar as medições foram efectuadas com uma pinça amperimétrica e um fasímetro. Foram também efectuados ensaios onde foi avaliada a quantidade de material transformada, para isso foi utilizado um equipamento de pesagem, doseador gravimétrico aplicado nas extrusoras. As medições de temperatura para os cálculos das perdas térmicas da extrusora principal e para a caracterização dos materiais plásticos, foram efectuadas utilizando um termómetro digital. Foram efectuados ensaios de débito às extrusoras auxiliar e principal e foi estudada a variação do factor de potência em função da rotação do fuso. Na perspectiva do utilizador final a optimização para a utilização racional de energia está na redução de encargos da factura de energia eléctrica. Essa factura não depende só da quantidade mas também do modo temporal como se utiliza essa energia, principalmente a energia eléctrica, bastante dependente do período em que é consumida. Uma metodologia diferente no planeamento da produção, contemplando o fabrico dos cabos com maior custo específico nas horas de menor custo energético, implicaria uma redução dos custos específicos de 18,7% para o horário de verão e de 20,4% para o horário de inverno. Os materiais de revestimento utilizados (PE e PVC), influenciam directamente os custos energéticos, uma vez que o polietileno (PE) apresenta sempre valores de entalpia superiores (0,317 kWh/kg e 0,281 kWh/kg)) e necessita de temperaturas de trabalho mais elevadas do que o policloreto de vinilo (PVC) (0,141 kWh/kg e 0,124 kWh/kg). O consumo específico tendencialmente diminui à medida que aumenta a rotação do fuso, até se atingir o valor de rotação óptimo, a partir do qual esta tendência se inverte. O cosφ para as duas extrusoras em estudo, aumenta sempre com o aumento de rotação do fuso. Este estudo permitiu avaliar as condições óptimas no processo de revestimento dos cabos, de forma a minimizarmos os consumos energéticos. A redução de toda a espécie de desperdícios (sobre consumos, desperdício em purgas) é uma prioridade de gestão que alia também a eficácia à eficiência, e constitui uma ferramenta fundamental para assegurar o futuro da empresa. O valor médio lido para o factor de potência (0,38) da linha EP5, valor extremamente baixo e que vem associado à energia reactiva, além do factor económico que lhe está inerente, condiciona futuras ampliações. A forma de se corrigir o factor de potência é instalando uma bateria de condensadores de 500 kVAr. Considerando o novo sistema tarifário aplicado à energia reactiva, vamos ter um ganho de 36167,4 Euro/ano e o período de retorno de investimento é de 0,37 ano (4,5 meses). Esta medida implica também uma redução anual na quantidade de CO2 emitida de 6,5%. A quantificação das perdas térmicas é importante, pois só desta forma se podem definir modos de actuação de forma a aumentar a eficiência energética. Se não existir conhecimento profundo dos processos e metodologias correctas, não podem existir soluções eficientes, logo é importante medir antes de avançar com qualquer medida de gestão.
Resumo:
Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia Mecânica
Resumo:
The introduction of electricity markets and integration of Distributed Generation (DG) have been influencing the power system’s structure change. Recently, the smart grid concept has been introduced, to guarantee a more efficient operation of the power system using the advantages of this new paradigm. Basically, a smart grid is a structure that integrates different players, considering constant communication between them to improve power system operation and management. One of the players revealing a big importance in this context is the Virtual Power Player (VPP). In the transportation sector the Electric Vehicle (EV) is arising as an alternative to conventional vehicles propel by fossil fuels. The power system can benefit from this massive introduction of EVs, taking advantage on EVs’ ability to connect to the electric network to charge, and on the future expectation of EVs ability to discharge to the network using the Vehicle-to-Grid (V2G) capacity. This thesis proposes alternative strategies to control these two EV modes with the objective of enhancing the management of the power system. Moreover, power system must ensure the trips of EVs that will be connected to the electric network. The EV user specifies a certain amount of energy that will be necessary to charge, in order to ensure the distance to travel. The introduction of EVs in the power system turns the Energy Resource Management (ERM) under a smart grid environment, into a complex problem that can take several minutes or hours to reach the optimal solution. Adequate optimization techniques are required to accommodate this kind of complexity while solving the ERM problem in a reasonable execution time. This thesis presents a tool that solves the ERM considering the intensive use of EVs in the smart grid context. The objective is to obtain the minimum cost of ERM considering: the operation cost of DG, the cost of the energy acquired to external suppliers, the EV users payments and remuneration and penalty costs. This tool is directed to VPPs that manage specific network areas, where a high penetration level of EVs is expected to be connected in these areas. The ERM is solved using two methodologies: the adaptation of a deterministic technique proposed in a previous work, and the adaptation of the Simulated Annealing (SA) technique. With the purpose of improving the SA performance for this case, three heuristics are additionally proposed, taking advantage on the particularities and specificities of an ERM with these characteristics. A set of case studies are presented in this thesis, considering a 32 bus distribution network and up to 3000 EVs. The first case study solves the scheduling without considering EVs, to be used as a reference case for comparisons with the proposed approaches. The second case study evaluates the complexity of the ERM with the integration of EVs. The third case study evaluates the performance of scheduling with different control modes for EVs. These control modes, combined with the proposed SA approach and with the developed heuristics, aim at improving the quality of the ERM, while reducing drastically its execution time. The proposed control modes are: uncoordinated charging, smart charging and V2G capability. The fourth and final case study presents the ERM approach applied to consecutive days.
Resumo:
Este trabalho teve como propósito fazer uma avaliação do desempenho energético e da qualidade do ar no interior das instalações de uma Piscina Municipal Coberta, localizada na zona norte de Portugal, sendo estabelecidos os seguintes objetivos: caracterização geral da piscina, no que respeita aos seus diferentes espaços e equipamentos, cálculo dos consumos térmicos e elétricos bem como o registo das concentrações de elementos poluentes para controlo da qualidade do ar no interior da piscina, tendo como base a legislação atualmente em vigor. A caracterização geral da piscina permitiu verificar algumas inconformidades como a temperatura da água nos tanques de natação que tem valores superiores aos recomendados e a sala de primeiros socorros que não possui acesso direto ao exterior. Acrescente-se que o pavimento nos chuveiros da casa de banho feminina e os valores de pH para água do tanque grande e pequeno não estão sempre dentro da gama de recomendação. O caudal da renovação de ar está a ser operado manualmente e quando está a funcionar a 50% da sua capacidade máxima, que acontece numa parte do dia, apenas consegue renovar 77,5% do caudal recomendado pelo RSECE. Para se obter o valor recomendado é necessário ter pelo menos 7 horas com o caudal a 100% da capacidade máxima. A avaria na UTA2 originou que 40% dos registos diários da humidade relativa interior estivessem fora da gama de valores recomendados e que esta é fortemente dependente da humidade no exterior e pode ser agravada quando as portas dos envidraçados da nave são abertas. Analisando ainda a quantidade de água removida na desumidificação do ar com a água evaporada em condições de Outono-Inverno ou Primavera-Verão, este estudo permitiu concluir que todas as combinações demonstraram a necessidade de desumidificação salvo a combinação Outono-Inverno e UTA2 a funcionar a 100% da sua capacidade máxima. Os isolamentos das tubagens na sala das caldeiras foram observados e comparados com as soluções recomendadas pelas empresas especialistas e verificou-se que alguns estão mal colocados com parcial ou total degradação, promovendo perdas térmicas. No caso das perdas calorificas por evaporação, estas representaram cerca de 67,78% das perdas totais. Como tal, estudou-se a aplicação de uma cobertura sobre o plano de água durante o período de inatividade da piscina (8 horas) e verificou-se que o resultado seria uma poupança de 654,8 kWh/dia, na ausência de evaporação da água, mais 88,00 kWh/dia do período da UTA2 a funcionar a 50% da sua capacidade, perfazendo um total de 742,8 kWh/dia. A aplicação da cobertura permite obter um VAL de valor positivo, uma TIR de 22,77% e sendo este valor superior ao WACC (Weight Average Cost of Capital), o projeto torna-se viável com um Pay-Back de 3,17 anos. Caracterizou-se também o consumo total diário em eletricidade, e verificou-se que as unidades de climatização, as bombas de circulação de água, a iluminação, e outros equipamentos representam, respetivamente, cerca de 67,81, 25,26, 2,68 e 3,91% da energia elétrica total consumida. Por fim, a análise à qualidade do ar no interior da nave em Maio e Setembro identificou que as concentrações de ozono apresentavam valores no limite do aceitável em Maio e superiores ao valor de emissão em Setembro. Os compostos orgânicos voláteis também apresentavam valores em Maio 4,98 vezes superior e em Setembro 6,87 vezes superior aos valores máximos exigidos pelo D.L. nº 79/2006. Houve ainda altas concentrações de radão registadas na casa dos filtros, em Maio com um valor 11,49 vezes superior, no entanto esse valor desceu em Setembro para 1,08 vezes, mesmo assim superior ao exigido pelo D.L. nº 79/2006.
Resumo:
Dissertação para obtenção do grau de Mestre em Engenharia Electrotécnica Ramo de Automação e Electrónica Industrial
Resumo:
To determine self-consistently the time evolution of particle size and their number density in situ multi-angle polarization-sensitive laser light scattering was used. Cross-polarization intensities (incident and scattered light intensities with opposite polarization) measured at 135 degrees and ex situ transmission electronic microscopy analysis demonstrate the existence of nonspherical agglomerates during the early phase of agglomeration. Later in the particle time development both techniques reveal spherical particles again. The presence of strong cross-polarization intensities is accompanied by low-frequency instabilities detected on the scattered light intensities and plasma emission. It is found that the particle radius and particle number density during the agglomeration phase can be well described by the Brownian free molecule coagulation model. Application of this neutral particle coagulation model is justified by calculation of the particle charge whereby it is shown that particles of a few tens of nanometer can be considered as neutral under our experimental conditions. The measured particle dispersion can be well described by a Brownian free molecule coagulation model including a log-normal particle size distribution. (C) 1996 American Institute of Physics.
Resumo:
Conferência: 2nd Experiment at International Conference - 18-20 September 2013
Resumo:
Dissertação para obtenção do grau de Mestre em Engenharia Electrotécnica Ramo de Energia
Resumo:
Trabalho Final de Mestrado para obtenção de grau de Mestre em Engenharia Mecânica
Resumo:
The economical and environment impacts of fossil energies increased the interest for hybrid, battery and fuel-cell electric vehicles. Several demanding engineering challenges must be faced, motivated by different physical domains integration. This paper aims to present an overview on hybrid (HEV) and electric vehicles (EV) basic structures and features. In addition, it will try to point out some of the most relevant challenges to overcome for HEV and EV may be a solid option for the mobility issue. New developments in energy storage devices and energy management systems (EMS) are crucial to achieve this goal.
Resumo:
This paper presents a distributed predictive control methodology for indoor thermal comfort that optimizes the consumption of a limited shared energy resource using an integrated demand-side management approach that involves a power price auction and an appliance loads allocation scheme. The control objective for each subsystem (house or building) aims to minimize the energy cost while maintaining the indoor temperature inside comfort limits. In a distributed coordinated multi-agent ecosystem, each house or building control agent achieves its objectives while sharing, among them, the available energy through the introduction of particular coupling constraints in their underlying optimization problem. Coordination is maintained by a daily green energy auction bring in a demand-side management approach. Also the implemented distributed MPC algorithm is described and validated with simulation studies.
Resumo:
The recent update of the R-Fieldbus testbed to the new Flexible Manufacturing Field Trial – FMFT – brought up the need for a complete revision of its electric schematic.This document comes as a sort of appendix to the Technical Report “Flexible Manufacturing Field Trial”, providing a reliable source of information about the FMFT electric schematic for further developments and/or maintenances.