885 resultados para Projects in dispute


Relevância:

90.00% 90.00%

Publicador:

Resumo:

The Indian Petroleum Industry is passing through a very dynamic business environment due to liberalization. Effective project management for developing new infrastructures and maintaining the existing facilities has been considered as one of the means for remaining competitive but these practices suffer from many shortcomings, as time, cost and quality non-achievements are part and parcel of almost every project. This study focuses on identifying the specific causes of project failure by demonstrating first the characteristics of projects in Indian Petroleum industry and suggests some remedial measures for resolving these issues. The suggested project management model is integrated through information management system and demonstrated through a case study.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Construction customers are persistently seeking to achieve sustainability and maximize value as sustainability has become a major consideration in the construction industry. In particular, it is essential to refurbish a whole house to achieve the sustainability agenda of 80% CO2 reduction by 2050 as the housing sector accounts for 28% of the total UK CO2 emission. However, whole house refurbishment seems to be challenging due to the highly fragmented nature of construction practice, which makes the integration of diverse information throughout the project lifecycle difficult. Consequently, Building Information Modeling (BIM) is becoming increasingly difficult to ignore in order to manage construction projects in a collaborative manner, although the current uptake of the housing sector is low at 25%. This research aims to investigate homeowners’ decision making factors for housing refurbishment projects and to provide a valuable dataset as an essential input to BIM for such projects. One-hundred and twelve homeowners and 39 construction professionals involved in UK housing refurbishment were surveyed. It was revealed that homeowners value initial cost more while construction professionals value thermal performance. The results supported that homeowners and professionals both considered the first priority to be roof refurbishment. This research revealed that BIM requires a proper BIM dataset and objects for housing refurbishment.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This article introduces a small setting case study about the benefits of using TSPi in a software project. An adapted process from the current process based on the TSPi was defined. The pilot project had schedule and budget constraints. The process began by gathering historical data from previous projects in order to get a measurement repository. The project was launched with the following goals: increase the productivity, reduce the test time and improve the product quality. Finally, the results were analysed and the goals were verified.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The aim of this study is to address the main deficiencies with the prevailing project cost and time control practices for construction projects in the UK. A questionnaire survey was carried out with 250 top companies followed by in-depth interviews with 15 experienced practitioners from these companies in order to gain further insights of the identified problems, and their experience of good practice on how these problems can be tackled. On the basis of these interviews and syntheses with literature, a list of 65 good practice recommendations have been developed for the key project control tasks: planning, monitoring, reporting and analysing. The Delphi method was then used, with the participation of a panel of 8 practitioner experts, to evaluate these improvement recommendations and to establish their degree of relevance. After two rounds of Delphi, these recommendations are put forward as "critical", "important", or "helpful" measures for improving project control practice.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This paper aims to sketch some bases for the problematization of digital tools as objects of knowledge for Social Sciences and Humanities (SSH). Our purpose is to raise some relevant questions about the Digital Humanities (DH) and how SSH and Computer Sciences (CS) can work together to face new challenges. We discuss some tension points and propose a model for SSH and CS collaboration for joint projects in cultural digitization.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This study explores the ongoing pedagogical development of a number of undergraduate design and engineering programmes in the United Kingdom. Observations and data have been collected over several cohorts to bring a valuable perspective to the approaches piloted across two similar university departments while trialling a number of innovative learning strategies. In addition to the concurrent institutional studies the work explores curriculum design that applies the principles of Co-Design, multidisciplinary and trans disciplinary learning, with both engineering and product design students working alongside each other through a practical problem solving learning approach known as the CDIO learning initiative (Conceive, Design Implement and Operate) [1]. The study builds on previous work presented at the 2010 EPDE conference: The Effect of Personality on the Design Team: Lessons from Industry for Design Education [2]. The subsequent work presented in this paper applies the findings to mixed design and engineering team based learning, building on the insight gained through a number of industrial process case studies carried out in current design practice. Developments in delivery also aligning the CDIO principles of learning through doing into a practice based, collaborative learning experience and include elements of the TRIZ creative problem solving technique [3]. The paper will outline case studies involving a number of mixed engineering and design student projects that highlight the CDIO principles, combined with an external industrial design brief. It will compare and contrast the learning experience with that of a KTP derived student project, to examine an industry based model for student projects. In addition key areas of best practice will be presented, and student work from each mode will be discussed at the conference.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Purpose - The purpose of this paper is to report an investigation of local sustainable production in Australia and Sweden aimed at exploring the factors contributing to survival and competitiveness of manufacturing companies. Design/methodology/approach - In Australia, six companies were studied in 2010, with comparisons being made with three of them from earlier projects. In Sweden, eight manufacturing companies were studied on two occasions 30 years apart, in 1980 and 2010. To provide a valid comparative perspective a common format for data collection and analysis was used. Findings - There has been a shift in the nature of competition in both Sweden and Australia due to an increasing complexity of the global business environment as well as changes in technology and customer expectations. Despite the differences in country context, the findings suggest that all the manufacturing companies have a good awareness of the elements of the market environment and the relationships with their competitive strategy. However, in general, the Swedish companies have more experience of managing the risks and benefits from operating in the international environment. Research limitations/implications - The results of the research are based on a relatively small sample of case companies in a limited number of industrial sectors. There are methodology implications for future research in the area. Practical implications - The research results have practical implications for the manufacturing industry, especially for companies operating in a competitive international environment. Originality/value - The paper is based on original case research and comparative analysis of data from different geographical contexts. It contributes to both theory and management practice about the strategic resources, decision choices, competitive environments and firm values needed to address external market demands as well as in building internal capabilities.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Írásunk a Public-Private Partnership (PPP) magyarországi megvalósulásának hangsúlyairól szól. Azt vizsgáljuk, hogy a szakmai közvélemény milyen képet alakíthatott ki e projektekről a szaksajtó olvasásán keresztül. Három tágabb elvi szempont sajtóbeli megjelenésének súlyát elemezzük: a PPP céljai, a feladatok hatékonyabb elvégzésének módja, illetve a társadalmi kontroll megvalósulása áll érdeklődésünk középpontjában. A tartalomelemzés matematikai-statisztikai módszereit alkalmazzuk. Következtetésünk, hogy a PPP-projektek általában még nem elvi lényegük szerint valósultak meg Magyarországon, bár az évek során érzékelhető pozitív irányú elmozdulás: tanulási folyamat történik. Ennek alapján nem szabad a PPP-t mint módszert elvetni a közfeladatok ellátásában, hanem alkalmazási módjának tökéletesítésére kell törekedni. = This working paper focuses on the perceptions of the Hungarian implementation of Public-Private Partnership (PPP) projects. It was examined how PPP was perceived in the wider public through the communication of the most read daily and weekly business journals. We analyzed the proportion of three broad aspects in the articles: the main goals of PPP, efficiency improvement as a substantial opportunity for value creation, and the role of democratic control. We applied the mathematical-statistical methods of content analysis. Our conclusion is that PPP-projects in Hungary are far from the normative model of implementation as discerned from literature, but from year to year a positive shift, a learning process can be observed. Therefore, instead of discarding PPP as a progressive government solution, Hungary should focus on improving the design and implementation of PPP projects.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Az elemzés a PPP (Public-Private Partnership) magyarországi felfutásának és visszaesésének izgalmas éveit tárja fel, amelynek alapján megállapítható, hogy a magyar gyakorlatban körvonalazódó PPP nem az a PPP, amely a nemzetközi tapasztalatok alapján a közfeladatok megvalósításának közgazdaságilag megalapozott eszköze lehetne. A szerző úgy gondolja, hogy nem a PPP-módszer elvetése a megfelelő válasz a létező hibákra, hanem alkalmazásának módján kell javítani, a fokozatosan halmozódó tapasztalatok értő felhasználásával. ______ Public-Private Partnership (PPP) has quickly become a well-known phenomenon in Hungary. Despite its proliferation in various areas of activities, and the fact that most of these projects are still running, interest for starting new PPP projects has ceased, and even the cancellation of the project has become an issue. My research objective was to understand better how the concept of PPP has been interpreted by the wider public, through the assessment of the projects appearance in the main economic newspapers. The analysis shows that what has been implemented as PPP projects in Hungary are conceptually different from what PPP as an economically justified concept substantiates. PPP seems to be a phenomenon grossly misunderstood in Hungary.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The current research considers the capacity of a local organic food system for producer and consumer empowerment and sustainable development outcomes in western Guatemala. Many have argued that the forging of local agricultural networks linking farmers, consumers, and supporting institutions is an effective tool for challenging the negative economic, environmental, and sociopolitical impacts associated with industrial models of global food production. But does this work in the context of agrarian development in the developing world? Despite the fact that there is extensive literature concerning local food system formation in the global north, there remains a paucity of research covering how the principles of local food systems are being integrated into agricultural development projects in developing countries. My work critically examines claims to agricultural sustainability and actor empowerment in a local organic food system built around non-traditional agricultural crops in western Guatemala. Employing a mixed methods research design involving twenty months of participant observation, in-depth interviewing, surveying, and a self-administered questionnaire, the project evaluates the sustainability of this NGO-led development initiative and local food movement along several dimensions. Focusing on the unique economic and social networks of actors and institutions at each stage of the commodity chain, this research shows how the growth of an alternative food system continues to be shaped by context specific processes, politics, and structures of conventional food systems. Further, it shows how the specifics of context also produce new relationships of cooperation and power in the development process. Results indicate that structures surrounding agrarian development in the Guatemalan context give rise to a hybrid form of development that at the same time contests and reinforces conventional models of food production and consumption. Therefore, participation entails a host of compromises and tradeoffs that result in mixed successes and setbacks, as actors attempt to refashion conventional commodity chains through local food system formation.^

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The purpose of this study was to gain a better understanding of the foreign direct investment location decision making process through the examination of non-Western investors and their investment strategies in non-traditional markets. This was accomplished through in-depth personal interviews with 50 Overseas Chinese business owners and executives in several different industries from Hong Kong, Singapore, Taiwan, Malaysia, and Thailand about 97 separate investment projects in Southeast and East Asia, including The Philippines, Malaysia, Hong Kong, Singapore, Vietnam, India, Pakistan, South Korea, Australia, Indonesia, Cambodia, Thailand, Burma, Taiwan, and Mainland China.^ Traditional factors utilized in Western models of the foreign direct investment decision making process are reviewed, as well as literature on Asian management systems and the current state of business practices in emerging countries of Southeast and East Asia. Because of the lack of institutionalization in these markets and the strong influences of Confucian and patriarchal value systems on the Overseas Chinese, it was suspected that while some aspects of Western rational economic models of foreign direct investment are utilized, these models are insufficient in this context, and thus are not fully generalizable to the unique conditions of the Overseas Chinese business network in the region without further modification.^ Thus, other factors based on a Confucian value system need to be integrated into these models. Results from the analysis of structured interviews suggest Overseas Chinese businesses rely more heavily on their network and traditional Confucian values than rational economic factors when making their foreign direct investment location decisions in emerging countries in Asia. This effect is moderated by the firm's industry and the age of the firm's owners. ^

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Construction organizations typically deal with large volumes of project data containing valuable information. It is found that these organizations do not use these data effectively for planning and decision-making. There are two reasons. First, the information systems in construction organizations are designed to support day-to-day construction operations. The data stored in these systems are often non-validated, non-integrated and are available in a format that makes it difficult for decision makers to use in order to make timely decisions. Second, the organizational structure and the IT infrastructure are often not compatible with the information systems thereby resulting in higher operational costs and lower productivity. These two issues have been investigated in this research with the objective of developing systems that are structured for effective decision-making. ^ A framework was developed to guide storage and retrieval of validated and integrated data for timely decision-making and to enable construction organizations to redesign their organizational structure and IT infrastructure matched with information system capabilities. The research was focused on construction owner organizations that were continuously involved in multiple construction projects. Action research and Data warehousing techniques were used to develop the framework. ^ One hundred and sixty-three construction owner organizations were surveyed in order to assess their data needs, data management practices and extent of use of information systems in planning and decision-making. For in-depth analysis, Miami-Dade Transit (MDT) was selected which is in-charge of all transportation-related construction projects in the Miami-Dade county. A functional model and a prototype system were developed to test the framework. The results revealed significant improvements in data management and decision-support operations that were examined through various qualitative (ease in data access, data quality, response time, productivity improvement, etc.) and quantitative (time savings and operational cost savings) measures. The research results were first validated by MDT and then by a representative group of twenty construction owner organizations involved in various types of construction projects. ^

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Construction organizations typically deal with large volumes of project data containing valuable information. It is found that these organizations do not use these data effectively for planning and decision-making. There are two reasons. First, the information systems in construction organizations are designed to support day-to-day construction operations. The data stored in these systems are often non-validated, nonintegrated and are available in a format that makes it difficult for decision makers to use in order to make timely decisions. Second, the organizational structure and the IT infrastructure are often not compatible with the information systems thereby resulting in higher operational costs and lower productivity. These two issues have been investigated in this research with the objective of developing systems that are structured for effective decision-making. A framework was developed to guide storage and retrieval of validated and integrated data for timely decision-making and to enable construction organizations to redesign their organizational structure and IT infrastructure matched with information system capabilities. The research was focused on construction owner organizations that were continuously involved in multiple construction projects. Action research and Data warehousing techniques were used to develop the framework. One hundred and sixty-three construction owner organizations were surveyed in order to assess their data needs, data management practices and extent of use of information systems in planning and decision-making. For in-depth analysis, Miami-Dade Transit (MDT) was selected which is in-charge of all transportation-related construction projects in the Miami-Dade county. A functional model and a prototype system were developed to test the framework. The results revealed significant improvements in data management and decision-support operations that were examined through various qualitative (ease in data access, data quality, response time, productivity improvement, etc.) and quantitative (time savings and operational cost savings) measures. The research results were first validated by MDT and then by a representative group of twenty construction owner organizations involved in various types of construction projects.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The “University City project” is a public-private partnership between Florida International University (FIU), the City of Sweetwater, and private investors. The project focuses on redeveloping certain areas of Sweetwater near FIU with the goal of enticing members of the university community to become residents. Building on previous research findings regarding how redevelopment prospects in the City of Sweetwater are affecting residents of the Li’l Abner Mobile Home Park, I examine how these changes are affecting residents in the immediate vicinity of the University. Using a combination of semi-structured interviews and participant observation, I seek to answer the following questions: How do Sweetwater residents feel about development projects in the community of Sweetwater? In what ways do these changes affect their lives? How powerful or powerless do they feel in the face of these changes, or how much say do they believe they have in their implementation? This research will add depth and context to the emerging interdisciplinary study of the “studentification” phenomenon, a form of gentrification that is centered on students, which has received little attention in the United States.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Industrial land development has become a key feature of urbanization in Greater Jakarta, one of the largest metropolitan areas in Southeast Asia. Following Suharto’s marketoriented policy measures in the late 1980s, private developers have dominated the land development projects in Greater Jakarta. The article investigates the extent to which these private industrial centers have effectively reduced the domination of Jakarta in shaping the entire metropolitan structure. The analysis indicates that major suburban industrial centers have captured most of the manufacturing employment that has dispersed from Jakarta. The industrial centers have now increasingly specialized and diversified. It is likely that a polycentric metropolitan structure will emerge in the future.