822 resultados para Private donations for the public sector


Relevância:

100.00% 100.00%

Publicador:

Resumo:

In the UK, the government continues its project to reform public services. Earlier projects have focused on the modernization of public sector organizations; in the latest round of reform, New Labour has focused on widening choice and the personalization of services. To this end, the government has been working with Third Sector (TS) organizations to expand their role in shaping, commissioning and delivering public services. The government's vision is predicated on a normative assertion, that, unlike traditional public sector organizations, TS bodies create public value by being more innovative, are inspired by altruistic aims and values, and have greater commitment to their clients. This paper reviews recent policy and questions whether the government's policy is flawed, contradictory and risks damaging the attributes of the TS admired by New Labour. © 2007 The Author. Journal compilation © 2007 Blackwell Publishing Ltd.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aim of this thesis is to examine the specific contextual factors affecting the applicability and development of the planning, programming, budgeting system (P.P.B.S.) as a systems approach to public sector budgeting. The concept of P.P.B.S. as a systems approach to public sector budgeting will first be developed and the preliminary hypothesis that general contextual factors may be classified under political, structural and cognitive headings will be put forward. This preliminary hypothesis will be developed and refined using American and early British experience. The refined hypothesis will then be tested in detail in the case of the English health and personal social services (H.P.S.S.), The reasons for this focus are that it is the most recent, the sole remaining, and the most significant example in British central government outside of defence, and is fairly representative of non-defence government programme areas. The method of data collection relies on the examination of unpublished and difficult to obtain central government, health and local authority documents, and interviews with senior civil servants and public officials. The conclusion will be that the political constraints on, or factors affecting P.P.B.S., vary with product characteristics and cultural imperatives on pluralistic decision-making; that structural constraints vary with the degree of coincidence of programme and organisation structure and with the degree of controllability of the organisation; and finally, that cognitive constraints vary according to product characteristics, organisational responsibilities, and analytical effort.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis reviews the main methodological developments in public sector investment appraisal and finds growing evidence that appraisal techniques are not fulfilling their earlier promise. It is suggested that an important reason for this failure lies in the inability of these techniques to handle uncertainty except in a highly circumscribed fashion. It is argued that a more fruitful approach is to strive for flexibility. Investment projects should be formulated with a view to making them responsive to a wide range of possible future events, rather than embodying a solution which is optimal for one configuration of circumstances only. The distinction drawn in economics between the short and the long run is used to examine the nature of flexibility. The concept of long run flexibility is applied to the pre-investment range of choice open to the decisionmaker. It is demonstrated that flexibility is reduced at a very early stage of decisionmaking by the conventional system of appraisal which evaluates only a small number of options. The pre-appraisal filtering process is considered further in relation to decisionmaking models. It is argued that for public sector projects the narrowing down of options is best understood in relation to an amended mixed scanning model which places importance on the process by which the 'national interest ' is determined. Short run flexibility deals with operational characteristics, the degree to which particular projects may respond to changing demands when the basic investment is already in place. The tension between flexibility and cost is noted. A short case study on the choice of electricity generating plant is presented. The thesis concludes with a brief examination of the approaches used by successive British governments to public sector investment, particularly in relation to the nationalised industries

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Korea has increasingly adopted design-build for public construction projects in the last few years. There is a much greater awareness of the need to change a system based on ‘Value for Money’ which is high on the government's agenda. A whole life performance bid evaluation model is proposed to aid decision makers in the selection of a design-builder. This is based on the integration of a framework using an analytic hierarchy process as the bid awarding system is being changed from one based on lowest price, to one based on best value over the life-cycle. Key criteria like whole life cost, service life planning and design quality are important through the key stages of evaluation process. The model uses a systematic and holistic approach which enables a public sector to make better decisions in design-builder selection, which will deliver whole life benefits, based on long term cost-effectiveness and whole life.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The CASE Award PhD is a relatively new approach to completing academic research degrees, aligning the ideals of comprehensive research training and cross-collaboration between academics and organisations. As the initial wave of CASE funded PhD research begins to near completion, and indeed become evident through the publication of results, now is an appropriate time to begin the evaluation process of how to successfully deliver a CASE PhD, and to analyse the best practice approaches of completing a CASE Award with an organisation. This article intends to offer a picture into the CASE PhD process, with a focus on methods of communication to successfully implement this kind of research in collaboration with an organisation.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Completing projects faster than the normal duration is always a challenge to the management of any project, as it often demands many paradigm shifts. Opportunities of globalization, competition from private sectors and multinationals force the management of public sector organizations in the Indian petroleum sector to take various aggressive strategies to maintain their profitability. Constructing infrastructure for handling petroleum products is one of them. Moreover, these projects are required to be completed in faster duration compared to normal schedules to remain competitive, to get faster return on investment, and to give longer project life. However, using conventional tools and techniques of project management, it is impossible to handle the problem of reducing the project duration from a normal period. This study proposes the use of concurrent engineering in managing projects for radically reducing project duration. The phases of the project are accomplished concurrently/simultaneously instead of in a series. The complexities that arise in managing projects are tackled through restructuring project organization, improving management commitment, strengthening project-planning activities, ensuring project quality, managing project risk objectively and integrating project activities through management information systems. These would not only ensure completion of projects in fast track, but also improve project effectiveness in terms of quality, cost effectiveness, team building, etc. and in turn overall productivity of the project organization would improve.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Private label branding strategies differ to that of the manufacturer. The study aims to identify optimal private label branding strategies for (a) utilitarian products and (b) hedonistic products, considering the special factors reflected in consumer behavior related to private labels in Hungary. The issue of House of Brands and Branded House strategies are discussed and evaluated in the light of retail business models. Focus group interviews and factor analysis of the survey found differences in branding strategies preferred by consumers for the two product categories. The study also outlines a strong trend in possible private label development based on consumer’s changing attitude in favor of national products.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A tanulmány – egy 2005 végén lefolytatott, országosan reprezentatív kérdőíves felmérés empirikus bázisán – a magyar közigazgatási dolgozók körében 2002-től bevezetett egyéni teljesítményértékelési rendszert vizsgálja. A rendszer egészét tekintve a vizsgálat végkövetkeztetései nem túl rózsásak: az eredmények arra utalnak, hogy a rendszer mint egész nem képes kitűzött fő célját, a munkateljesítmények javítását elérni. Az egyes részrendszerek, szervezettípusok szintjén differenciáltabb eredményeket kapunk, míg a minisztériumokban a rendszer egésze a szándékolttól alapvetően különböző célokat látszik szolgálni, addig a többi szervezettípusnál inkább „csak” a rendszer tökéletlen működéséről beszélhetünk. ____ On the basis of a questionnaire survey of a nationally representative sample of Hungarian civil servants, the study attempts to give a preliminary evaluation of the individual performance assessment system introduced in 2002 throughout the Hungarian civil service. The general conclusion of the analysis is that the performance assessment system is unlikely to reach its goals: its central element, the performance related pay incentives are overly dispersed and, on the average, insignificant in size, meanwhile the objectivity of performance assessments is also questionable. Moreover, comparative analysis of responses from different administrative branches reveals an interesting idiosyncrasy characteristic for central government ministries. Here, the main function of the incentive system seems to be ensuring the labor market competitiveness of the ministries as employers by enabling them to pay higher-than-usual salaries for employees having certain types of expertise.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The maturation of the public sphere in Argentina during the late nineteenth and early twentieth centuries was a critical element in the nation-building process and the overall development of the modern state. Within the context of this evolution, the discourse of disease generated intense debates that subsequently influenced policies that transformed the public spaces of Buenos Aires and facilitated state intervention within the private domains of the city’s inhabitants. Under the banner of hygiene and public health, municipal officials thus Europeanized the nation’s capital through the construction of parks and plazas and likewise utilized the press to garner support for the initiatives that would remedy the unsanitary conditions and practices of the city. Despite promises to the contrary, the improvements to the public spaces of Buenos Aires primarily benefited the porteño elite while the efforts to root out disease often targeted working-class neighborhoods. The model that reformed the public space of Buenos Aires, including its socially differentiated application of aesthetic order and public health policies, was ultimately employed throughout the Argentine Republic as the consolidated political elite rolled out its national program of material and social development.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

As America moved into the 2lst century financial scandals associated with large publicly traded corporations brought widespread concern about the reliability of financial reporting. In response the U.S. Congress adopted the Sarbanes-Oxley Act of 2002 (SOX). Undergirding SOX was the belief that improvements in the reliability of an organization's financial disclosures would lead to increased trust in the issuing organization. While SOX is aimed at publicly traded private sector organizations, the value of adopting SOX-like practices in the public and the nonprofit sectors have been recognized. Although SOX-like auditing practices have not at the time of this research become part of the auditing regime for municipalities, the results of this research provide a baseline "read" of municipal finance officers' perceptions of the value and obstacles associated with adoption of two major components of SOX: Principal Officer(s) Certification (POC) and the Independent Audit Committee (IAC) requirements. The author mailed surveys to all finance officers of municipalities in Florida and Ohio with populations of 10,000 or greater which did not contract out the operation of their finance departments. Post-survey "elite" interviews were conducted in an effort to obtain a deeper understanding of revealed issues and contradictions found in the analysis of the results of the mails survey. The findings suggest municipal finance officers are willing to adopt POC but have reservations about implementing IAC. With both POC and IAC the respondents appeared to consider intangible, non-pecuniary consequences as much or more than tangible, pecuniary consequences. Consistent with prior research, attitudes regarding POC and IAC were found to be unrelated to prior adoptive behavior, or personal and organizational demographic variables. Although accounting and auditing are inexorably intertwined, views of the recently implemented GASB 34 reporting model were found to be unrelated to the willingness to adopt POC or IAC. Findings dovetail with current discourse in public sector accounting suggesting local finance professionals may see benefits—both tangible and intangible—to some but not all accounting practices adopted in the private sector. This is consistent with the commonly accepted belief that public sector accounting maintains fundamental differences from its private counterpart.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Integrated project delivery (IPD) method has recently emerged as an alternative to traditional delivery methods. It has the potential to overcome inefficiencies of traditional delivery methods by enhancing collaboration among project participants. Information and communication technology (ICT) facilitates IPD by effective management, processing and communication of information within and among organizations. While the benefits of IPD, and the role of ICT in realizing them, have been generally acknowledged, the US public construction sector is very slow in adopting IPD. The reasons are - lack of experience and inadequate understanding of IPD in public owner as confirmed by the results of the questionnaire survey conducted under this research study. The public construction sector should be aware of the value of IPD and should know the essentials for effective implementation of IPD principles - especially, they should be cognizant of the opportunities offered by advancements in ICT to realize this.^ In order to address the need an IPD Readiness Assessment Model (IPD-RAM) was developed in this research study. The model was designed with a goal to determine IPD readiness of a public owner organization considering selected IPD principles, and ICT levels, at which project functions were carried out. Subsequent analysis led to identification of possible improvements in ICTs that have the potential to increase IPD readiness scores. Termed as the gap identification, this process was used to formulate improvement strategies. The model had been applied to six Florida International University (FIU) construction projects (case studies). The results showed that the IPD readiness of the organization was considerably low and several project functions can be improved by using higher and/or advanced level ICT tools and methods. Feedbacks from a focus group comprised of FIU officials and an independent group of experts had been received at various stages of this research and had been utilized during development and implementation of the model. Focus group input was also helpful for validation of the model and its results. It was hoped that the model developed would be useful to construction owner organizations in order to assess their IPD readiness and to identify appropriate ICT improvement strategies.^

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Integrated project delivery (IPD) method has recently emerged as an alternative to traditional delivery methods. It has the potential to overcome inefficiencies of traditional delivery methods by enhancing collaboration among project participants. Information and communication technology (ICT) facilitates IPD by effective management, processing and communication of information within and among organizations. While the benefits of IPD, and the role of ICT in realizing them, have been generally acknowledged, the US public construction sector is very slow in adopting IPD. The reasons are - lack of experience and inadequate understanding of IPD in public owner as confirmed by the results of the questionnaire survey conducted under this research study. The public construction sector should be aware of the value of IPD and should know the essentials for effective implementation of IPD principles - especially, they should be cognizant of the opportunities offered by advancements in ICT to realize this. In order to address the need an IPD Readiness Assessment Model (IPD-RAM) was developed in this research study. The model was designed with a goal to determine IPD readiness of a public owner organization considering selected IPD principles, and ICT levels, at which project functions were carried out. Subsequent analysis led to identification of possible improvements in ICTs that have the potential to increase IPD readiness scores. Termed as the gap identification, this process was used to formulate improvement strategies. The model had been applied to six Florida International University (FIU) construction projects (case studies). The results showed that the IPD readiness of the organization was considerably low and several project functions can be improved by using higher and/or advanced level ICT tools and methods. Feedbacks from a focus group comprised of FIU officials and an independent group of experts had been received at various stages of this research and had been utilized during development and implementation of the model. Focus group input was also helpful for validation of the model and its results. It was hoped that the model developed would be useful to construction owner organizations in order to assess their IPD readiness and to identify appropriate ICT improvement strategies.