891 resultados para The 7pm Project


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Sea floor morphology plays an important role in many scientific disciplines such as ecology, hydrology and sedimentology since geomorphic features can act as physical controls for e.g. species distribution, oceanographically flow-path estimations or sedimentation processes. In this study, we provide a terrain analysis of the Weddell Sea based on the 500 m × 500 m resolution bathymetry data provided by the mapping project IBCSO. Seventeen seabed classes are recognized at the sea floor based on a fine and broad scale Benthic Positioning Index calculation highlighting the diversity of the glacially carved shelf. Beside the morphology, slope, aspect, terrain rugosity and hillshade were calculated. Applying zonal statistics to the geomorphic features identified unambiguously the shelf edge of the Weddell Sea with a width of 45-70 km and a mean depth of about 1200 m ranging from 270 m to 4300 m. A complex morphology of troughs, flat ridges, pinnacles, steep slopes, seamounts, outcrops, and narrow ridges, structures with approx. 5-7 km width, build an approx. 40-70 km long swath along the shelf edge. The study shows where scarps and depressions control the connection between shelf and abyssal and where high and low declination within the scarps e.g. occur. For evaluation purpose, 428 grain size samples were added to the seabed class map. The mean values of mud, sand and gravel of those samples falling into a single seabed class was calculated, respectively, and assigned to a sediment texture class according to a common sediment classification scheme.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study analyses the effects that the project management certification has on employability. This analysis started with a participative process in which various groups of experts who are involved in the certification of people were consulted. A personal interview was carried out amongst 106 professionals —certifying bodies, training institutions, the civil service, and international organisations— and amongst professional who are certified in project management by the International Project Management Association in Spain. The results show that the certification emerges as a powerful tool for improving employability. The effects are demonstrated across two complementary aspects: internal company aspects and external aspects relating to the labour market. Finally, by compiling the different agents’ opinions, a series of measures emerge for improving the accreditation processes as an employability tool and increasing the mutual learning between public and private actors.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In the year 1999 approves the Law of Construction Building (LOE, in Spanish) to regulate a sector such as construction, which contained some shortcomings from the legal point of view. Currently, the LOE has been in force 12 years, changing the spanish world of the construction, due to influenced by internationalization. Within the LOE, there regulating the different actors involved in the construction building, as the Projects design, the Director of Construction, the developer, The builder, Director of execution of the construction (actor only in Spain, similar as construcion engineer and abroad in), control entities and the users, but lacks figure Project manager will assume the delegation of the promoter helping and you organize, direct and management the process. This figure assumes that the market and contracts are not legally regulated in Spain, then should define and establish its regulation in the LOE. (Spain Construction Law) The translation in spanish of the words "Project Manager is owed to Professor Rafael de Heredia in his book Integrated Project Management, as agent acting on behalf of the organization and promoter assuming control of the project, ie Integraded Project Management . Already exist in Spain, AEDIP (Spanish Association Integrated of Project Construction management) which comprises the major companies in “Project Management” in Spain, and MeDIP (Master in Integrated Construction Project) the largest and most advanced studies at the Polytechnic University of Madrid, in "Construction Project Management" they teach which is also in Argentina. The Integrated Project ("Project Management") applied to the construction process is a methodological technique that helps to organize, control and manage the resources of the promoters in the building process. When resources are limited (which is usually most situations) to manage them efficiently becomes very important. Well, we find that in this situation, the resources are not only limited, but it is limited, so a comprehensive control and monitoring of them becomes not only important if not crucial. The alternative of starting from scratch with a team that specializes in developing these follow directly intervening to ensure that scarce resources are used in the best possible way requires the use of a specific methodology (Manual DIP, Matrix Foreign EDR breakdown structure EDP Project, Risk Management and Control, Design Management, et ..), that is the methodology used by "Projects managers" to ensure that the initial objectives of the promoters or investors are met and all actors in process, from design to construction company have the mind aim of the project will do, trying to get their interests do not prevail over the interests of the project. Among the agents listed in the building process, "Project Management" or DIPE (Director Comprehensive building process, a proposed name for possible incorporation into the LOE, ) currently not listed as such in the LOE (Act on Construction Planning ), one of the agents that exist within the building process is not regulated from the legal point of view, no obligations, ie, as is required by law to have a project, a builder, a construction management, etc. DIPE only one who wants to hire you as have been advanced knowledge of their services by the clients they have been hiring these agents, there being no legal obligation as mentioned above, then the market is dictating its ruling on this new figure, as if it were necessary, he was not hired and eventually disappeared from the building process. As the aim of this article is regular the process and implement the name of DIPE in the Spanish Law of buildings construction (LOE)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Within the subproject 3 of the NURISP project three neutron kinetic codes have been implemented into the NURESIM platform. For all three codes (CRONOS2, COBAYA3 and DYN3D) the coupling with the thermal hydraulic code FLICA4 was accomplished using the features of the NURESIM platform. This paper contains the results obtained with COBAYA3/FLICA4 coupled codes for the PWR boron dilution benchmark defined within the sub project 3 of the NURISP project. Results are provided for all the scenarios.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The increasing ageing population is demanding new care approaches to maintain the quality of life of elderly people. Informal carers are becoming crucial agents in the care and support of elderly people, which can lead to those carers suffering from additional stress due to competing priorities with employment or due to lack of knowledge about elderly people?s care needs. Thus, support and stress relief in carers should be a key issue in the home-care process of these older adults. Considering this context, this work presents the iCarer project aimed at developing a personalized and adaptive platform to offer informal carers support by means of monitoring their activities of daily care and psychological state, as well as providing an orientation to help them improve the care provided. Additionally, iCarer will provide e-Learning services and an informal carers learning network. As a result, carers will be able to expand their knowledge, supported by the experience provided by expert counsellors and fellow carers. Additionally, the coordination between formal and informal carers will be improved, offering the informal carers flexibility to organize and combine their assistance and social activities.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The main goal of the cofounded by the European Commission LIFE Project, New4Old (LIFE10 ENV/ES/439), is to define the most appropriate method and the best available practice in social housing rehabilitation with energy and environmental sustainability criteria, as well as to apply innovative technologies in the fight against climate change through an efficient use of resources and energy. The institutions involved in the Project are the Technological Centre AITEMIN, Madrid Polytechnic University (UPM), Portugal Technological Centre for Ceramics and Glass (CTCV) and the Zaragoza City Housing Society (SMZV). The demonstrator project consists in the energy rehabilitation of a rental social housing building located in Zaragoza?s historic quarter, according to the conclusions and strategies developed for the LIFE project. In actions taken in households of this nature passive design strategies are essential due to the limited income of owners, who often cannot afford energy bills. Therefore, the proposed actions will help improve the building?s passive performance and reach a higher thermal comfort, without increasing the economic cost linked to energy consumption.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In recent years, coinciding with adjustments to the Bologna process, many European universities have attempted to improve their international profile by increasing course offerings in English. According to the Institute of International Education (IIE), Spain has notably increased its English-taught higher education programs, ranking fifth in the list of European countries by number of English-taught Master's programs in 2013. This article presents the goals and preliminary results of an on-going innovative education project (TechEnglish) that aims to promote course offerings in English at the Technical University of Madrid (Universidad Politécnica de Madrid, UPM). The UPM is the oldest and largest of all Technical Universities in Spain. It offers graduate and postgraduate programs that cover all the engineering disciplines as well as architecture. Currently, the UPM has no specific bilingual/multilingual program to promote teaching in English, although there is an Educational Model Whitepaper (with a focus on undergraduate degrees) that promotes the development of activities like an International Semester or a unique shared curriculum. The TechEnglish project is an attempt to foster courses taught in English at 7 UPM Technical Schools, including students and 80 faculty members. Four tasks were identified: (1) to design a university wide framework to increase course offerings, (2) to identify administrative difficulties, (3) to increase visibility of courses offered, and (4) to disseminate the results of the project. First, to design a program we analyzed existing programs at other Spanish universities, and other projects and efforts already under way at the UPM. A total of 13 plans were analyzed and classified according to their relation with students (learning), professors (teaching), administration, course offerings, other actors/institutions within the university (e.g., language departments), funds and projects, dissemination activities, mobility plans and quality control. Second, to begin to identify administrative and organizational difficulties in the implementation of teaching in English, we first estimated the current and potential course offerings at the undergraduate level at the UPM using a survey (student, teacher and administrative demand, level of English and willingness to work in English). Third, to make the course offerings more attractive for both Spanish and international students we examined the way the most prestigious universities in Spain and in Europe try to improve the visibility of their academic offerings in English. Finally, to disseminate the results of the project we created a web page and a workspace on the Moodle education platform and prepared conferences and workshops within the UPM. Preliminary results show that increasing course offerings in English is an important step to promote the internationalization of the University. The main difficulties identified at the UPM were related to how to acknowledge/certify the departments, teachers or students involved in English courses, how students should register for the courses, how departments should split and schedule the courses (Spanish and English), and the lack of qualified personnel. A concerted effort could be made to increase the visibility of English-taught programs offered on-line.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

To date, the negotiations over chemicals in the Translatlantic Trade and Investment Partnership (TTIP) have not shown sufficient ambition. The talks have focused too much on the differences in the two ‘systems’, rather than on the actual levels of health and environmental protection for substances regulated by both the US and the EU. Given the accomplishments within the OECD and the UN Globally Harmonised System of Classification and Labelling of Chemicals (GHS), the question is whether TTIP can be any more ambitious in the area of chemicals? We find that there is no detailed or systematic knowledge about how the two levels of protection in chemicals compare, although caricatures and stereotypes abound. This is partly due to an obsessive focus on a single US federal law, the Toxic Subtances Control Act (TSCA), whereas in practice US protection depends on many statutes and regulations, as well as on voluntary withdrawals (under pressure from the Environmental Protection Agency) and severe common law liability. This paper makes the economic case for firmly addressing the regulatory barriers, discusses the EU’s proposals, finds that the European Parliament’s Resolution on TTIP of July 2015 lacks a rationale (for chemicals), argues that both TSCA and REACH ought to be improved (based on ‘better regulation’), discusses the link with a global regime, advocates significant improvement of market access where equivalence of health and environmental objectives is agreed and, finally, proposes to lower the costs for companies selling in both markets by allowing them to opt into the other party’s more stringent rules, thereby avoiding duplication while racing-to-the-top. The ‘living agreement’ on chemicals ought to be led by a new TTIP institution authorised to establish the level of health and environmental protection on both sides of the Atlantic for substances regulated on both sides. These findings will lay the foundation for a highly beneficial lowering of trading costs without in any way affecting the level of protection. Indeed, this is exactly what TTIP is, or should be, all about.This paper is the 10th in a series produced in the context of the “TTIP in the Balance” project, jointly organised by CEPS and the Center for Transatlantic Relations (CTR) in Washington, D.C. It is published simultaneously on the CEPS (www.ceps.eu) and CTR websites (http://transatlantic.sais-jhu.edu).

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This presentation is about the inside story of the PhD project El malagueño real, mental y virtual. Configuración de los significados sociales de una variedad urbana in Hispanic Linguistics. That is, the production and perception of the Spanish spoken in the city of Malaga and used on the social network sites Facebook and Tuenti by users from Malaga is analysed. Actually, the southern Spanish variety in question is quite distinct from the national standard in terms of its phonetic features, its prestige, and the attitudes to it. Thus, the project started with the initial interest in «Why do people often communicate in very “strange” ways on social media» which then slightly changed to the final research interest in «What do the different non-standard variants mean in virtual (and real) malagueño?». This long – sometimes hazardous, yet mostly fun – process is exposed in more detail by looking at the research questions, the methods and results. Lastly, the presentation concludes with some lessons learnt and an outlook on possibilities and necessities for further investigation.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Report of the Committee on the Organization of the Inter- American System.--Report of the Juridical Subcommittee on the project of Inter-American peace system submitted by the Inter-American Juridical Committee on November 18, 1947.-- Comments on the draft project of Inter-American peace system formulated by the Inter-American Juridical Committee in 1945.-- Memorandum on the definite project of an inter-American peace system formulated by the Inter-American Juridical Committee, by C. G. Fenwick.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In 1999, the Department of Health in Western Australia began a telehealth project, which finished in 2004. The 75 videoconferencing sites funded by the project were part of a total state-wide videoconference network of 104 sites. During the period from January 2002 to December 2003, a total of 3266 consultations, case reviews and patient education sessions took place. Clinical use grew to 30% of all telehealth activity. Educational use was approximately 40% (1416 sessions) and management use was about 30% (1031 sessions). The average overhead cost per telehealth session across all regions and usage types was $A192. Meaningful comparisons of the results of the present study with other public health providers were difficult, because many of the available Websites on telehealth were out of date. Despite the successful use of telehealth to deliver clinical services in Western Australia, sustaining the effort in the post-project phase will present significant challenges.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper describes the use of a web-site for the dissemination of the community-based '10,000 steps' program which was originally developed and evaluated in Rockhampton, Queensland in 2001-2003. The website provides information and interactive activities for individuals, and promotes resources and programs for health promotion professionals. The dissemination activity was assessed in terms of program adoption and implementation. In a 2-year period (May 2004-March 2006) more than 18,000 people registered as users of the web-site (togging more than 8.5 billion steps) and almost 100 workplaces and 13 communities implemented aspects of the 10,000 steps program. These data support the use of the internet as an effective means of disseminating ideas and resources beyond the geographical borders of the original project. Following this preliminary dissemination, there remains a need for the systematic study of different dissemination strategies, so that evidence-based physical activity programs can be translated into more widespread public health practice. (c) 2006 Sports Medicine Australia. Published by Elsevier Ltd. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In 2004, the Royal Pharmaceutical Society of Great Britain (RPSGB) funded research on teaching, learning and assessment within the UK undergraduate pharmacy degree (MPharm), including the compulsory final year project. Documentary analysis showed that all schools met the project requirement, although there were wide variations in the relative contribution of the project to the final year mark and the degree classification. Interviews with staff revealed that organisation of research projects was complex and time consuming and exacerbated by increasing student numbers and the impact of research ethics. 61% of students, surveyed via a self-completion questionnaire (response rate 50.6%) perceived the research project to be very or fairly important. Whilst 47% considered that they had enough choice of topic and 37% said that their training in research methods provided a good foundation for their project, this suggests scope for improvement. In the UK, there are legislative changes impending which may provide an opportunity to review the future purpose and feasibility of a "significant" final year project within the MPharm.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

For many decades, the Kingdom of Saudi Arabia has been widely known for being a reliable oil exporter. This fact, however, has not exempted it from facing significant domestic energy challenges. One of the most pressing of these challenges involves bridging the widening electricity supply-demand gap where, currently, the demand is growing at a very fast rate. One crucial means to address this challenge is through delivering power supply projects with maximum efficiency. Project delivery delay, however, is not uncommon in this highly capital-intensive industry, indicating electricity supplies are not coping with the demand increases. To provide a deeper insight into the challenges of project implementation and efficient practice, this research adopts a pragmatic approach by triangulating literature, questionnaires and semi-structured interviews. The research was conducted in the Saudi Arabian power supply industry – Western Operating Area. A total of 105 usable questionnaires were collected, and 28 recorded, semi-structured interviews were conducted, analysed and synthesised to produce a conceptual model of what constitutes the project implementation challenges in the investigated industry. This was achieved by conducting a comprehensive ranking analysis applied to all 58 identified and surveyed factors which, according to project practitioners in the investigated industry, contribute to project delay. 28 of these project delay factors were selected as the "most important" ones. Factor Analysis was employed to structure these 28 most important project delay factors into the following meaningful set of 7 project implementation challenges: Saudi Electricity Company's contractual commitments, Saudi Electricity Company's communication and coordination effectiveness, contractors' project planning and project control effectiveness, consultant-related aspects, manpower challenges and material uncertainties, Saudi Electricity Company's tendering system, and lack of project requirements clarity. The study has implications for industry policy in that it provides a coherent assessment of the key project stakeholders' central problems. From this analysis, pragmatic recommendations are proposed that, if enacted, will minimise the significance of the identified problems on future project outcomes, thus helping to ensure the electricity supply-demand gap is diminished.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aim of this study is to address the main deficiencies with the prevailing project cost and time control practices for construction projects in the UK. A questionnaire survey was carried out with 250 top companies followed by in-depth interviews with 15 experienced practitioners from these companies in order to gain further insights of the identified problems, and their experience of good practice on how these problems can be tackled. On the basis of these interviews and syntheses with literature, a list of 65 good practice recommendations have been developed for the key project control tasks: planning, monitoring, reporting and analysing. The Delphi method was then used, with the participation of a panel of 8 practitioner experts, to evaluate these improvement recommendations and to establish their degree of relevance. After two rounds of Delphi, these recommendations are put forward as "critical", "important", or "helpful" measures for improving project control practice.