841 resultados para software project management


Relevância:

90.00% 90.00%

Publicador:

Resumo:

As business environments become even more competitive, project teams are required to make an effort to operate external linkages from within an organization or across organizational boundaries. Nevertheless, some members boundary-span less extensively, isolating themselves and their project teams from external environments. Our study examines why some members boundary-span more or less through the framework of group attachment theory. Data from 521 project-team members in construction and engineering industries revealed that the more individuals worry about their project team’s acceptance (group attachment anxiety), the more likely they are to perceive intergroup competition, and thus put more efforts into operating external linkages and resources to help their own teams outperform competitors. In contrast, a tendency to distrust their project teams (group attachment avoidance) generates members’ negative construal of their team’s external image, and thus fewer efforts are made at operating external linkages. Thus, project leaders and members with high group-attachment-anxiety may be best qualified for external tasks.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The concession agreement is the core feature of BOT projects, with the concession period being the most essential feature in determining the time span of the various rights, obligations and responsibilities of the government and concessionaire. Concession period design is therefore crucial for financial viability and determining the benefit/cost allocation between the host government and the concessionaire. However, while the concession period and project life span are essentially interdependent, most methods to date consider their determination as contiguous events that are determined exogenously. Moreover, these methods seldom consider the, often uncertain, social benefits and costs involved that are critical in defining, pricing and distributing benefits and costs between the various parties and evaluating potentially distributable cash flows. In this paper, we present the results of the first stage of a research project aimed at determining the optimal build-operate-transfer (BOT) project life span and concession period endogenously and interdependently by maximizing the combined benefits of stakeholders. Based on the estimation of the economic and social development involved, a negotiation space of the concession period interval is obtained, with its lower boundary creating the desired financial return for the private investors and its upper boundary ensuring the economic feasibility of the host government as well as the maximized welfare within the project life. The outcome of the new quantitative model is considered as a suitable basis for future field trials prior to implementation. The structure and details of the model are provided in the paper with Hong Kong tunnel project as a case study to demonstrate its detailed application. The basic contributions of the paper to the theory of construction procurement are that the project life span and concession period are determined jointly and the social benefits taken into account in the examination of project financial benefits. In practical terms, the model goes beyond the current practice of linear-process thinking and should enable engineering consultants to provide project information more rationally and accurately to BOT project bidders and increase the government's prospects of successfully entering into a contract with a concessionaire. This is expected to generate more negotiation space for the government and concessionaire in determining the major socioeconomic features of individual BOT contracts when negotiating the concession period. As a result, the use of the model should increase the total benefit to both parties.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

A key trait of Free and Open Source Software (FOSS) development is its distributed nature. Nevertheless, two project-level operations, the fork and the merge of program code, are among the least well understood events in the lifespan of a FOSS project. Some projects have explicitly adopted these operations as the primary means of concurrent development. In this study, we examine the effect of highly distributed software development, is found in the Linux kernel project, on collection and modelling of software development data. We find that distributed development calls for sophisticated temporal modelling techniques where several versions of the source code tree can exist at once. Attention must be turned towards the methods of quality assurance and peer review that projects employ to manage these parallel source trees. Our analysis indicates that two new metrics, fork rate and merge rate, could be useful for determining the role of distributed version control systems in FOSS projects. The study presents a preliminary data set consisting of version control and mailing list data.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

A key trait of Free and Open Source Software (FOSS) development is its distributed nature. Nevertheless, two project-level operations, the fork and the merge of program code, are among the least well understood events in the lifespan of a FOSS project. Some projects have explicitly adopted these operations as the primary means of concurrent development. In this study, we examine the effect of highly distributed software development, is found in the Linux kernel project, on collection and modelling of software development data. We find that distributed development calls for sophisticated temporal modelling techniques where several versions of the source code tree can exist at once. Attention must be turned towards the methods of quality assurance and peer review that projects employ to manage these parallel source trees. Our analysis indicates that two new metrics, fork rate and merge rate, could be useful for determining the role of distributed version control systems in FOSS projects. The study presents a preliminary data set consisting of version control and mailing list data.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The driving force behind this study is the gap between the reality of the firms engaged in project business and the available studies covering project management and business process development. Previous studies show that project-based organizations were ‘immature’ in terms of the project-management ‘maturity model’, as few firms were found to be optimizing processes. Even within those, very little attention was paid to combine inter-organizational and intra-organizational perspectives. In this study an effort is made to elaborate some thoughts and views on project management, which interrelate firms’ external and internal activities. In line with the integration, the dissertation uses an approach to the management of project-business interdependencies in the networks of actors, activities and resources. Firstly, the study develops an understanding for inter-organizational perspectives by exploring the complementarities of process activities in the basic development of project business. It presents a framework that is elaborated on the basis of the reciprocal interactions of activities within and outside the organization—thus providing a coherent basis for continuous business-process improvement. In addition, the study presents new tools that can be used to develop project-business processes in each of its functional areas. The research demonstrates how project-business activities can be optimized using the right resources at the right time with the right actors and the right actions. The selected five articles included in this dissertation explain the basic framework for the development of project business. Each paper covers various aspects of inter-organizational and intra-organizational perspectives for project management. The study develops a valuable and procedural model for business-process improvement using the Delphi method that can be used not only in academia but also as a guide for practitioners that takes them through a series of well-defined steps when making informed, consistent and efficient changes to their business processes.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Despite thirty years of research in interorganizational networks and project business within the industrial networks approach and relationship marketing, collective capability of networks of business and other interorganizational actors has not been explicitly conceptualized and studied within the above-named approaches. This is despite the fact that the two approaches maintain that networking is one of the core strategies for the long-term survival of market actors. Recently, many scholars within the above-named approaches have emphasized that the survival of market actors is based on the strength of their networks and that inter-firm competition is being replaced by inter-network competition. Furthermore, project business is characterized by the building of goal-oriented, temporary networks whose aims, structures, and procedures are clarified and that are governed by processes of interaction as well as recurrent contracts. This study develops frameworks for studying and analysing collective network capability, i.e. collective capability created for the network of firms. The concept is first justified and positioned within the industrial networks, project business, and relationship marketing schools. An eclectic source of conceptual input is based on four major approaches to interorganizational business relationships. The study uses qualitative research and analysis, and the case report analyses the empirical phenomenon using a large number of qualitative techniques: tables, diagrams, network models, matrices etc. The study shows the high level of uniqueness and complexity of international project business. While perceived psychic distance between the parties may be small due to previous project experiences and the benefit of existing relationships, a varied number of critical events develop due to the economic and local context of the recipient country as well as the coordination demands of the large number of involved actors. The study shows that the successful creation of collective network capability led to the success of the network for the studied project. The processes and structures for creating collective network capability are encapsulated in a model of governance factors for interorganizational networks. The theoretical and management implications are summarized in seven propositions. The core implication is that project business success in unique and complex environments is achieved by accessing the capabilities of a network of actors, and project management in such environments should be built on both contractual and cooperative procedures with local recipient country parties.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The efforts involved in developing a small satellite for scientific purposes in China in recent years are introduced in the present paper. The project is arranged on a case to case principle depending upon requirements and financial support. The space technology of a satellite and rockets, which have been developed over a relatively longer period in China, have been transferred to the scientific research of small satellites for improvement of the quality requirements. The surplus payloads of the rocket and satellite are used as the payloads of the small satellite and scientific experiments at a low cost. As an example, the project of balloon satellites for atmospheric research was successfully completed in 1991. The experience of the project management is of great benefit for further organization and arrangement of other projects. Opportunities exist for surplus payloads to be used in the future, and a small satellite for magnetospheric research will be launched in 1993.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

[EN] In today s economy, innovation is considered to be one of the main driving forces behind business competitiveness, if not the most relevant one. Traditionally, the study of innovation has been addressed from different perspectives. Recently, literature on knowledge management and intellectual capital has provided new insights. Considering this, the aim of this paper is to analyze the impact of different organizational conditions i.e. structural capital on innovation capability and innovation performance, from an intellectual capital (IC) perspective. As regards innovation capability, two dimensions are considered: new idea generation and innovation project management. The population subject to study is made up of technology-based Colombian firms. In order to gather information about the relevant variables involved in the research, a questionnaire was designed and addressed to the CEOs of the companies making up the target population. The sample analyzed is made up of 69 companies and is large enough to carry out a statistical study based on structural equation modelling (partial least squares approach) using PLS-Graph software (Chin and Frye, 2003). The results obtained show that structural capital explains to a great extent both the effectiveness of the new idea generation process and of innovation project management. However, the influence of each specific organizational component making up structural capital (organizational design, organizational culture, hiring and professional development policies, innovation strategy, technological capital, and external structure) varies. Moreover, successful innovation project management is the only innovation capability dimension that exerts a significant impact on company performance.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The study was conducted to investigate the communities perception and compliance to community-based fisheries management (CBFM) in Turag-Bangshi floodplains under Kaliakoir, Gazipur District. Measures such as ban on use of the harmful fishing gears, seasonal fishing closure, halt of fry fishing, halt of dewatering of beels and the impact of establishment of sanctuaries on fish production and species diversity were introduced by MACH project. Almost all members of the communities in Turag-Bangshi MACH (Management of Aquatic Ecosystem through Community Husbandry) site welcomed the introduction and complied with the implementation of all management measures which helped stopped use of harmful fishing gears, ensured survival and breeding of brood fish in the rainy season, protected and allowed fry to grow big, restored lost and degraded fisheries and organized communities for sustainable development of the fisheries. A total of 51 species of fishes were found in Makosh beel (natural depression). Among these, small indigenous species (SIS) under Cyprinidae family (Puntius sophore) was the most dominant. Many species available in the past recorded disappeared from the Makosh beel due to loss of habitat and industrial pollution that damaged spawning and nursery grounds of fish. Introduction of some selective native endangered species (Nandus nandus, Notopterus notopterus, Ompok pabda and Labeo calbasu) by MACH in the Turag-Bangshi water bodies increased diversity of species from 82 to 95. Over a period of five years during MACH intervention, the average production remained nearly 200% higher than the baseline production of 57 kg/ha to present 207 kg/ha due to maintaining sanctuaries and the closed fishing seasons. Per capita daily fish consumption of the surrounding communities also increased by 78% (from 27 to 48 g/person/day) which is much higher than the national average fish consumption in Bangladesh. The implementation of community-based MACH project management measures substantially improved fish habitat, production, consumption and socio-economic conditions of the surrounding communities. The model can be used to improve the floodplains of Bangladesh.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This book explores the processes for retrieval, classification, and integration of construction images in AEC/FM model based systems. The author describes a combination of techniques from the areas of image and video processing, computer vision, information retrieval, statistics and content-based image and video retrieval that have been integrated into a novel method for the retrieval of related construction site image data from components of a project model. This method has been tested on available construction site images from a variety of sources like past and current building construction and transportation projects and is able to automatically classify, store, integrate and retrieve image data files in inter-organizational systems so as to allow their usage in project management related tasks. objects. Therefore, automated methods for the integration of construction images are important for construction information management. During this research, processes for retrieval, classification, and integration of construction images in AEC/FM model based systems have been explored. Specifically, a combination of techniques from the areas of image and video processing, computer vision, information retrieval, statistics and content-based image and video retrieval have been deployed in order to develop a methodology for the retrieval of related construction site image data from components of a project model. This method has been tested on available construction site images from a variety of sources like past and current building construction and transportation projects and is able to automatically classify, store, integrate and retrieve image data files in inter-organizational systems so as to allow their usage in project management related tasks.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The Architecture, Engineering, Construction and Facilities Management (AEC/FM) industry is rapidly becoming a multidisciplinary, multinational and multi-billion dollar economy, involving large numbers of actors working concurrently at different locations and using heterogeneous software and hardware technologies. Since the beginning of the last decade, a great deal of effort has been spent within the field of construction IT in order to integrate data and information from most computer tools used to carry out engineering projects. For this purpose, a number of integration models have been developed, like web-centric systems and construction project modeling, a useful approach in representing construction projects and integrating data from various civil engineering applications. In the modern, distributed and dynamic construction environment it is important to retrieve and exchange information from different sources and in different data formats in order to improve the processes supported by these systems. Previous research demonstrated that a major hurdle in AEC/FM data integration in such systems is caused by its variety of data types and that a significant part of the data is stored in semi-structured or unstructured formats. Therefore, new integrative approaches are needed to handle non-structured data types like images and text files. This research is focused on the integration of construction site images. These images are a significant part of the construction documentation with thousands stored in site photographs logs of large scale projects. However, locating and identifying such data needed for the important decision making processes is a very hard and time-consuming task, while so far, there are no automated methods for associating them with other related objects. Therefore, automated methods for the integration of construction images are important for construction information management. During this research, processes for retrieval, classification, and integration of construction images in AEC/FM model based systems have been explored. Specifically, a combination of techniques from the areas of image and video processing, computer vision, information retrieval, statistics and content-based image and video retrieval have been deployed in order to develop a methodology for the retrieval of related construction site image data from components of a project model. This method has been tested on available construction site images from a variety of sources like past and current building construction and transportation projects and is able to automatically classify, store, integrate and retrieve image data files in inter-organizational systems so as to allow their usage in project management related tasks.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Ontologies play a core role to provide shared knowledge models to semantic-driven applications targeted by Semantic Web. Ontology metrics become an important area because they can help ontology engineers to assess ontology and better control project management and development of ontology based systems, and therefore reduce the risk of project failures. In this paper, we propose a set of ontology cohesion metrics which focuses on measuring (possibly inconsistent) ontologies in the context of dynamic and changing Web. They are: Number of Ontology Partitions (NOP), Number of Minimally Inconsistent Subsets (NMIS) and Average Value of Axiom Inconsistencies (AVAI). These ontology metrics are used to measure ontological semantics rather than ontological structure. They are theoretically validated for ensuring their theoretical soundness, and further empirically validated by a standard test set of debugging ontologies. The related algorithms to compute these ontology metrics also are discussed. These metrics proposed in this paper can be used as a very useful complementarity of existing ontology cohesion metrics.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

针对软件项目存在"产品进度延误,费用剧增"的问题,以挣值法作为理论基础,结合软件项目的开发过程,通过应用挣值法的计划投资额、实际投资额、完成投资额三个关键中间变量,费用偏差、进度偏差二个差异分析变量指标和成本偏差率、进度偏差二个指标变量的指标统计分析软件项目成本花费、进度执行情况,为软件项目成本、进度的联合监控提供依据,使项目管理工作目标清晰,过程控制高效有序,从整体上良好地把握了软件项目的运行状态,实现了对软件项目成本和进度的监控.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

软件开发是一项高度复杂的活动,涉及到人员、过程、产品、客户等多种因素,这些因素中存在着大量的不确定性,在软件项目中表现为风险。风险能够给软件项目带来严重的危害,造成工程延期、成本超支、软件产品质量低下等各种问题,因此软件项目管理者必须对软件项目风险进行有效的管理。 软件项目风险管理是软件项目管理中不可或缺的重要组成部分,但是在实际的软件项目中,软件项目风险管理却常常被忽略,很多项目管理者凭自己的经验和直觉来管理软件项目风险。造成这种现象的原因除了软件企业的文化因素外,主要是因为软件项目管理者缺少操作层面上有效的风险管理方法和工具。 软件过程仿真能够分析软件过程的动态行为特性,预测软件过程执行的性能,是一种很好的软件项目分析和管理工具。软件过程仿真已经广泛应用于包括风险管理在内的软件项目管理的多个方面。多项研究已经表明软件过程仿真作为一种有效的风险管理方法和工具,能够很好的支持软件项目风险管理过程。 为了指导软件项目管理者使用软件过程仿真进行风险管理,本文提出了一种基于软件过程仿真的软件项目风险管理方法(SPS-RM)。该方法是一种使用软件过程仿真进行软件项目风险管理的通用方法框架,实现了“风险监控风险影响分析风险解决”的风险管理过程,并且为每个风险管理活动都提供了相应的过程仿真模型。SPS-RM方法还包括使用软件过程仿真进行风险管理的通用步骤,以及建立和分析过程仿真模型的一般方法,并为模型、步骤和方法都提供了详细的指导说明。 本文的主要贡献包括: 对软件过程仿真在软件项目风险管理中的应用和研究现状进行了调研。调研的目的是为了获得当前的研究进展,找出目前存在的问题,并指出未来可能的研究方向。调研的结果为本文的研究方向提供了很好的指导,也为本文的具体研究内容提供了良好的理论和实际依据。 提出了一种基于软件过程仿真的软件项目风险管理方法(SPS-RM)。该方法是一个使用软件过程仿真进行软件项目风险管理的通用方法框架,其目的是指导广大的软件项目管理者使用软件过程仿真有效的管理软件项目风险。SPS-RM是本文的核心方法,后面对两个具体风险的研究都是基于该方法进行的。 提出了需求变更风险分析仿真方法(RVSim)。需求变更是一种在软件项目中常见的、对软件项目影响较大的风险。本文基于SPS-RM方法对需求变更风险进行研究,提出了需求变更风险分析仿真方法。该方法以需求的横向和纵向跟踪信息为基础,对需求变更的处理过程进行仿真,能够量化的给出单个需求变更或者一系列需求变更对软件项目的时间和工作量的影响,帮助项目管理者更好的理解和管理需求变更风险。 提出了人员离职风险解决仿真方法(LF-ETRS)。人员离职是软件项目中的另一个重要风险。本文基于SPS-RM方法对人员离职风险进行研究,提出了人员离职风险解决仿真方法。该方法的主要特点是首次在对软件项目中的人员进行建模时同时考虑了人的学习和遗忘行为,因此能够更加准确的预测人员替代所需的时间和成本。另外,该方法还考虑了除人员替代外的其他解决措施,通过对多种解决措施进行建模和仿真,项目管理者可以根据项目的实际情况和仿真结果选择最合适的措施来解决人员离职风险。

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Univ SE Calif, Ctr Syst & Software Engn, ABB, Microsoft Res, IEEE, ACMSIGSOFT, N Carolina State Univ Comp Sci