896 resultados para Project-based Organization


Relevância:

40.00% 40.00%

Publicador:

Resumo:

The objective of this study was to find out how third party influencers can facilitate value-based selling in a network and how suppliers should aim to impact on these third party influencers to facilitate value-based selling. The study considers construction industry, selling the column connection solution and third party influencers. Third party influencers examined in this study were structural designers. The study also aims to find out structural designers’ value drivers and the differences between the market areas that this study related to. The theoretical part of the study focuses on two separate areas. The first part of the theory focuses on a value-based selling concept: what it is, what it requires and what are the main barriers for value-based selling. The second part of the theory examines value creation in networks. The present knowledge over value creation in networks and different network actors are presented. Project marketing is also discussed briefly because this study’s topic, which is highly related to project business. The results reveal structural designers’ value drivers considering the usage of the column connection solution and present ways how suppliers should aim to impact structural designers to facilitate value-based selling. The main result of the study indicates that third party influencers can have a positive impact on facilitating value-based selling. Structural designers are communicating more or less with all the salient actors in different project phases and they can act as sponsors to support the sales of Peikko’s column connection solution and promote solution to other actors involved to the project. This requires that structural designers can understand the actual benefits of how the solution can improve their and their customers’ business.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Research Report Written for the Canadian Breast Cancer Foundation.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Amongst a host of other benefits, proper physical education has the possibility to create a safe place where responsibility can be transferred from the teacher/facilitator, to the student. This is especially true with an underserved population. This critical program evaluation of the program CHARM was done for the purpose of program improvement. This research was a place for participants to share their experiences of the program. The participants were 5 underserved youth, 5 undergraduate students, 3 teachers and 1 graduate student. Observations, interviews, and document analysis were used to gather data. Data was analyzed using a first level read-through, and two second-level analyses. Summaries were written, and cross-case analyses were completed. The main finding of the research was the development of a Handbook, which is a guide to running the program. Secondary findings include issues of program structure, goal setting, meaningful relationships, roles, SNAP, and an outlier in the data.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Con la creciente popularidad de las soluciones de IT como factor clave para aumentar la competitividad y la creación de valor para las empresas, la necesidad de invertir en proyectos de IT se incrementa considerablemente. La limitación de los recursos como un obstáculo para invertir ha obligado a las empresas a buscar metodologías para seleccionar y priorizar proyectos, asegurándose de que las decisiones que se toman son aquellas que van alineadas con las estrategias corporativas para asegurar la creación de valor y la maximización de los beneficios. Esta tesis proporciona los fundamentos para la implementación del Portafolio de dirección de Proyectos de IT (IT PPM) como una metodología eficaz para la gestión de proyectos basados en IT, y una herramienta para proporcionar criterios claros para los directores ejecutivos para la toma de decisiones. El documento proporciona la información acerca de cómo implementar el IT PPM en siete pasos, el análisis de los procesos y las funciones necesarias para su ejecución exitosa. Además, proporciona diferentes métodos y criterios para la selección y priorización de proyectos. Después de la parte teórica donde se describe el IT PPM, la tesis aporta un análisis del estudio de caso de una empresa farmacéutica. La empresa ya cuenta con un departamento de gestión de proyectos, pero se encontró la necesidad de implementar el IT PPM debido a su amplia cobertura de procesos End-to-End en Proyectos de IT, y la manera de asegurar la maximización de los beneficios. Con la investigación teórica y el análisis del estudio de caso, la tesis concluye con una definición práctica de un modelo aproximado IT PPM como una recomendación para su implementación en el Departamento de Gestión de Proyectos.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Industrial Organization, a Contract Based approach (aka IOCB) offers an extensive and an up-to-date panorama of Industrial Organization. It is aimed at advanced undergraduates, graduates, academics and practitioners with an interest in the field. The analysis of market interactions, business strategies and public policy is performed using the standard framework of game theory and the recent advances of contract theory and information economics

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The European Cancer Registry-based project on hematologic malignancies (HAEMACARE), set up to improve the availability and standardization of data on hematologic malignancies in Europe, used the European Cancer Registry-based project on survival and care of cancer patients (EUROCARE-4) database to produce a new grouping of hematologic neoplasma(defined by the International Classification of Diseases for Oncology, Third Edition and the 2001/2008 World Health Organization classifications) for epidemiological and public health purposes. We analyzed survival for lymphoid neoplasms in Europe by disease group, comparing survival between different European regions by age and sex. Design and Methods Incident neoplasms recorded between 1995 to 2002 in 48 population-based cancer registries in 20 countries participating in EUROCARE-4 were analyzed. The period approach was used to estimate 5-year relative survival rates for patients diagnosed in 2000-2002, who did not have 5 years of follow up. Results: The 5-year relative survival rate was 57% overall but varied markedly between the defined groups. Variation in survival within the groups was relatively limited across European regions and less than in previous years. Survival differences between men and women were small. The relative survival for patients with all lymphoid neoplasms decreased substantially after the age of 50. The proportion of ‘not otherwise specified’ diagnoses increased with advancing age.Conclusions: This is the first study to analyze survival of patients with lymphoid neoplasms, divided into groups characterized by similar epidemiological and clinical characteristics, providing a benchmark for more detailed analyses. This Europe-wide study suggests that previously noted differences in survival between regions have tended to decrease. The survival of patients with all neoplasms decreased markedly with age, while the proportion of ‘not otherwise specified’ diagnoses increased with advancing age. Thus the quality of diagnostic work-up and care decreased with age, suggesting that older patients may not be receiving optimal treatment

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Planning a project with proper considerations of all necessary factors and managing a project to ensure its successful implementation will face a lot of challenges. Initial stage in planning a project for bidding a project is costly, time consuming and usually with poor accuracy on cost and effort predictions. On the other hand, detailed information for previous projects may be buried in piles of archived documents which can be increasingly difficult to learn from the previous experiences. Project portfolio has been brought into this field aiming to improve the information sharing and management among different projects. However, the amount of information that could be shared is still limited to generic information. This paper, we report a recently developed software system COBRA to automatically generate a project plan with effort estimation of time and cost based on data collected from previous completed projects. To maximise the data sharing and management among different projects, we proposed a method of using product based planning from PRINCE2 methodology. (Automated Project Information Sharing and Management System -�COBRA) Keywords: project management, product based planning, best practice, PRINCE2

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Generally poor productivity, delays, low profitability and exceeded budgets are Common problems in modern construction management, however it seems that a basic obstacle lies far deeper in the understanding of a firm's fundamental mission, its existence. The main objective of this paper therefore is to examine the operational living of a construction firm and by doing that to reveal the key problem or the solution for a construction firm - its organization. A firm as a social system in which interactions between its constitutive components (employees) are surordinated to its maintenance (keeping a system alive) is an autopoietic social system. Two domains of external perturbations are uncovered to which a construction firm has to adapt (market driven and project driven perturbations). Constructed conceptual model of an autopoietic organization is based upon two necessary and sufficient operational domains that a firm has to create in order to become an autopoietic, adaptive social system. The first one is a domain of interactions between employees and other operationally external systems, which is representing an idea-generating domain of interactions. The second is employee's autonomous operational domain, which embodies employee's autonomy and individuality and represents a necessary condition for the establishment of an idea-generating domain. Finally, it is recognized that interactions within these four domains keep a construction firm alive.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The UK construction industry is in the process of trying to adopt a new culture based on the large-scale take up of innovative practices. Through the Demonstration Project process many organizations are implementing changed practices and learning from the experiences of others. This is probably the largest experiment in innovation in any industry in recent times. The long-term success will be measured by the effectiveness of embedding the new practices in the organization. As yet there is no recognized approach to measuring the receptivity of the organization to the innovation process as an indication of the likelihood of long-term development. The development of an appropriate approach is described here. Existing approaches to the measurement of the take up of innovation were reviewed and where appropriate used as the base for the development of a questionnaire. The questionnaire could be applicable to multi-organizational construction project situations such that the output could determine an individual organization's innovative practices via an innovation scorecard, a project team's approach or it could be used to survey a wide cross-section of the industry.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Uncertainty contributes a major part in the accuracy of a decision-making process while its inconsistency is always difficult to be solved by existing decision-making tools. Entropy has been proved to be useful to evaluate the inconsistency of uncertainty among different respondents. The study demonstrates an entropy-based financial decision support system called e-FDSS. This integrated system provides decision support to evaluate attributes (funding options and multiple risks) available in projects. Fuzzy logic theory is included in the system to deal with the qualitative aspect of these options and risks. An adaptive genetic algorithm (AGA) is also employed to solve the decision algorithm in the system in order to provide optimal and consistent rates to these attributes. Seven simplified and parallel projects from a Hong Kong construction small and medium enterprise (SME) were assessed to evaluate the system. The result shows that the system calculates risk adjusted discount rates (RADR) of projects in an objective way. These rates discount project cash flow impartially. Inconsistency of uncertainty is also successfully evaluated by the use of the entropy method. Finally, the system identifies the favourable funding options that are managed by a scheme called SME Loan Guarantee Scheme (SGS). Based on these results, resource allocation could then be optimized and the best time to start a new project could also be identified throughout the overall project life cycle.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

An unaltered rearrangement of the original computation of a neural based predictor at the algorithmic level is introduced as a new organization. Its FPGA implementation generates circuits that are 1.7 faster than a direct implementation of the original algorithm. This faster clock rate allows to implement predictors with longer history lengths using the nearly the same hardware budget.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This paper develops cycle-level FPGA circuits of an organization for a fast path-based neural branch predictor Our results suggest that practical sizes of prediction tables are limited to around 32 KB to 64 KB in current FPGA technology due mainly to FPGA area of logic resources to maintain the tables. However the predictor scales well in terms of prediction speed. Table sizes alone should not be used as the only metric for hardware budget when comparing neural-based predictor to predictors of totally different organizations. This paper also gives early evidence to shift the attention on to the recovery from mis-prediction latency rather than on prediction latency as the most critical factor impacting accuracy of predictions for this class of branch predictors.