988 resultados para Rehabilitation project


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The success of many knowledge-intensive industries depends on creative projects that lie at the heart of their logic of production. The temporality of such projects, however, is an issue that is insufficiently understood. To address this, we study the perceived time frame of teams that work on creative projects and its effects on project dynamics. An experiment with 267 managers assigned to creative project teams with varying time frames demonstrates that compared to creative project teams with a relatively longer time frame, project teams with a shorter time frame focus more on the immediate present, are less immersed in their task, and utilize a more heuristic mode of information processing. Furthermore, we find that time frame moderates the negative effect of team conflict on team cohesion. These results are consistent with our theory that the temporary nature of creative projects shapes different time frames among project participants, and that it is this time frame that is an important predictor of task and team processes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Rats are superior to the most advanced robots when it comes to creating and exploiting spatial representations. A wild rat can have a foraging range of hundreds of meters, possibly kilometers, and yet the rodent can unerringly return to its home after each foraging mission, and return to profitable foraging locations at a later date (Davis, et al., 1948). The rat runs through undergrowth and pipes with few distal landmarks, along paths where the visual, textural, and olfactory appearance constantly change (Hardy and Taylor, 1980; Recht, 1988). Despite these challenges the rat builds, maintains, and exploits internal representations of large areas of the real world throughout its two to three year lifetime. While algorithms exist that allow robots to build maps, the questions of how to maintain those maps and how to handle change in appearance over time remain open. The robotic approach to map building has been dominated by algorithms that optimise the geometry of the map based on measurements of distances to features. In a robotic approach, measurements of distance to features are taken with range-measuring devices such as laser range finders or ultrasound sensors, and in some cases estimates of depth from visual information. The features are incorporated into the map based on previous readings of other features in view and estimates of self-motion. The algorithms explicitly model the uncertainty in measurements of range and the measurement of self-motion, and use probability theory to find optimal solutions for the geometric configuration of the map features (Dissanayake, et al., 2001; Thrun and Leonard, 2008). Some of the results from the application of these algorithms have been impressive, ranging from three-dimensional maps of large urban strucutures (Thrun and Montemerlo, 2006) to natural environments (Montemerlo, et al., 2003).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Management (or perceived mismanagement) of large-scale, complex projects poses special problems and often results in spectacular failures, cost overruns, time blowouts and stakeholder dissatisfaction. While traditional project management responds with increasingly administrative constraints, we argue that leaders of such projects also need to display adaptive and enabling behaviours to foster adaptive processes, such as opportunity recognition, which requires an interaction of cognitive and affective processes of individual, project, and team leader attributes and behaviours. At the core of this model we propose is an interaction of cognitive flexibility, affect and emotional intelligence. The result of this interaction is enhanced leader opportunity recognition that, in turn, facilitates multilevel outcomes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper, we develop a conceptual model to explore the perceived complementary congruence between complex project leaders and the demands of the complex project environment to understand how leaders’ affective and behavioural performance at work might be impacted by this fit. We propose that complex project leaders high in emotional intelligence and cognitive flexibility should report a higher level of fit between themselves and the complex project environment. This abilities-demands measure of fit should then relate to affective and behavioural performance outcomes, such that leaders who perceive a higher level of fit should establish and maintain more effective, higher quality project stakeholder relationships than leaders who perceive a lower level of fit.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Open pit mine operations are complex businesses that demand a constant assessment of risk. This is because the value of a mine project is typically influenced by many underlying economic and physical uncertainties, such as metal prices, metal grades, costs, schedules, quantities, and environmental issues, among others, which are not known with much certainty at the beginning of the project. Hence, mining projects present a considerable challenge to those involved in associated investment decisions, such as the owners of the mine and other stakeholders. In general terms, when an option exists to acquire a new or operating mining project, , the owners and stock holders of the mine project need to know the value of the mining project, which is the fundamental criterion for making final decisions about going ahead with the venture capital. However, obtaining the mine project’s value is not an easy task. The reason for this is that sophisticated valuation and mine optimisation techniques, which combine advanced theories in geostatistics, statistics, engineering, economics and finance, among others, need to be used by the mine analyst or mine planner in order to assess and quantify the existing uncertainty and, consequently, the risk involved in the project investment. Furthermore, current valuation and mine optimisation techniques do not complement each other. That is valuation techniques based on real options (RO) analysis assume an expected (constant) metal grade and ore tonnage during a specified period, while mine optimisation (MO) techniques assume expected (constant) metal prices and mining costs. These assumptions are not totally correct since both sources of uncertainty—that of the orebody (metal grade and reserves of mineral), and that about the future behaviour of metal prices and mining costs—are the ones that have great impact on the value of any mining project. Consequently, the key objective of this thesis is twofold. The first objective consists of analysing and understanding the main sources of uncertainty in an open pit mining project, such as the orebody (in situ metal grade), mining costs and metal price uncertainties, and their effect on the final project value. The second objective consists of breaking down the wall of isolation between economic valuation and mine optimisation techniques in order to generate a novel open pit mine evaluation framework called the ―Integrated Valuation / Optimisation Framework (IVOF)‖. One important characteristic of this new framework is that it incorporates the RO and MO valuation techniques into a single integrated process that quantifies and describes uncertainty and risk in a mine project evaluation process, giving a more realistic estimate of the project’s value. To achieve this, novel and advanced engineering and econometric methods are used to integrate financial and geological uncertainty into dynamic risk forecasting measures. The proposed mine valuation/optimisation technique is then applied to a real gold disseminated open pit mine deposit to estimate its value in the face of orebody, mining costs and metal price uncertainties.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background: The current model of care for breast cancer is focused on disease treatment followed by ongoing recurrence surveillance. This approach lacks attention to the patients’ physical and functional well-being. Breast cancer treatment sequelae can lead to physical impairments and functional limitations. Common impairments include pain, fatigue, upper extremity dysfunction, lymphedema, weakness, joint arthralgia, neuropathy, weight gain, cardiovascular effects, and osteoporosis. Evidence supports prospective surveillance for early identification and treatment as a means to prevent or mitigate many of these concerns. Purpose: This paper proposes a prospective surveillance model for physical rehabilitation and exercise that can be integrated with disease treatment to create a more comprehensive approach to survivorship health care. The goals of the model are to promote surveillance for common physical impairments and functional limitations associated with breast cancer treatment, to provide education to facilitate early identification of impairments, to introduce rehabilitation and exercise intervention when physical impairments are identified and to promote and support physical activity and exercise behaviors through the trajectory of disease treatment and survivorship. Methods: The model is the result of a multi-disciplinary meeting of research and clinical experts in breast cancer survivorship and representatives of relevant professional and advocacy organizations. Outcomes: The proposed model identifies time points during breast cancer care for assessment of and education about physical impairments. Ultimately, implementation of the model may influence incidence and severity of breast cancer treatment related physical impairments. As such, the model seeks to optimize function during and following treatment and positively influence a growing survivorship community.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Despite an increasing highlight on the sustainability agenda by the construction industry, sustainable development is often treated with different philosophy, interpretation, and responsibility at various stages of project development by various stakeholders involved. The actual sustainability deliverables from the industry is not substantially tangible, especially at project levels. For infrastructure projects which typically span over long periods of time, achieving consistent sustainability outcomes during various stages of development remains as a formidable task. The absence of common understanding among stakeholders and the lack of appropriate sustainability reporting mechanism are possible causes. Many policies dealing with these issues tend to be too generic and broad-based for practical adaptation. While there had been a plenty of research initiatives on sustainability assessment, there is often a gap between sustainability deliverables during project implementation and the grandeur of promises during project conception. This paper reviews the historical context of sustainable development and its principles, and past studies on sustainable construction, focusing on infrastructure projects. It goes on to introduce a QUT research project aimed at identifying and integrating the different perceptions and priority needs of the stakeholders, along with identifying issues that impact on the gap between sustainability foci and its actual realization at project end level, in order to generate a framework of enhancing sustainable deliverables. It is expected that the research will help promote more integrated approaches to decision-making on the implementation of sustainability strategies and foci during the construction project delivery processes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper, an ‘ecological’ lens is applied to an independent living project aiming to provide ‘homes for life’ for adult children with disabilities. The qualities of the project as ecological praxis are highlighted along with the implications for an open-ended enquiry into ecologies for and of the interior. In terms of the ecological concern for intimate modes of being, interior design is shown to be well placed through its association with environments in which people spend most of their life and through powerful concepts such as ‘interiority’ and ‘home’ which link to fundamental existential notions of ‘self ’ and ‘identity’. However, despite the interior being a significant generative force, this has not happened to the exclusion of other disciplines. Ignoring territorial urges to claim areas and concepts as one’s own, the paper describes how the project has actively encouraged design disciplines to trespass in each other’s territories. Ecologies for and of the interior, while recognising the need for discipline emphasis, also demand an integrated and collective approach through what is in effect transdisciplinary practice.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Texas Department of Transportation (TxDOT) is concerned about the widening gap between preservation needs and available funding. Funding levels are not adequate to meet the preservation needs of the roadway network; therefore projects listed in the 4-Year Pavement Management Plan must be ranked to determine which projects should be funded now and which can be postponed until a later year. Currently, each district uses locally developed methods to prioritize projects. These ranking methods have relied on less formal qualitative assessments based on engineers’ subjective judgment. It is important for TxDOT to have a 4-Year Pavement Management Plan that uses a transparent, rational project ranking process. The objective of this study is to develop a conceptual framework that describes the development of the 4-Year Pavement Management Plan. It can be largely divided into three Steps; 1) Network-Level project screening process, 2) Project-Level project ranking process, and 3) Economic Analysis. A rational pavement management procedure and a project ranking method accepted by districts and the TxDOT administration will maximize efficiency in budget allocations and will potentially help improve pavement condition. As a part of the implementation of the 4-Year Pavement Management Plan, the Network-Level Project Screening (NLPS) tool including the candidate project identification algorithm and the preliminary project ranking matrix was developed. The NLPS has been used by the Austin District Pavement Engineer (DPE) to evaluate PMIS (Pavement Management Information System) data and to prepare a preliminary list of candidate projects for further evaluation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In an attempt to enhance the efficiency, productivity and competitiveness of today’s Architectural, Engineering, and Contractor (AEC) industry, this paper summarises the current status of an ongoing PhD research investigation in developing a sustainable AEC industry specific best-practice ‘Innovation-driven Change Framework’—more specifically a summation of the ‘fourth interrelated dynamic’ (culture). Leveraging off the outcomes of a two year industry and government supported Cooperative Research Centre for Construction Innovation (CRCCI) research project, as well as referring to recent internationally renowned case studies and related literature investigations, this research investigation includes further identifying, processing, analysing and categorizing various culture change methods, models, frameworks and processes utilized within the AEC and other industry sectors, and incorporating these findings in developing an AEC industry-specific ‘Innovation-driven Change Framework’

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Under pressure from both the ever increasing level of market competition and the global financial crisis, clients in consumer electronics (CE) industry are keen to understand how to choose the most appropriate procurement method and hence to improve their competitiveness. Four rounds of Delphi questionnaire survey were conducted with 12 experts in order to identify the most appropriate procurement method in the Hong Kong CE industry. Five key selection criteria in the CE industry are highlighted, including product quality, capability, price competition, flexibility and speed. This study also revealed that product quality was found to be the most important criteria for the “First type used commercially” and “Major functional improvements” projects. As for “Minor functional improvements” projects, price competition was the most crucial factor to be considered during the PP selection. These research findings provide owners with useful insights to select the procurement strategies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Recent years have seen a rapid increase in SMEs working collaboratively in inter-organizational projects. But what drives the emergence of such projects, and what types of industries breed them the most? To address these questions, this paper extends the long running literature on the firm and industry antecedents of new venturing and alliance formation to the domain of project-based organization by SMEs. Based on survey data collected among 1,725 small and medium sized organizations and longitudinal industry data, we find an overall pattern that indicates that IOPV participation is primarily determined by a focal SME’s scope of innovative activities, and the munificence, dynamism and complexity of its environment. Unexpectedly, these variables have different effects on whether SMEs are likely to engage in IOPVs, compared to with how many there are in their portfolio at a time. Implications for theory development are discussed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Discovering factors that help or impede business model change is an important quest, both for researchers and practitioners. In this study we present preliminary findings based on the CAUSEE survey of young and nascent firms in Australia. In particular, we seek to determine an association between business model adaptation and external orientation among young and nascent firms within the random sample and amongst an oversample of high potential firms. The concept of external orientation is made operational by asking respondents whether, and to what extent, they rely on certain sources of advice and information. We find that high potential firms are more likely to have made at least some change to their business model, that greater use of external sources of advice is generally significantly associated with business model adaptation, but also that there appear to be different patterns of behaviour between the random sample and the over sample.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Cardiovascular disease (CVD) continues to impose a heavy burden in terms of cost, disability and death in Australia. Evidence suggests that increasing remoteness, where cardiac services are scarce, is linked to an increased risk of dying from CVD. Fatal CVD events are reported to be between 20% and 50% higher in rural areas compared to major cities. The Cardiac ARIA project, with its extensive use of geographic Information Systems (GIS), ranks each of Australia’s 20,387 urban, rural and remote population centres by accessibility to essential services or resources for the management of a cardiac event. This unique, innovative and highly collaborative project delivers a powerful tool to highlight and combat the burden imposed by cardiovascular disease (CVD) in Australia. Cardiac ARIA is innovative. It is a model that could be applied internationally and to other acute and chronic conditions such as mental health, midwifery, cancer, respiratory, diabetes and burns services. Cardiac ARIA was designed to: 1. Determine by expert panel, what were the minimal services and resources required for the management of a cardiac event in any urban, rural or remote population locations in Australia using a single patient pathway to access care. 2. Derive a classification using GIS accessibility modelling for each of Australia’s 20,387 urban, rural and remote population locations. 3. Compare the Cardiac ARIA categories and population locations with census derived population characteristics. Key findings are as follows: • In the event of a cardiac emergency, the majority of Australians had very good access to cardiac services. Approximately 71% or 13.9 million people lived within one hour of a category one hospital. • 68% of older Australians lived within one hour of a category one hospital (Principal Referral Hospital with access to Cardiac Catheterisation). • Only 40% of indigenous people lived within one hour of the category one hospital. • 16% (74000) of indigenous people lived more than one hour from a hospital. • 3% (91,000) of people 65 years of age or older lived more than one hour from any hospital or clinic. • Approximately 96%, or 19 million, of people lived within one hour of the four key services to support cardiac rehabilitation and secondary prevention. • 75% of indigenous people lived within one hour of the four cardiac rehabilitation services to support cardiac rehabilitation and secondary prevention. Fourteen percent (64,000 persons) indigenous people had poor access to the four key services to support cardiac rehabilitation and secondary prevention. • 12% (56,000) of indigenous people were more than one hour from a hospital and only had access one the four key services (usually a medical service) to support cardiac rehabilitation and secondary prevention.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Sibelco Australia Limited (SAL), a mineral sand mining operation on North Stradbroke Island, undertakes progressive rehabilitation of mined areas. Initial investigations have found that some areas at SAL’s Yarraman Mine have failed to redevelop towards approved criteria. This study, undertaken in 2010, examined ground cover rehabilitation of different aged plots at the Yarraman Mine to determine if there was a relationship between key soil and vegetation attributes. Vegetation and soil data were collected from five plots rehabilitated in 2003, 2006, 2008, 2009 and 2010, and one unmined plot. Cluster (PATN) analysis revealed that vegetation species composition, species richness and ground cover differed between plots. Principal component analysis (PCA) extracted ten soil attributes that were then correlated with vegetation data. The attributes extracted by PCA, in order of most common variance, were: water content, pH, terrolas depth, elevation, slope angle, leaf litter depth, total organic carbon, and counts of macrofauna, fungi and bacteria. All extracted attributes differed between plots, and all except bacteria correlated with at least one vegetation attribute. Water content and pH correlated most strongly with vegetation cover suggesting an increase in soil moisture and a reduction in pH are required in order to improve vegetation rehabilitation at Yarraman Mine. Further study is recommended to confirm these results using controlled experiments and to test potential solutions, such as organic amendments.