923 resultados para Project Read and Write


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The UK industry has been criticised for being slow to adopt construction process innovations. Research shows that the idiosyncrasies of participants, their roles in the system and the contextual differences between sections of the industry make this a highly complex problem. There is considerable evidence that informal social networks play a key role in diffusion of innovations. The aim is to identify informal communication networks of project participants and the role these play in the diffusion of construction innovations. The characteristics of this network will be analysed in order to understand how they can be used to accelerate innovation diffusion within and between projects. Social Network Analysis is used to determine informal communication routes. Control and experiment case study projects are used within two different organizations. This allows informal communication routes concerning innovations to be mapped, whilst testing if the informal routes can facilitate diffusion. Analysis will focus upon understanding the combination of informal strong and weak ties, and how these impede or facilitate the diffusion of the innovation. Initial work suggests the presence of an informal communication network. Actors within this informal network, and the organization's management are unaware of its' existence and their informal roles within it. Thus, the network remains an untapped medium regarding innovation diffusion. It is proposed that successful innovation diffusion is dependent upon understanding informal strong and weak ties, at project, organization and industry level.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The term commercial management has been used for some time, similarly the job title commercial manager. However, as of yet, little emphasis has been placed on defining. This paper presents the findings from a two-year research initiative that has compared and contrasted the role of commercial managers from a range of organisations and across industry sectors, as a first step in developing a body of knowledge for commercial. It is argued that there are compelling arguments for considering commercial management, not solely as atask undertaken by commercial managers, but as a discipline in itself: a discipline that, arguably, bridges traditional project management and organisational theories. While the study has established differences in approach and application both between and within industry sectors, it has established sufficient similarity and synergy in practice to identify a specific role of commercial management in project-based organisations. These similarities encompass contract management and dispute resolution; the divergences include a greater involvement in financial and value management in construction and in bid management in defence/aerospace.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This research examines dynamics associated with new representational technologies in complex organizations through a study of the use of a Single Model Environment, prototyping and simulation tools in the mega-project to construct Terminal 5 at Heathrow Airport, London. The ambition of the client, BAA. was to change industrial practices reducing project costs and time to delivery through new contractual arrangements and new digitally-enabled collaborative ways of working. The research highlights changes over time and addresses two areas of 'turbulence' in the use of: 1) technologies, where there is a dynamic tension between desires to constantly improve, change and update digital technologies and the need to standardise practices, maintaining and defending the overall integrity of the system; and 2) representations, where dynamics result from the responsibilities and liabilities associated with sharing of digital representations and a lack of trust in the validity of data from other firms. These dynamics are tracked across three stages of this well-managed and innovative project and indicate the generic need to treat digital infrastructure as an ongoing strategic issue.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The People's Republic of China and its 1.3 billion people have experienced a rapid economic growth in the past two decades. China's urbanisation ratio rose from around 20% in the early 1980s to 45% in 2007 [China Urban Research Committee. Green building. Beijing: Chinese Construction Industrial Publish House; 2008. ISBN 978-7-112-09925-2.]. The large volume and rapid speed of building construction rarely have been seen in global development and cause substantial pressure on resources and the environment. Government policy makers and building professionals, including architects, building engineers, project managers and property developers, should play an important role in enhancing the planning, design, construction, operation and maintenance of the building energy efficiency process in forming the sustainable urban development. This paper addresses the emerging issues relating to building energy consumption and building energy efficiency due to the fast urbanisation development in China.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The state of health and safety on construction sites in Ghana was investigated using first hand observation of fourteen (14) construction project sites in 2009 and 2010. At each site, the construction project, workers and the physical environment of the site were inspected and evaluated against health and safety indicators taken from the literature. The results reveal a poor state of health and safety on Ghanaian construction sites. The primary reasons are a lack of strong institutional framework for governing construction activities and poor enforcement of health and safety policies and procedures. Also, Ghanaian society does not place a high premium on health and safety of construction workers on site. Interviews with workers indicated that injuries and accidents are common on sites. However, compensation for injury is often at the discretion of the contractor although collective bargaining agreements between Labour unions and employers prescribe obligations for the contractor in the event of injury to a worker.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The process of how contractors take account of risk when calculating their bids for construction work is investigated based on preliminary investigations and case studies in Ghana and UK. Ghana and UK were chosen, more or less arbitrarily, for the purpose of case studies, and to test the idea that there are systematic differences between the approaches in different places. Clear differences were found in the risk pricing approaches of contractors in the two countries. The difference appeared to emanate from the professional knowledge and competence of the bid team members, company policy, corporate accountability and the business environments in which the contractors operate. Both groups of contractors take account of risk in estimates. However, risk accountability was found to be higher on the agenda in the tender process of UK contractors, documented more systematically, and assessed and managed more rigorously with input from the whole bid team. Risk accountability takes place at three levels of the tender process and is dictated strongly by market forces and company circumstances.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Services are very important to the UK balance of trade; a surplus has been recorded for trade in services every year since 1966. Construction professional services exports (CPS), which cover architecture, engineering and surveying (AES), have also increased, contributing over £3bn to the UK trade balance in 2007. The changing environment of construction professional services exports complicates the validity of the characteristics and definitions of services as described in the research literature and official export statistics. Through semi-structured interviews undertaken with large consulting engineers and a round-table discussion with industry and government representatives, the research found that the impact of globalisation and the changes in the construction business environment, such as increasing foreign ownership and changing forms of procurement, are not fully reflected in the official statistics. There have also been rapid changes in technology, procurement and methods of delivery which have impacted exporting AES firms and a more appropriate set of characteristics is needed to better reflect the project-specific and knowledge-intensive nature of AES firms.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Background:  Several authors have highlighted areas of overlap in symptoms and impairment among children with autism spectrum disorder (ASD) and children with specific language impairment (SLI). By contrast, loss of language and broadly defined regression have been reported as relatively specific to autism. We compare the incidence of language loss and language progression of children with autism and SLI. Methods:  We used two complementary studies: the Special Needs and Autism Project (SNAP) and the Manchester Language Study (MLS) involving children with SLI. This yielded a combined sample of 368 children (305 males and 63 females) assessed in late childhood for autism, history of language loss, epilepsy, language abilities and nonverbal IQ. Results:  language loss occurred in just 1% of children with SLI but in 15% of children classified as having autism or autism spectrum disorder. Loss was more common among children with autism rather than milder ASD and is much less frequently reported when language development is delayed. For children who lost language skills before their first phrases, the phrased speech milestone was postponed but long-term language skills were not significantly lower than children with autism but without loss. For the few who experienced language loss after acquiring phrased speech, subsequent cognitive performance is more uncertain. Conclusions:  Language loss is highly specific to ASD. The underlying developmental abnormality may be more prevalent than raw data might suggest, its possible presence being hidden for children whose language development is delayed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In the emerging digital economy, the management of information in aerospace and construction organisations is facing a particular challenge due to the ever-increasing volume of information and the extensive use of information and communication technologies (ICTs). This paper addresses the problems of information overload and the value of information in both industries by providing some cross-disciplinary insights. In particular it identifies major issues and challenges in the current information evaluation practice in these two industries. Interviews were conducted to get a spectrum of industrial perspectives (director/strategic, project management and ICT/document management) on these issues in particular to information storage and retrieval strategies and the contrasting approaches to knowledge and information management of personalisation and codification. Industry feedback was collected by a follow-up workshop to strengthen the findings of the research. An information-handling agenda is outlined for the development of a future Information Evaluation Methodology (IEM) which could facilitate the practice of the codification of high-value information in order to support through-life knowledge and information management (K&IM) practice.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

There are a number of challenges associated with managing knowledge and information in construction organizations delivering major capital assets. These include the ever-increasing volumes of information, losing people because of retirement or competitors, the continuously changing nature of information, lack of methods on eliciting useful knowledge, development of new information technologies and changes in management and innovation practices. Existing tools and methodologies for valuing intangible assets in fields such as engineering, project management and financial, accounting, do not address fully the issues associated with the valuation of information and knowledge. Information is rarely recorded in a way that a document can be valued, when either produced or subsequently retrieved and re-used. In addition there is a wealth of tacit personal knowledge which, if codified into documentary information, may prove to be very valuable to operators of the finished asset or future designers. This paper addresses the problem of information overload and identifies the differences between data, information and knowledge. An exploratory study was conducted with a leading construction consultant examining three perspectives (business, project management and document management) by structured interviews and specifically how to value information in practical terms. Major challenges in information management are identified. An through-life Information Evaluation methodology (IEM) is presented to reduce information overload and to make the information more valuable in the future.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper reviews the growing interest in an integrated construction project model, and examines the fundamental concept of an integrated project model by discussing the various definitions that have evolved as well as the various approaches to its development. The nature of collaborative communications that the integrated project model needs to support is also discussed, as are the enabling information and communications technologies that may have a role in the realization of the model. The paper concludes with some thoughts on the future development of the integrated construction project model.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Clean Development Mechanism (CDM) has successfully demonstrated that market-based mechanisms can achieve some cost effective emissions reductions in developing countries. However the distribution of CDM projects has been extremely uneven across countries and regions, and a few technologies and sectors have dominated the early stages of CDM experience. This has caused some to question whether the CDM has fallen short of its potential in contributing to sustainable development. We review the broad patterns of CDM project approvals and evaluate 10 CDM projects according to their sustainability benefits. The difficulty of defining “sustainable development” and the process of defining criteria by individual non-Annex 1 governments has meant that sustainable development concerns have been marginalized in some countries. Given these observed limitations, we present possible CDM policy futures, focusing on the main proposals for a post-2012 climate regime. Five options for enhancing the sustainable development benefits in the CDM are discussed, including proactive approaches to favour eligibility of emission reduction projects which ensure such co-benefits.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Unhealthy diets can lead to various diseases, which in turn can translate into a bigger burden for the state in the form of health services and lost production. Obesity alone has enormous costs and claims thousands of lives every year. Although diet quality in the European Union has improved across countries, it still falls well short of conformity with the World Health Organization dietary guidelines. In this review, we classify types of policy interventions addressing healthy eating and identify through a literature review what specific policy interventions are better suited to improve diets. Policy interventions are classified into two broad categories: information measures and measures targeting the market environment. Using this classification, we summarize a number of previous systematic reviews, academic papers, and institutional reports and draw some conclusions about their effectiveness. Of the information measures, policy interventions aimed at reducing or banning unhealthy food advertisements generally have had a weak positive effect on improving diets, while public information campaigns have been successful in raising awareness of unhealthy eating but have failed to translate the message into action. Nutritional labeling allows for informed choice. However, informed choice is not necessarily healthier; knowing or being able to read and interpret nutritional labeling on food purchased does not necessarily result in consumption of healthier foods. Interventions targeting the market environment, such as fiscal measures and nutrient, food, and diet standards, are rarer and generally more effective, though more intrusive. Overall, we conclude that measures to support informed choice have a mixed and limited record of success. On the other hand, measures to target the market environment are more intrusive but may be more effective.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Hospitals represent complex and difficult contexts for AEC (architecture, engineering and construction) professionals to engage with due to their functional complexity and diversity of stakeholder interests (i.e. patient, visitor, medical specialist). Hospital designers need to take note of changing NHS policy contexts (e.g. the possible empowerment of general practitioners to shape services), technological advances in medical equipment design and the potential health needs of future generations. It is imperative for hospital designers and architects to align their processes and methodologies (e.g. briefing and requirements capture) to the needs and desires of their clients so that a medical facility design is produced which is truly aligned to the requirements of the hospital stakeholders. Semiotics, the “study” or “discipline” of signs aims to investigate the nature of signs (their inception, representation and meaning), whilst semiotics-rooted theories are concerned with investigating how meaning and understanding is mobilized between persons and between organisations. This paper details a semiotics-rooted research approach for investigating the interactions between hospital designers and stakeholders on a forthcoming NHS hospital project in the UK. A semiotics grounded study will potentially provide a deeper understanding of how meaning and understanding is established between hospital project stakeholders and construction professionals.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

FAMOUS is an ocean-atmosphere general circulation model of low resolution, based on version 4.5 of the UK MetOffice Unified Model. Here we update the model description to account for changes in the model as it is used in the CMIP5 EMIC model intercomparison project (EMICmip) and a number of other studies. Most of these changes correct errors found in the code. The EMICmip version of the model (XFXWB) has a better-conserved water budget and additional cooling in some high latitude areas, but otherwise has a similar climatology to previous versions of FAMOUS. A variant of XFXWB is also described, with changes to the dynamics at the top of the model which improve the model climatology (XFHCC).