969 resultados para Reactor shutdowns
Resumo:
April 17, 1963--page 11.
Resumo:
"Contract AT(30-1)-2789."
Resumo:
"Work performed under Contract No. AT(45-1)-1350 between the Atomic Energy Commission and General Electric Company."
Resumo:
Mode of access: Internet.
Resumo:
"Chemistry--Separation process for plutonium and uranium."
Resumo:
"Chemistry--Separation process for plutonium and uranium."
Resumo:
"Reactor Technology."
Resumo:
"Nuclear Power Group."
Resumo:
"Final report to Sanderson and Porter for subcontract no. S-3 under USAEC Prime Contract no. AT(30-1)-2378."
Resumo:
A total of 193 annotated references to unclassified reports on the design, development and construction of the Shippingport Pressurized Water Reactor is presented. Author, subject, and report number indexes are included.
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
Includes bibliographical references.
Resumo:
"United States Atomic Energy Commission, Savannah River Operations Office, Contract AT (38-1) 213, supplements 1 & 2."
Resumo:
Issues are simultaneously published in both the "TID" and "SL" Series, but numbering is different.