868 resultados para Project management Computer programs
Resumo:
The Queensland Health implementation project failure is the largest IS failure in the southern hemisphere to date, costing $1.25 billion AUD. This case highlights the importance of systematically analysing project failure. It examines the case organization details, royal commission report, auditor general report and 118 witness statements pertaining to the Queensland Health implementation project. The objective of this teaching case is (1) to illustrate the factors that contributed to Queensland Health's disastrous implementation project and (2) to understand the broader applications of this project failure on state and national legislations as well as industry sectors. The case narrative and teaching notes are appropriate for both undergraduate and postgraduate students studying IS and project management subjects.
Resumo:
In today's high-pressure work environment, project managers are often forced to “do more with less.” We argue that this imperative can lead project managers to engage in either high-performance or abusive supervision behaviors. To understand this process, we develop a model and associated propositions linking a project manager's cognitive appraisal of project-related demands to high-performance work practices versus abusive supervision behaviors—both of which impact three project outcomes: stakeholder relationships, people-related project success factors, and employee well-being. We propose that the choice between high-performance work practices and abusive supervision behaviors is moderated by a project manager's personal resources (psychological capital, emotional intelligence, and dark triad personality).
Resumo:
The purpose of this study is to examine the current level of stakeholder involvement during the project's planning process. Stakeholders often provide the needed resources and have the ability to control the interaction and resource flows in the network. They also ultimately have strong impact on an organisation's survival, and therefore appropriate management and involvement of key stakeholders should be an important part of any project management plan. A series of literature reviews was conducted to identify and categorise significant phases involved in the planning. For data collection, a questionnaire survey was designed and distributed amongst nearly 200 companies who were involved in the residential building sector in Australia. Results of the analysis demonstrate the engagement levels of the four stakeholder groups involved in the planning process and establish a basis for further stakeholder involvement improvement.
Resumo:
As a vital component of construction professional services (CPS), construction management consultancy is in nature knowledge-intensive and client-tailored. Although recent studies have acknowledged the increasing role of this subsector of CPS in the attainment of sustainable construction, little attention has been given to the education and training of its main body, namely construction management consultants (CMCs). This study investigated the competence and knowledge structure of CMCs by taking China as an example. Using the methods of interview and questionnaire survey, three key competences of CMCs and the underpinned knowledge structure were identified. The identified competences are personnel quality, onsite practical skills, and continuing professional learning. Underpinned these competences are the knowledge structure composed of a number of disciplines including construction cost planning and control, civil engineering and construction, engineering contract and law, and construction project management. The research findings lay a solid foundation for future studies to probe into the role of construction management consultants in the area of sustainable construction.
Resumo:
In this paper, we detail the development of two stakeholder relationships scales. The scales measure major project managers' perceived competence in developing (establishing and maintaining) high quality, effective relationships with stakeholders who are internal and external to their organization. Our sample consists of 373 major project managers from a sub-set of the Australian defense industry. Both the internal stakeholder relationships scale and the external stakeholder relationships scale demonstrated validity and reliability. This research has implications for the interpersonal work relationships literature and the stakeholder management literature. We recommend that researchers test these scales with multiple samples, across different project types and project industries in the future. The stakeholder relationship scales should be versatile enough to be applied to project management generally but are perhaps best suited to major project environments.
Resumo:
This paper describes the design and implementation of ADAMIS (‘A database for medical information systems’). ADAMIS is a relational database management system for a general hospital environment. Apart from the usual database (DB) facilities of data definition and data manipulation, ADAMIS supports a query language called the ‘simplified medical query language’ (SMQL) which is completely end-user oriented and highly non-procedural. Other features of ADAMIS include provision of facilities for statistics collection and report generation. ADAMIS also provides adequate security and integrity features and has been designed mainly for use on interactive terminals.
Resumo:
The aim of the study was to explore why the MuPSiNet project - a computer and network supported learning environment for the field of health care and social work - did not develop as expected. To grasp the problem some hypotheses were formulated. The hypotheses regarded the teachers' skills in and attitudes towards computing and their attitudes towards constructivist study methods. An online survey containing 48 items was performed. The survey targeted all the teachers within the field of health care and social work in the country, and it produced 461 responses that were analysed against the hypotheses. The reliability of the variables was tested using the Cronbach alpha coefficient and t-tests. Poor basic computing skills among the teachers combined with a vulnerable technical solution, and inadequate project management combined with lack of administrative models for transforming economic resources into manpower were the factors that turned out to play a decisive role in the project. Other important findings were that the teachers had rather poor skills and knowledge in computing, computer safety and computer supported instruction, and that these skills were significantly poorer among female teachers who were in majority in the sample. The fraction of teachers who were familiar with software for electronic patient records (EPR) was low. The attitudes towards constructivist teaching methods were positive, and further education seemed to utterly increase the teachers' readiness to use alternative teaching methods. The most important conclusions were the following: In order to integrate EPR software as a natural tool in teaching planning and documenting health care, it is crucial that the teachers have sufficient basic skills in computing and that more teachers have personal experience of using EPR software. In order for computer supported teaching to become accepted it is necessary to arrange with extensive further education for the teachers presently working, and for that further education to succeed it should be backed up locally among other things by sufficient support in matters concerning computer supported teaching. The attitudes towards computing showed significant gender differences. Based on the findings it is suggested that basic skills in computing should also include an awareness of data safety in relation to work in different kinds of computer networks, and that projects of this kind should be built up around a proper project organisation with sufficient resources. Suggestions concerning curricular development and further education are also presented. Conclusions concerning the research method were that reminders have a better effect, and that respondents tend to answer open-ended questions more verbosely in electronically distributed online surveys compared to traditional surveys. A method of utilising randomized passwords to guarantee respondent anonymity while maintaining sample control is presented. Keywords: computer-assisted learning, computer-assisted instruction, health care, social work, vocational education, computerized patient record, online survey
Resumo:
The Horticulture Australia funded project, Management Guidelines for Warm-Season Grasses in Australia (TU05001), has allowed a detailed greens grass study to take place and enabled researchers and superintendents to work together to collect meaningful data on a range of Cynodon dactylon (L.) Pers. x Cynodon transvaalensis Burtt-Davy (Cynodon hybrid) and Paspalum vaginatum O. Swartz (seashore paspalum) cultivars suitable for golf or lawn bowls use. The end result provides superintendents and greenkeepers with additional knowledge to accompany their skills in managing or upgrading their greens to produce a denser, smoother and faster putting or bowls surface. However, neither turfgrass selection nor finely tuned management program will overcome unrealistic expectations (especially in relation to usage), poor growing environments, or limitations due to improper construction techniques.
Resumo:
This is a qualitative study of female underrepresentation in leadership roles in project-based organisations in Australia, specifically the construction and property development industries. Using a gender lens, the underlying structural and cultural barriers to women's advancement to leadership in those organisations was studied and, in particular, what challenges they face in their career advancement and what attempts they make to resolve those challenges. The findings show that the unique characteristics of project-based organisations, with their perpetual masculine work practices, embedded masculine logic, gender-based bias and masculine organisational culture, all maintain the pattern of underrepresentation of women.
Resumo:
As business environments become even more competitive, project teams are required to make an effort to operate external linkages from within an organization or across organizational boundaries. Nevertheless, some members boundary-span less extensively, isolating themselves and their project teams from external environments. Our study examines why some members boundary-span more or less through the framework of group attachment theory. Data from 521 project-team members in construction and engineering industries revealed that the more individuals worry about their project team’s acceptance (group attachment anxiety), the more likely they are to perceive intergroup competition, and thus put more efforts into operating external linkages and resources to help their own teams outperform competitors. In contrast, a tendency to distrust their project teams (group attachment avoidance) generates members’ negative construal of their team’s external image, and thus fewer efforts are made at operating external linkages. Thus, project leaders and members with high group-attachment-anxiety may be best qualified for external tasks.
Resumo:
The quaternary system Sb1bTe1bBi1bSe with small amounts of suitable dopants is of interest for the manufacture of thermoelectric modules which exhibit the Peltier and Seebeck effects. This property could be useful in the production of energy from the thermoelectric effect. Other substances are bismuth telluride (Bi2Te3) and Sb1bTe1bBi and compounds such as ZnIn2Se4. In the present paper the application of computer programs such as MIGAP of Kaufman is used to indicate the stability of the ternary limits of Sb1bTe1bBi within the temperature ranges of interest, namely 273 K to 300 K.
Resumo:
The concession agreement is the core feature of BOT projects, with the concession period being the most essential feature in determining the time span of the various rights, obligations and responsibilities of the government and concessionaire. Concession period design is therefore crucial for financial viability and determining the benefit/cost allocation between the host government and the concessionaire. However, while the concession period and project life span are essentially interdependent, most methods to date consider their determination as contiguous events that are determined exogenously. Moreover, these methods seldom consider the, often uncertain, social benefits and costs involved that are critical in defining, pricing and distributing benefits and costs between the various parties and evaluating potentially distributable cash flows. In this paper, we present the results of the first stage of a research project aimed at determining the optimal build-operate-transfer (BOT) project life span and concession period endogenously and interdependently by maximizing the combined benefits of stakeholders. Based on the estimation of the economic and social development involved, a negotiation space of the concession period interval is obtained, with its lower boundary creating the desired financial return for the private investors and its upper boundary ensuring the economic feasibility of the host government as well as the maximized welfare within the project life. The outcome of the new quantitative model is considered as a suitable basis for future field trials prior to implementation. The structure and details of the model are provided in the paper with Hong Kong tunnel project as a case study to demonstrate its detailed application. The basic contributions of the paper to the theory of construction procurement are that the project life span and concession period are determined jointly and the social benefits taken into account in the examination of project financial benefits. In practical terms, the model goes beyond the current practice of linear-process thinking and should enable engineering consultants to provide project information more rationally and accurately to BOT project bidders and increase the government's prospects of successfully entering into a contract with a concessionaire. This is expected to generate more negotiation space for the government and concessionaire in determining the major socioeconomic features of individual BOT contracts when negotiating the concession period. As a result, the use of the model should increase the total benefit to both parties.
Resumo:
The driving force behind this study is the gap between the reality of the firms engaged in project business and the available studies covering project management and business process development. Previous studies show that project-based organizations were ‘immature’ in terms of the project-management ‘maturity model’, as few firms were found to be optimizing processes. Even within those, very little attention was paid to combine inter-organizational and intra-organizational perspectives. In this study an effort is made to elaborate some thoughts and views on project management, which interrelate firms’ external and internal activities. In line with the integration, the dissertation uses an approach to the management of project-business interdependencies in the networks of actors, activities and resources. Firstly, the study develops an understanding for inter-organizational perspectives by exploring the complementarities of process activities in the basic development of project business. It presents a framework that is elaborated on the basis of the reciprocal interactions of activities within and outside the organization—thus providing a coherent basis for continuous business-process improvement. In addition, the study presents new tools that can be used to develop project-business processes in each of its functional areas. The research demonstrates how project-business activities can be optimized using the right resources at the right time with the right actors and the right actions. The selected five articles included in this dissertation explain the basic framework for the development of project business. Each paper covers various aspects of inter-organizational and intra-organizational perspectives for project management. The study develops a valuable and procedural model for business-process improvement using the Delphi method that can be used not only in academia but also as a guide for practitioners that takes them through a series of well-defined steps when making informed, consistent and efficient changes to their business processes.
Resumo:
Despite thirty years of research in interorganizational networks and project business within the industrial networks approach and relationship marketing, collective capability of networks of business and other interorganizational actors has not been explicitly conceptualized and studied within the above-named approaches. This is despite the fact that the two approaches maintain that networking is one of the core strategies for the long-term survival of market actors. Recently, many scholars within the above-named approaches have emphasized that the survival of market actors is based on the strength of their networks and that inter-firm competition is being replaced by inter-network competition. Furthermore, project business is characterized by the building of goal-oriented, temporary networks whose aims, structures, and procedures are clarified and that are governed by processes of interaction as well as recurrent contracts. This study develops frameworks for studying and analysing collective network capability, i.e. collective capability created for the network of firms. The concept is first justified and positioned within the industrial networks, project business, and relationship marketing schools. An eclectic source of conceptual input is based on four major approaches to interorganizational business relationships. The study uses qualitative research and analysis, and the case report analyses the empirical phenomenon using a large number of qualitative techniques: tables, diagrams, network models, matrices etc. The study shows the high level of uniqueness and complexity of international project business. While perceived psychic distance between the parties may be small due to previous project experiences and the benefit of existing relationships, a varied number of critical events develop due to the economic and local context of the recipient country as well as the coordination demands of the large number of involved actors. The study shows that the successful creation of collective network capability led to the success of the network for the studied project. The processes and structures for creating collective network capability are encapsulated in a model of governance factors for interorganizational networks. The theoretical and management implications are summarized in seven propositions. The core implication is that project business success in unique and complex environments is achieved by accessing the capabilities of a network of actors, and project management in such environments should be built on both contractual and cooperative procedures with local recipient country parties.
Resumo:
The quaternary system Sb1bTe1bBi1bSe with small amounts of suitable dopants is of interest for the manufacture of thermoelectric modules which exhibit the Peltier and Seebeck effects. This property could be useful in the production of energy from the thermoelectric effect. Other substances are bismuth telluride (Bi2Te3) and Sb1bTe1bBi and compounds such as ZnIn2Se4. In the present paper the application of computer programs such as MIGAP of Kaufman is used to indicate the stability of the ternary limits of Sb1bTe1bBi within the temperature ranges of interest, namely 273 K to 300 K.