Resumo:
Because of the importance and potential usefulness of construction market statistics to firms and government, consistency between different sources of data is examined with a view to building a predictive model of construction output using construction data alone. However, a comparison of Department of Trade and Industry (DTI) and Office for National Statistics (ONS) series shows that the correlation coefcient (used as a measure of consistency) of the DTI output and DTI orders data and the correlation coefficient of the DTI output and ONS output data are low. It is not possible to derive a predictive model of DTI output based on DTI orders data alone. The question arises whether or not an alternative independent source of data may be used to predict DTI output data. Independent data produced by Emap Glenigan (EG), based on planning applications, potentially offers such a source of information. The EG data records the value of planning applications and their planned start and finish dates. However, as this data is ex ante and is not correlated with DTI output it is not possible to use this data to describe the volume of actual construction output. Nor is it possible to use the EG planning data to predict DTI construc-tion orders data. Further consideration of the issues raised reveal that it is not practically possible to develop a consistent predictive model of construction output using construction statistics gathered at different stages in the development process.
Resumo:
Firms form consortia in order to win contracts. Once a project has been awarded to a consortium each member then concentrates on his or her own contract with the client. Therefore, consortia are marketing devices, which present the impression of teamworking, but the production process is just as fragmented as under conventional procurement methods. In this way, the consortium forms a barrier between the client and the actual construction production process. Firms form consortia, not as a simple development of normal ways of working, but because the circumstances for specific projects make it a necessary vehicle. These circumstances include projects that are too large or too complex to undertake alone or projects that require on-going services which cannot be provided by the individual firms inhouse. It is not a preferred way of working, because participants carry extra risk in the form of liability for the actions of their partners in the consortium. The behaviour of members of consortia is determined by their relative power, based on several factors, including financial commitment and ease of replacement. The level of supply chain visibility to the public sector client and to the industry is reduced by the existence of a consortium because the consortium forms an additional obstacle between the client and the firms undertaking the actual construction work. Supply chain visibility matters to the client who otherwise loses control over the process of construction or service provision, while remaining accountable for cost overruns. To overcome this separation there is a convincing argument in favour of adopting the approach put forward in the Project Partnering Contract 2000 (PPC2000) Agreement. Members of consortia do not necessarily go on to work in the same consortia again because members need to respond flexibly to opportunities as and when they arise. Decision-making processes within consortia tend to be on an ad hoc basis. Construction risk is taken by the contractor and the construction supply chain but the reputational risk is carried by all the firms associated with a consortium. There is a wide variation in the manner that consortia are formed, determined by the individual circumstances of each project; its requirements, size and complexity, and the attitude of individual project leaders. However, there are a number of close working relationships based on generic models of consortia-like arrangements for the purpose of building production, such as the Housing Corporation Guidance Notes and the PPC2000.
Resumo:
As a method of procuring the services of the built environment, performance-based contracting (PBC) seeks to link the building supplier to longer term commitments than has traditionally been the case in the construction sector. By rewarding the building producer according to the way that building or structure delivers the users' requirements, rather than according to a list of assembled parts, a number of additional risks are taken by contractors, including fitness for purpose, costs and briefing. The extent to which contractors recognize these risks and their methods of dealing with them vary considerably and are influenced by their attitudes towards risk. As the risks associated with PBC are seen as large, uninsurable, and vulnerable to changing client requirements, the majority of respondents would reject the use of PBC as a method of contracting. Nevertheless, PBC may be used under particular conditions, where rewards are deemed sufficient to compensate for the additional risk to the contractor of undertaking work on the basis of a stream of payments paid over the life of a structure depending on the satisfactory performance of the building or as part of a private finance initiative.
Resumo:
Building services are worth about 2% GDP and are essential for the effective and efficient operations of the building. It is increasingly recognised that the value of a building is related to the way it supports the client organisation’s ongoing business operations. Building services are central to the functional performance of buildings and provide the necessary conditions for health, well-being, safety and security of the occupants. They frequently comprise several technologically distinct sub-systems and their design and construction requires the involvement of numerous disciplines and trades. Designers and contractors working on the same project are frequently employed by different companies. Materials and equipment is supplied by a diverse range of manufacturers. Facilities managers are responsible for operation of the building service in use. The coordination between these participants is crucially important to achieve optimum performance, but too often is neglected. This leaves room for serious faults. The need for effective integration is important. Modern technology offers increasing opportunities for integrated personal-control systems for lighting, ventilation and security as well as interoperability between systems. Opportunities for a new mode of systems integration are provided by the emergence of PFI/PPP procurements frameworks. This paper attempts to establish how systems integration can be achieved in the process of designing, constructing and operating building services. The essence of the paper therefore is to envisage the emergent organisational responses to the realisation of building services as an interactive systems network.
Resumo:
Purpose – This paper proposes assessing the context within which integrated logistic support (ILS) can be implemented for whole life performance of building services systems. Design/methodology/approach – The use of ILS within a through-life business model (TLBM) is a better framework to achieve a well-designed, constructed and managed product. However, for ILS to be implemented in a TLBM for building services systems, the practices, tools and techniques need certain contextual prerequisites tailored to suit the construction industry. These contextual prerequisites are discussed. Findings – The case studies conducted reinforced the contextual importance of prime contracting, partnering and team collaboration for the application of ILS techniques. The lack of data was a major hindrance to the full realisation of ILS techniques within the case studies. Originality/value – The paper concludes with the recognition of the value of these contextual prerequisites for the use of ILS techniques within the building industry.
Inclusive environments and inclusive design: New dimensions and priorities for construction research
Resumo:
According to the Chinese State Council's "Building Energy Efficiency Management Ordinance", a large-scale investigation of energy efficiency (EE) in buildings in contemporary China has been carried out in 22 provincial capitals and major cities in China. The aim of this project is to provide reliable information for drawing up the "Decision on reinforcing building energy efficiency" by the Ministry of Construction of China. The surveyed organizations include government departments, research institutions, property developers, design institutions, construction companies, construction consultancy services companies, facility management departments, financial institutions and those which relate to the business of building energy efficiency. In addition, representatives of the media and residents were also involved. A detailed analysis of the results of the investigation concerning aspects of the cur-rent situation and trends in building energy consumption, energy efficiency strategy and the implementation of energy efficiency measures has been conducted. The investigation supplies essential information to formulate the market entrance policy for new buildings and the refurbishment policy for existing buildings to encourage the development of energy efficient technology.
Resumo:
The construction industry has incurred a considerable amount of waste as a result of poor logistics supply chain network management. Therefore, managing logistics in the construction industry is critical. An effective logistic system ensures delivery of the right products and services to the right players at the right time while minimising costs and rewarding all sectors based on value added to the supply chain. This paper reports on an on-going research study on the concept of context-aware services delivery in the construction project supply chain logistics. As part of the emerging wireless technologies, an Intelligent Wireless Web (IWW) using context-aware computing capability represents the next generation ICT application to construction-logistics management. This intelligent system has the potential of serving and improving the construction logistics through access to context-specific data, information and services. Existing mobile communication deployments in the construction industry rely on static modes of information delivery and do not take into account the worker’s changing context and dynamic project conditions. The major problems in these applications are lack of context-specificity in the distribution of information, services and other project resources, and lack of cohesion with the existing desktop based ICT infrastructure. The research works focus on identifying the context dimension such as user context, environmental context and project context, selection of technologies to capture context-parameters such wireless sensors and RFID, selection of supporting technologies such as wireless communication, Semantic Web, Web Services, agents, etc. The process of integration of Context-Aware Computing and Web-Services to facilitate the creation of intelligent collaboration environment for managing construction logistics will take into account all the necessary critical parameters such as storage, transportation, distribution, assembly, etc. within off and on-site project.
Resumo:
Purpose-Unplanned changes in construction projects are common and lead to disruptive effects such as project delays, cost overruns and quality deviations. Rework due to unplanned changes can cost 10-15 per cent of contract value. By managing these changes more effectively, these disruptive effects can be minimised. Previous research has approached this problem from an information-processing view. In this knowledge age, the purpose of this paper is to argue that effective change management can be brought about by better understanding the significant role of knowledge during change situations. Design/methodology/approach - Within this knowledge-based context, the question of how construction project teams manage knowledge during unplanned change in the construction phase within collaborative team settings is investigated through a selected case study sample within the UK construction industry. Findings- Case study findings conclude that different forms of knowledge are created and shared between project team members during change events which is very much socially constructed and centred on tacit knowledge and experience of project personnel. Originality/value- Building on the case study findings the paper finally offers a model that represents the role of knowledge during managing project change.
Resumo:
The SternReview(2006) on the economics of climate change has changed the ground onwhich arguments over climate change are fought. In making the economic case for mitigation over adaptation, Stern has sought to undermine one of the primary arguments against decisive early action - that the immediate costs outweigh the long-term benefits. While this argument is made at the global level, it is appropriate to ask what implications Stern's arguments might have at the construction sectoral level. The implications of the Stern Review for construction can be divided into three main questions. How construction would be different if Stern's economics were applied? How would construction companies act differently if Stern's ethics were adopted? How will the political response to the Stern Review change construction's policy and regulatory landscape? The impact of the Review has shifted the debate from the natural science community into the public policy domain and onto an economic rationale. There seems to have been a pronounced shift away from the debate over the science and towards the economics of mitigation versus adaptation. In this context, the academic debate over Stern's methods is irrelevant - it is his findings, authority and use of the hegemonic power of economic argument that carry the day. This is likely to be Stern's true legacy, and through this will come his greatest impact on construction.
Resumo:
Purpose – The purpose of this research is to show that reliability analysis and its implementation will lead to an improved whole life performance of the building systems, and hence their life cycle costs (LCC). Design/methodology/approach – This paper analyses reliability impacts on the whole life cycle of building systems, and reviews the up-to-date approaches adopted in UK construction, based on questionnaires designed to investigate the use of reliability within the industry. Findings – Approaches to reliability design and maintainability design have been introduced from the operating environment level, system structural level and component level, and a scheduled maintenance logic tree is modified based on the model developed by Pride. Different stages of the whole life cycle of building services systems, reliability-associated factors should be considered to ensure the system's whole life performance. It is suggested that data analysis should be applied in reliability design, maintainability design, and maintenance policy development. Originality/value – The paper presents important factors in different stages of the whole life cycle of the systems, and reliability and maintainability design approaches which can be helpful for building services system designers. The survey from the questionnaires provides the designers with understanding of key impacting factors.