989 resultados para Project Complexity


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The treatment of malignant or benign colorectal pathologies that require more complex management are priorities in tertiary hospitals such as "Hospital das Clínicas" University of São Paulo Medical Center (HCFMUSP). Therefore, benign, uncomplicated orifice conditions are relegated to second place. The number of patients with hemorrhoids, perianal fistulas, fissures, condylomas and pilonidal cysts who seek treatment at the HFMUSP is very great, resulting in over-crowding in the outpatient clinics and a long waiting list for recommended surgical treatment (at times over 18 months). The authors describe the experience of the HCFMUSP over an eight-day period with day-hospital surgery in which 140 patients underwent surgery. Data was prospectively taken on the patients undergoing surgery for benign orifice pathologies including age, sex, diagnosis, surgery performed, immediate and late postoperative complications, and follow-up. 140 patients operated on over eight days were studied. 68 were males (48.75%) with ages ranging from 25 to 62 (mean 35.2 yrs.). Hemorrhoids was the most frequent condition encountered (82 hemorrhoidectomies, 58.6%), followed by perineal fistula (28 fistula repairs, 20.0%). The most common complication was headache secondary to rachianesthesia occurring in 9 patients (6.4%). One patient (0.7%) developed bleeding immediately PO that required reoperation. Mean follow-up was 104 days. Day-surgery characterized by quality care and low morbidity is feasible in tertiary public hospitals, permitting surgery for benign orifice pathologies on many patients within a short period of time.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

OBJECTIVE: To identify social characteristics and expectations of individuals seen during a community project for the treatment of senile cataracts. Expected results from their eye surgery and its consequences to their quality of life were studied as well. METHODOLOGY: Cataract patients (visual acuity equal to or lower than 0.2 in the more superior eye) aged 50 years or over, were surveyed by means of interviews held during their visit at the Cataract Project in São Paulo city, State of São Paulo, Brazil, in 1999. RESULTS: The sample was composed of 331 subjects of low socioeconomic level ranging in age from 50 to 97 years (average = 71.8 years). Expectation of total recovery from the cataract condition by means of surgery was declared by 80.0% of the respondents, with no significant differences between male and female subjects (P < 0.1723). Hope to resume manual activities was expressed by 59.8%. CONCLUSION: A predominance of expectations of resuming normal activity and achieving a better quality of life after cataract surgery were identified.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper analyzes the Nova Student Portfolio (NSP) with the objective to understand performances of the fund. Each investment style has been analyzed (growth, value and momentum) in order to highlight what style allocation contributed positively and which had a negative impact. The results show that the team mainly invested in value stocks, which contributed positively but that its growth investments had a negative impact on the stock picking performance. The stock selection shows a major influence of the value investment style. A statistical approach shows that the market factor was the one explaining the most the NSP returns.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The main goals for the current dissertation is to research on how practices and concepts from Agile Project Management can be applied in a non-IT context and to discover which aspects should be considered when deciding if whether an Agile approach should be implemented or not. Previous studies reflect on the adoption for the identified context. However, the recognition of these practices and concepts by the Project Management field of studies still remains unresolved. The adoption of Agile Project Management emerges as a manifestation against traditional approaches, mainly due to their inability of accepting requirements’ changes. Therefore, these practices and concepts can be considered in order to reduce the risks concerning the increase of competition and innovation – which does not apply to the IT sector solely. The current study reviews the literature on Agile Project Management and its adoption across different sectors in order to assess which practices and concepts can be applied on a non-IT context. Nine different methods are reviewed, where two of these show a higher relevance – Scrum and Extreme Programming. The identified practices and concepts can be separated into four different groups: Cultural and Organizational Structures, Process, Practices, and Artefacts. A framework based on the work by Boehm & Turner in 2004 is developed in order to support the decision of adopting agile methods. A survey intended for project managers was carried in order to assess the implementation of the identified practices and concepts and to evaluate which variables have the highest importance on the developed decision support framework. It is concluded that New Product Development is the project type with the highest potential to implement an agile approach and that the Project Final Product’s Innovativeness, Competitiveness, and the Project Member’s Experience and Autonomy are the most important aspects to consider an implementation of an Agile approach.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In broad sense, Project Financing1 as a mean of financing large scale infrastructural projects worldwide has had a steady growth in popularity for the last 20 years. This growth has been relatively unscathed from most economic cycles. However in the wake of the 2007 systemic Financial Crisis, Project Financing was also in trouble. The liquidity freeze and credit crunch that ensued affected all parties involved. Traditional Lenders, of this type of financial instrument, locked-in long-term contractual obligations, were severely hit with scarcity of funding compounded by rapidly increasing cost of funding. All the while, Banks were “rescued” by the concerted actions of Central Banks and other Multi-Lateral Agencies around the world but at the same time “stressed” by upcoming regulatory effort (Basel Committee). This impact resulted in specific changes to this type of long-term financing. Changes such as Commercial Banks’ increased risk aversion; pricing increase and maturities decrease of credit facilities; enforcement of Market Disruption Event clauses; partial responsibility for project risk by Multilateral Agencies; and adoption of utility-like availability payments in other industrial sectors such as transportation and even social infrastructure. To the extent possible, this report is then divided in three parts. First, it begins with a more instructional part, touching academic literature (theory) and giving the Banks perspective (practice), but mostly as an overview of Project Finance for awareness’ sake. The renowned Harvard Business School professor – Benjamin Esty, states2 that Project Finance is a “relatively unexplored territory for both empirical and theoretical research” which means that academic research efforts are lagging the practice of Project Finance. Second, the report presents a practical case regarding the first Road Concession in Portugal in 1998 ending with the lessons learned 10 years after Financial Close. Lastly, the report concludes with the analysis of the current trends and changes to the industry post Financial Crisis of the late 2000’s. To achieve this I’ll reference relevant papers, books on the subject, online articles and my own experience in the Project Finance Department at a major Portuguese Investment Bank. Regarding the latter, with the signing of a confidentiality agreement, I’m duly omitting sensitive and proprietary bank information.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Relatório de estágio de mestrado em Ensino de Inglês e de Espanhol no 3º Ciclo do Ensino Básico e no Ensino Secundário

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Since concrete is the most widely utilized construction material, several solutions are currently being developed and investigated for enhancing the sustainability of cementitious materials. One of these solutions is based on producing Recycled Concrete Aggregates (RCA) from existing concrete members resulting by either industrial processes or demolitions of existing structures as a whole. Moreover, waste resulting from industrial processes other than the building construction (i.e., tire recycling, production of steel, powders resulting from other depuration processes) are also being considered as possible low-impact constituents for producing structural concrete and Fiber-Reinforced Cementitious Composites (FRCC). Furthermore, the use of natural fibers is another option for producing environmentally-friendly and cost-effective materials, depending on the local availability of raw materials. To promote the use of concretes partially composed of recycled constituents, their influence on the mechanical and durability performance of these concretes have to be deeply investigated and correlated. This was the main goal of the EnCoRe Project (www.encore-fp7.unisa.it), a EU-funded initiative, whose activities and main findings are summarized in this paper.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

During recent decades it has been possible to identify several problems in construction industry project management, related with to systematic failures in terms of fulfilling its schedule, cost and quality targets, which highlight a need for an evaluation of the factors that may cause these failures. Therefore, it is important to understand how project managers plan the projects, so that the performance and the results can be improved. However, it is important to understand if other areas beyond cost and time management that are mentioned on several studies as the most critical areas, receive the necessary attention from construction project managers. Despite the cost and time are the most sensitive areas/fields, there are several other factors that may lead to project failure. This study aims at understand the reasons that may cause the deviation in terms of cost, time and quality, from the project management point of view, looking at the knowledge areas mentioned by PMI (Project Management Institute).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

O objetivo deste trabalho é apresentar os resultados da análise das concepções de dois protagonistas de uma reforma curricular que está sendo implementada numa escola de engenharia. A principal característica do novo currículo é o uso de projetos e oficinas como atividades complementares a serem realizadas pelos estudantes. As atividades complementares acontecerão em paralelo ao trabalho realizado nas disciplinas sem que haja uma relação de interdisciplinaridade. O novo currículo está sendo implantado desde fevereiro de 2015. Segundo Pacheco (2005) há dois momentos, dentre outros, no processo de mudança curricular, o currículo “ideal”, determinado por dimensões epistemológica, política, econômica, ideológica, técnica, estética, e histórica e, que recebe influência direta daquele que idealiza e cria o novo currículo e, o currículo “formal” que se traduz na prática implementada na escola. São essas duas etapas estudadas nesta pesquisa. Para isso serão considerados como fontes de dados dois protagonistas, um mais ligado à concepção do currículo e outro da sua implementação, a partir dos quais se busca compreender as motivações, crenças e percepções que, por sua vez, determinam a reforma curricular. Entrevistas semiestruturadas foram utilizadas como técnica de pesquisa, com o propósito de se entender a gênese da proposta e as mudanças entre essas duas etapas. Os dados revelam que mudanças aconteceram desde a idealização até a formalização do currículo, motivadas por demandas do processo de implementação, revela ainda diferenças na visão de currículo e a motivação para romper com padrões na formação de engenheiros no Brasil.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

IP networks are currently the major communication infrastructure used by an increasing number of applications and heterogeneous services, including voice services. In this context, the Session Initiation Protocol (SIP) is a signaling protocol widely used for controlling multimedia communication sessions such as voice or video calls over IP networks, thus performing vital functions in an extensive set of public and enter- prise solutions. However, the SIP protocol dissemination also entails some challenges, such as the complexity associated with the testing/validation processes of IMS/SIP networks. As a consequence, manual IMS/SIP testing solutions are inherently costly and time consuming tasks, being crucial to develop automated approaches in this specific area. In this perspective, this article presents an experimental approach for automated testing/validation of SIP scenarios in IMS networks. For that purpose, an automation framework is proposed allowing to replicate the configuration of SIP equipment from the pro- duction network and submit such equipment to a battery of tests in the testing network. The proposed solution allows to drastically reduce the test and validation times when compared with traditional manual approaches, also allowing to enhance testing reliability and coverage. The automation framework comprises of some freely available tools which are conveniently integrated with other specific modules implemented within the context of this work. In order to illustrate the advantages of the proposed automated framework, a real case study taken from a PT Inovação customer is presented comparing the time required to perform a manual SIP testing approach with the one time required when using the proposed auto- mated framework. The presented results clearly corroborate the advantages of using the presented framework.