949 resultados para Bridge whist.
Resumo:
The description of the image reads "(4)-8972-General view of Falls from new steel bridge - Maid of the Mist at landing - Niagara, U.S.A." The reverse of the image includes the description, "We are standing on the new steel bridge over Niagara River, 190 feet above the water and looking a little west of south, up the river towards Lake Erie. The high cliff at the extreme left, on the American side, is Prospect Point, where a crowd is gathered at this moment to view the Falls that we see just beyond Prospect Point. That dark, tree-covered mass of rock beyond is Goat Island; and just this side of Goat Island we see a bit of its precipice has been cut off separate from the rest by the powerful current of the waters - the smaller portion is Luna Island, and the Luna Falls go pouring down between the two islands. The face of the precipice curves inward beneath the Luna Falls leaving behind the 160 foot sheet of water the unearthly hollow known as the Cave of the Winds. Beyond Goat Island we see the gigantic curve of the Horseshoe Falls, 3,010 feet long and 158 feet high, reaching around through the clouds of spray to the farther Canadian shore. (The boundary line between British and American territory is in mid-stream.) It has been estimated that every minute 375,000 tons of water pour over these Horseshoe Falls, and they are wearing away the cliffs, moving back up the stream at the rate of 2.4 feet per year. It was probably only about a thousand years ago that they took their plunge just about where we stand now. Down there below us, at the wharf is the Maid of the Mist at the American landing taking on passengers who have come down the steep bank by the inclined railway. Its course takes it through those clouds of spray almost to the very foot of both Falls, - waters falling from 167 feet overhead, and water surging at least as many feet deep under the staunch little vessel. See special 'keyed' maps of Niagara pub. by Underwood and Underwood, also the Niagara Book by Mark Twain, W.D. Howells and others."
Resumo:
Clipping regarding the original road allowance which was part of Mr. Woodruff’s property, n.d. Clipping regarding the Lock 2 Bridge. This is a letter to the editor of the Journal from Calvin Phelps of Lockport, Nov. 13, 1889. Clipping entitled “Settled beyond a Dispute”: a letter to the Editor of the Star from J. G. Currie regarding the road allowance in the 5th Concession of Grantham, Nov. 16, 1889. Clipping entitled “That Old Road Allowance” which is a rebuttal to Mr. Currie’s letter, [1889] 2 newspaper clippings regarding: “Reg. vs. Toronto Railway Company”. These 2 articles are glued to a piece of paper. Beneath the newspaper articles is the name M. Chambers, Nov. 18, 1898. Notes regarding the clippings are enclosed with the articles. These notes and written on the back of “Pattison, Collier and Shaw Barristers, Solicitors, Etc.” stationary (notes are 2 pages, handwritten), Nov. 18, 1898. Clipping entitled “History on the Site: St. Davids’ Students Learn Lessons where Events Occurred” (2 copies), n.d.
Resumo:
Letter (10 typed pages) addressed to Press and Radio Friends which is attached to an informal history of the Whirlpool Rapids Bridge. The letter was sent from A.E. Parsons, manager of the Whirlpool Rapids Bridge, n.d.
Resumo:
Mr. Woodward’s timetable regarding the suspension bridge to Toronto via the Great Western Railway and Port Dalhousie Railway (1 page, handwritten), Jan. 22, 1856
Resumo:
Chart outlining Port Dalhousie and Thorold Railway cost of planks, bridge, railway crossing and approaches thereto, n.d.
Resumo:
Unsigned letter to Charles Stuart, clerk of the municipality of the township of Thorold regarding the proposed line of macadamized road from Hurst’s Bridge to Port Robinson (1 ¼ pages, handwritten), May 9, 1855.
Resumo:
Letter of request to Charles Stuart from S.D. Woodruff for payment for expenses for surveying the macadamized road from Port Robinson to Hurst’s Bridge, July 4, 1855.
Resumo:
Sketch of the bridge over Hurst’s Point and calculations about the bridge over the pond at Allenburgh, n.d.
Resumo:
Chart of the bill of timber for the railway bridge near Hurst’s, signed by S.D. Woodruff, Oct. 15, 1855.
Resumo:
Sketch of the height of the piles driven for the bridge across Chippewa Creek at Port Robinson, Jan. 3, 1856.
Resumo:
Unsigned letter to John Williams stating that before the return of the final estimate, the arch of the bridge must be completed, Sept. 19, 1857
Resumo:
Letter to S.D. Woodruff from Fred Holmes stating that there are 4 bents in the Port Robinson Bridge over the Chippawa. This is more than are shown in the plan, Oct. 5, 1857.
Resumo:
Letter to S.D. Woodruff stating the total quantity of timber plank in the Port Robinson Bridge at Chippawa. This is signed by Fred Holmes, Oct. 6, 1857.
Resumo:
Calculations regarding the bridge crossing Chippawa (1 page, penciled calculations), n.d.
Resumo:
This document is very badly burned, it includes: a schedule of construction, May 28, 1855 and value of work used for constructing the bridge crossing at Chippawa Creek, Oct. 1857. It is signed by S.D. Woodruff (3 pages, handwritten). Almost all text is illegible, 1857