888 resultados para Edisto River Wildlife Management Area--Maps
Resumo:
Extensive resources are allocated to managing vertebrate pests, yet spatial understanding of pest threats, and how they respond to management, is limited at the regional scale where much decision-making is undertaken. We provide regional-scale spatial models and management guidance for European rabbits (Oryctolagus cuniculus) in a 260,791 km(2) region in Australia by determining habitat suitability, habitat susceptibility and the effects of the primary rabbit management options (barrier fence, shooting and baiting and warren ripping) or changing predation or disease control levels. A participatory modelling approach was used to develop a Bayesian network which captured the main drivers of suitability and spread, which in turn was linked spatially to develop high resolution risk maps. Policy-makers, rabbit managers and technical experts were responsible for defining the questions the model needed to address, and for subsequently developing and parameterising the model. Habitat suitability was determined by conditions required for warren-building and by above-ground requirements, such as food and harbour, and habitat susceptibility by the distance from current distributions, habitat suitability, and the costs of traversing habitats of different quality. At least one-third of the region had a high probability of being highly suitable (support high rabbit densities), with the model supported by validation. Habitat susceptibility was largely restricted by the current known rabbit distribution. Warren ripping was the most effective control option as warrens were considered essential for rabbit persistence. The anticipated increase in disease resistance was predicted to increase the probability of moderately suitable habitat becoming highly suitable, but not increase the at-risk area. We demonstrate that it is possible to build spatial models to guide regional-level management of vertebrate pests which use the best available knowledge and capture fine spatial-scale processes.
Resumo:
Dry seeding of aman rice can facilitate timely crop establishment and early harvest and thus help to alleviate the monga (hunger) period in the High Ganges Flood Plain of Bangladesh. Dry seeding also offers many other potential benefits, including reduced cost of crop establishment and improved soil structure for crops grown in rotation with rice. However, the optimum time for seeding in areas where farmers have access to water for supplementary irrigation has not been determined. We hypothesized that earlier sowing is safer, and that increasing seed rate mitigates the adverse effects of significant rain after sowing on establishment and crop performance. To test these hypotheses, we analyzed long term rainfall data, and conducted field experiments on the effects of sowing date (target dates of 25 May, 10 June, 25 June, and 10 July) and seed rate (20, 40, and 60 kg ha−1) on crop establishment, growth, and yield of dry seeded Binadhan-7 (short duration, 110–120 d) during the 2012 and 2013 rainy seasons. Wet soil as a result of untimely rainfall usually prevented sowing on the last two target dates in both years, but not on the first two dates. Rainfall analysis also suggested a high probability of being able to dry seed in late May/early June, and a low probability of being able to dry seed in late June/early July. Delaying sowing from 25 May/10 June to late June/early July usually resulted in 20–25% lower plant density and lower uniformity of the plant stand as a result of rain shortly after sowing. Delaying sowing also reduced crop duration, and tillering or biomass production when using a low seed rate. For the late June/early July sowings, there was a strong positive relationship between plant density and yield, but this was not the case for earlier sowings. Thus, increasing seed rate compensated for the adverse effect of untimely rains after sowing on plant density and the shorter growth duration of the late sown crops. The results indicate that in this region, the optimum date for sowing dry seeded rice is late May to early June with a seed rate of 40 kg ha−1. Planting can be delayed to late June/early July with no yield loss using a seed rate of 60 kg ha−1, but in many years, the soil is simply too wet to be able to dry seed at this time due to rainfall.
Resumo:
Uncertainty plays an important role in water quality management problems. The major sources of uncertainty in a water quality management problem are the random nature of hydrologic variables and imprecision (fuzziness) associated with goals of the dischargers and pollution control agencies (PCA). Many Waste Load Allocation (WLA)problems are solved by considering these two sources of uncertainty. Apart from randomness and fuzziness, missing data in the time series of a hydrologic variable may result in additional uncertainty due to partial ignorance. These uncertainties render the input parameters as imprecise parameters in water quality decision making. In this paper an Imprecise Fuzzy Waste Load Allocation Model (IFWLAM) is developed for water quality management of a river system subject to uncertainty arising from partial ignorance. In a WLA problem, both randomness and imprecision can be addressed simultaneously by fuzzy risk of low water quality. A methodology is developed for the computation of imprecise fuzzy risk of low water quality, when the parameters are characterized by uncertainty due to partial ignorance. A Monte-Carlo simulation is performed to evaluate the imprecise fuzzy risk of low water quality by considering the input variables as imprecise. Fuzzy multiobjective optimization is used to formulate the multiobjective model. The model developed is based on a fuzzy multiobjective optimization problem with max-min as the operator. This usually does not result in a unique solution but gives multiple solutions. Two optimization models are developed to capture all the decision alternatives or multiple solutions. The objective of the two optimization models is to obtain a range of fractional removal levels for the dischargers, such that the resultant fuzzy risk will be within acceptable limits. Specification of a range for fractional removal levels enhances flexibility in decision making. The methodology is demonstrated with a case study of the Tunga-Bhadra river system in India.
Resumo:
A survey of amphibian mortality on roads was carried out in the Sharavathi river basin in the central Western Ghats. Road kills in three different land use areas: agricultural fields, water bodies and forests were recorded for four days along three 100m stretches in each type of area. One-hundred-and-forty-four individuals belonging to two orders, eight families, 11 genera and 13 species were recorded in the survey. Kills/km observed were: in forest 55, agricultural fields 38 and water bodies 27, for an overall average of 40 kills/km. Kill species compositions varied significantly between land use areas, but not overall kill rates.
Resumo:
Technological development of fast multi-sectional, helical computed tomography (CT) scanners has allowed computed tomography perfusion (CTp) and angiography (CTA) in evaluating acute ischemic stroke. This study focuses on new multidetector computed tomography techniques, namely whole-brain and first-pass CT perfusion plus CTA of carotid arteries. Whole-brain CTp data is acquired during slow infusion of contrast material to achieve constant contrast concentration in the cerebral vasculature. From these data quantitative maps are constructed of perfused cerebral blood volume (pCBV). The probability curve of cerebral infarction as a function of normalized pCBV was determined in patients with acute ischemic stroke. Normalized pCBV, expressed as a percentage of contralateral normal brain pCBV, was determined in the infarction core and in regions just inside and outside the boundary between infarcted and noninfarcted brain. Corresponding probabilities of infarction were 0.99, 0.96, and 0.11, R² was 0.73, and differences in perfusion between core and inner and outer bands were highly significant. Thus a probability of infarction curve can help predict the likelihood of infarction as a function of percentage normalized pCBV. First-pass CT perfusion is based on continuous cine imaging over a selected brain area during a bolus injection of contrast. During its first passage, contrast material compartmentalizes in the intravascular space, resulting in transient tissue enhancement. Functional maps such as cerebral blood flow (CBF), and volume (CBV), and mean transit time (MTT) are then constructed. We compared the effects of three different iodine concentrations (300, 350, or 400 mg/mL) on peak enhancement of normal brain tissue and artery and vein, stratified by region-of-interest (ROI) location, in 102 patients within 3 hours of stroke onset. A monotonic increasing peak opacification was evident at all ROI locations, suggesting that CTp evaluation of patients with acute stroke is best performed with the highest available concentration of contrast agent. In another study we investigated whether lesion volumes on CBV, CBF, and MTT maps within 3 hours of stroke onset predict final infarct volume, and whether all these parameters are needed for triage to intravenous recombinant tissue plasminogen activator (IV-rtPA). The effect of IV-rtPA on the affected brain by measuring salvaged tissue volume in patients receiving IV-rtPA and in controls was investigated also. CBV lesion volume did not necessarily represent dead tissue. MTT lesion volume alone can serve to identify the upper size limit of the abnormally perfused brain, and those with IV-rtPA salvaged more brain than did controls. Carotid CTA was compared with carotid DSA in grading of stenosis in patients with stroke symptoms. In CTA, the grade of stenosis was determined by means of axial source and maximum intensity projection (MIP) images as well as a semiautomatic vessel analysis. CTA provides an adequate, less invasive alternative to conventional DSA, although tending to underestimate clinically relevant grades of stenosis.
Resumo:
‘Practice Forum’ provides a forum for social work practitioners to share their practice with others; to describe what they are doing and assess its effectiveness. The practice of case management is applied in a wide range of service delivery models to meet complex client needs. Unfortunately, cost containment and lack of clarity of the role of the case manager has blurred the definition and practice of case management for both the consumer and professional providers. This article examines two cases of a small non-government agency in Melbourne called Alcohol Related Brain Injury Assessment, Accommodation & Support Inc. (ARBIAS) where case management services are delivered to people with alcohol acquired brain damage. The analysis presented here supports the view that continuity of care and intensive relationship building with clients is vital for successful client outcomes and has application to a variety of programs which service chronically disabled clients.
Resumo:
Agri-environmental schemes have so far resulted in only minor positive implications for the biodiversity of agricultural environments, in contrast to what has been expected. Land-use intensification has decreased landscape heterogeneity and the amount of semi-natural habitats. Field margins are uncultivated areas of permanent vegetation located adjacent to fields. Since the number of these habitats is high, investing in their quality may result in more diverse agricultural landscapes. Field margins can be considered as multifunctional habitats providing agronomic, environmental and wildlife services. This thesis aimed at examining the plant communities of different types of field margin habitats and the factors affecting their species diversity and composition. The importance of edaphic, spatial and management factors was studied on regional, landscape and habitat scales. Vegetation surveys were conducted on regional and landscape scales and a field experiment on cutting management was conducted on a habitat scale. In field margin plant communities, species appeared to be indicators of high or intermediate soil fertility and moist soil conditions. The plant species diversity found was rather low, compared with most species-rich agricultural habitats in Finland, such as dry meadows. Among regions, land-use history, main production line, natural species and human induced distribution, climate and edaphic factors were elements inducing differences in species composition. The lowest regional species diversity of field margins was related to intensive and long-term cereal production. Management by cutting and removal or grazing had a positive effect on plant species diversity. The positive effect of cutting and removal on species richness was also dependent on the adjacent source of colonizing species. Therefore, in species-poor habitats and landscapes, establishment of margins with diverse seed mixtures can be recommended for enhancing the development of species richness. However, seed mixtures should include only native species preferably local origin. Management by cutting once a year for 5 years did not result in a decline in dominance of a harmful weed species, Elymus repens, showing that E. repens probably needs cutting more frequently than once per year. Agri-environmental schemes should include long-term contracts with farmers for the establishment, and management by cutting and removal or grazing, of field margins that are several metres wide. In such schemes, the timing and frequency of management should be planned so as not to harm other taxa, such as the insects and birds that are dependent on these habitats. All accidental herbicide drifts to field margins should be avoided when spraying the cultivated area to minimize the negative effects of sprayings on vegetation. The harmful effects of herbicides can be avoided by organic farming methods.
Resumo:
Gottigere lake with a water spread area of about 14.98 ha is located in the Bellandur Lake catchment of the South Pennar River basin. In recent years, this lake catchment has been subjected to environmental stress mainly due to the rampant unplanned developmental activities in the catchment. The functional ability of the ecosystem is impaired due to structural changes in the ecosystem. This is evident from poor water quality, breeding of disease vectors, contamination of groundwater in the catchment, frequent flooding in the catchment due to topography alteration, decline in groundwater table, erosion in lake bed, etc. The development plans of the region (current as well as the proposed) ignore the integrated planning approaches considering all components of the ecosystem. Serious threats to the sustainability of the region due to lack of holistic approaches in aquatic resources management are land use changes (removal of vegetation cover, etc.), point and non-point sources of pollution impairing water quality, dumping of solid waste (building waste, etc.). Conservation of lake ecosystem is possible only when the physical and chemical integrity of its catchment is maintained. Alteration in the catchment either due to land use changes (leading to paved surface area from vegetation cover), alteration in topography, construction of roads in the immediate vicinity are detrimental to water yield in the catchment and hence, the sustenance of the lake. Open spaces in the form of lakes and parks aid as kidney and lung in an urban ecosystem, which maintain the health of the people residing in the locality. Identification of core buffer zones and conservation of buffer zones (500 to 1000 m from shore) is to be taken up on priority for conservation and sustainable management of Bangalore lakes. Bangalore is located over a ridge delineating four watersheds, viz. Hebbal, Koramangala, Challaghatta and Vrishabhavathi. Lakes and tanks are an integral part of natural drainage and help in retaining water during rainfall, which otherwise get drained off as flash floods. Each lake harvests rainwater from its catchment and surplus flows downstream spilling into the next lake in the chain. The topography of Bangalore has uniquely supported the creation of a large number of lakes. These lakes form chains, being a series of impoundments across streams. This emphasises the interconnectivity among Bangalore lakes, which has to be retained to prevent Bangalore from flooding or from water scarcity. The main source of replenishment of groundwater is the rainfall. The slope of the terrain allows most of the rainwater to flow as run-off. With the steep gradients available in the major valleys of Bangalore, the rainwater will flow out of the city within four to five hours. Only a small fraction of the rainwater infiltrates into the soil. The infiltration of water into the subsoil has declined with more and more buildings and paved road being constructed in the city. Thus the natural drainage of Bangalore is governed by flows from the central ridge to all lower contours and is connected with various tanks and ponds. There are no major rivers flowing in Bangalore and there is an urgent need to sustain these vital ecosystems through proper conservation and management measures. The proposed peripheral ring road connecting Hosur Road (NH 7) and Mysore Road (SH 17) at Gottigere lake falls within the buffer zone of the lake. This would alter the catchment integrity and hence water yield affecting flora, fauna and local people, and ultimately lead to the disappearance of Gottigere lake. Developmental activities in lake catchments, which has altered lake’s ecological integrity is in violation of the Indian Fisheries Act – 1857, the Indian Forest Act – 1927, Wildlife (Protection) Act – 1972, Water (Prevention and Control of Pollution) Act – 1974, Water (Prevention and Control of Pollution) Act – 1977, Forest (Conservation Act) – 1980, Environmental (Protection) Act – 1986, Wildlife (Protection) Amendment Act – 1991 and National Conservation Strategy and Policy Statement on Environment and Development – 1992. Considering 65% decline of waterbodies in Bangalore (during last three decades), decision makers should immediately take preventive measures to ensure that lake ecosystems are not affected. This report discusses the impacts due to the proposed infrastructure developmental activities in the vicinity of Gottigere tank.
Resumo:
This article presents the results of a study using satellite remote sensing techniques to evaluate the current status of canal system performance in terms of the spatial and temporal mismatch between water requirements and water releases within the command area The Rajolibanda Diversion Scheme(RDS)is the only operational major irrigation project in the drought prone district of Mahaboobnagar in Andra Pradesh. It is an inter-state project between Karnataka and Andra Pradesh which comprises of an anicut constructed in Karnataka in 1995 across river Thungabhdra and a 143 km long left bank main canel. The initial 42.6 km of the canel lies in Karnataka consisting of 12 distributaries and servers and serves an localised ayacut of 2739ha. In Andra Pradesh, the latter stretch of the main canal consists of distributaries 12A to 40, is localised to serve an ayacut of 35,410 ha.of which 14,215 ha during kharif season,19,332 ha, during rabi season and 1,863 ha.of perennial crops
Resumo:
Periodic estimation, monitoring and reporting on area under forest and plantation types and afforestation rates are critical to forest and biodiversity conservation, sustainable forest management and for meeting international commitments. This article is aimed at assessing the adequacy of the current monitoring and reporting approach adopted in India in the context of new challenges of conservation and reporting to international conventions and agencies. The analysis shows that the current mode of monitoring and reporting of forest area is inadequate to meet the national and international requirements. India could be potentially over-reporting the area under forests by including many non-forest tree categories such as commercial plantations of coconut, cashew, coffee and rubber, and fruit orchards. India may also be under-reporting deforestation by reporting only gross forest area at the state and national levels. There is a need for monitoring and reporting of forest cover, deforestation and afforestation rates according to categories such as (i) natural/primary forest, (ii) secondary/degraded forests, (iii) forest plantations, (iv) commercial plantations, (v) fruit orchards and (vi) scattered trees.
Resumo:
Probable maximum precipitation (PMP) is a theoretical concept that is widely used by hydrologists to arrive at estimates for probable maximum flood (PMF) that find use in planning, design and risk assessment of high-hazard hydrological structures such as flood control dams upstream of populated areas. The PMP represents the greatest depth of precipitation for a given duration that is meteorologically possible for a watershed or an area at a particular time of year, with no allowance made for long-term climatic trends. Various methods are in use for estimation of PMP over a target location corresponding to different durations. Moisture maximization method and Hershfield method are two widely used methods. The former method maximizes the observed storms assuming that the atmospheric moisture would rise up to a very high value estimated based on the maximum daily dew point temperature. On the other hand, the latter method is a statistical method based on a general frequency equation given by Chow. The present study provides one-day PMP estimates and PMP maps for Mahanadi river basin based on the aforementioned methods. There is a need for such estimates and maps, as the river basin is prone to frequent floods. Utility of the constructed PMP maps in computing PMP for various catchments in the river basin is demonstrated. The PMP estimates can eventually be used to arrive at PMF estimates for those catchments. (C) 2015 The Authors. Published by Elsevier B.V.
Resumo:
This is a report to the California Department of Parks and Recreation. It describes water quality and aquatic invertebrate monitoring after the construction of the Carmel River Lagoon Enhancement Project. Included are data that have been collected for two years and preliminary assessment of the enhanced ecosystem. This report marks the completion of 3-years of monitoring water quality and aquatic habitat. The report adopts the same format and certain background text from previous years’ reporting by the same research group (e.g. Larson et al., 2005). (Document contains 100 pages)
Resumo:
In summer and fall 2004, the California Department of Parks and Recreation (DPR) initiated the Carmel River Lagoon Enhancement Project. The project involved excavation of a dry remnant Arm of the lagoon and adjacent disused farmland to form a significant new lagoon volume. The intention was to provide habitat, in particular, for two Federally threatened species: the California Red-Legged Frog, and the Steelhead Trout (South Central-Coastal California Evolutionary Significant Unit). DPR contracted with the Foundation of California State University Monterey Bay (Central Coast Watershed Studies Team, Watershed Institute) to monitor water quality and aquatic invertebrates in association with the enhancement, and to attempt to monitor steelhead using novel video techniques. The monitoring objective was to assess whether the enhancement was successful in providing habitat with good water quality, adequate invertebrate food for steelhead, and ultimately the presence of steelhead. (Document contains 102 pages)
Resumo:
This paper provides a review of the valuation of river fisheries in West and Central Africa. It is the general perception that, compared to the biological and ecological aspects of river fisheries, this particular subject area has received relatively little attention. Economic valuation is concerned with finding expression for what is important in life for human society. It should, therefore, be a central and integral part of government decision-making and policy. The review started with concepts and methods for valuation. Three main types of valuation techniques were identified: conventional economic valuations, economic impact assessments and socioeconomic investigations, and livelihood analysis. On the basis of a literature review, valuation information was then synthesized for the major regional river basins and large lakes, and also used to develop a series of national fisheries profiles. To supplement this broad perspective, a series of case studies are also presented, which focus in particular on the impact of changes in water management regime. Finally, the paper presents an assessment of the three main types of valuation methodology and a set of conclusions and recommendations for future valuation studies.
Resumo:
In recent years, difficulties encountered in obtaining ground-water supplies with acceptable chemical characteristics in the Myakka River basin area led to the implementation of a test drilling program. Under this program, well drilling and data collection were executed in such a manner that all water-producing zones of the local aquifers, together with the quality and quantity of the water available, were effectively identified. A step-drilling method was utilized which allowed the collection of formation cuttings, water samples, and water-level data, from isolated zones in the well as drilling proceeded. The step drilling procedure is described. The driller's logs, geophysical logs, and chemical quality of water tables are presented.(Document has 66 pages.)