928 resultados para Offshore operations


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The concrete offshore platforms, which are subjected a several loading combinations and, thus, requires an analysis more generic possible, can be designed using the concepts adopted to shell elements, but the resistance must be verify in particular cross-sections to shear forces. This work about design of shell elements will be make using the three-layer shell theory. The elements are subject to combined loading of membrane and plate, totalizing eight components of internal forces, which are three membrane forces, three moments (two out-of-plane bending moments and one in-plane, or torsion, moment) and two shear forces. The design method adopted, utilizing the iterative process proposed by Lourenco & Figueiras (1993) obtained from equations of equilibrium developed by Gupta (1896) , will be compared to results of experimentally tested shell elements found in the literature using the program DIANA.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents two approaches of Artificial Immune System for Pattern Recognition (CLONALG and Parallel AIRS2) to classify automatically the well drilling operation stages. The classification is carried out through the analysis of some mud-logging parameters. In order to validate the performance of AIS techniques, the results were compared with others classification methods: neural network, support vector machine and lazy learning.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The main concern of activities developed in oil and gas well construction is safety. But safety during the well construction process is not a trivial subject. Today risk evaluation approaches are based in static analyses of existent systems. In other words, those approaches do not allow a dynamic analysis that evaluates the risk for each alteration of the context. This paper proposes the use of Quantitative and Dynamic Risk Assessment (QDRA) to assess the degree of safety of each planned job. The QDRA can be understood as a safe job analysis approach, developed with the purpose of quantifying the safety degree in entire well construction and maintenance activities. The QDRA is intended to be used in the planning stages of well construction and maintenance, where the effects of hazard on job sequence are important unknowns. This paper also presents definitions of barrier, and barriers integrated set (BIS), and a modeling technique showing their relationships. (c) 2006 Elsevier B.V. All rights reserved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Petroleum well drilling is an expensive and risky operation. In this context, well design presents itself as a fundamental key to decrease costs and risks involved. Experience acquired by engineers is notably an important factor in good drilling design elaborations. Therefore, the loss of this knowledge may entail additional problems and costs. In this way, this work represents an initiative to model a petroleum well design case-based architecture. Tests with a prototype showed that the system built with this architecture may help in a well design and enable corporate knowledge preservation. (C) 2003 Elsevier B.V. B.V. All rights reserved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Microfacies analysis of marine carbonates cored by Petrobras well 1-SPS-6 in the offshore Santos Basin (southeastern Brazil) has revealed a remarkable fossil assemblage of calpionellids (colomiellids), favusellids, hedbergellids, globigerinelloidids, buliminids, radiolarians, inoceramid prisms, roveacrinids, and saccocomids(?) preserved in lower Albian calcimudstones-wackestones of the lower part of the Guaruja Formation. This assemblage represents an allochtonous accumulation in a deep neritic to shallow bathyal hypoxic environment. Besides 'saccocomid-like' sections, the only determinable sections of roveacrinids are thecal plates of Poecilocrinus dispandus elongatus Peck, 1943. This species was previously only known from the Weno Formation of Texas. The Brazilian material extends its records farther south from at least the lower Albian, which then represents the earliest occurrence of this peculiar family in the South Atlantic region. Taking into account their Albian global distribution and the location of their oldest representative (Hauterivian near Alicante, Spain), the Roveacrinidae dispersed westward throughout all of Cretaceous Tethys. The Tethyan origin of Roveacrinidae is further evidence that, during late Aptian-Albian times, the northern South Atlantic (north of the Walvis-SBo Paulo Ridge) was supplied by a Tethyan water mass. (C) 2001 Elsevier B.V. Ltd. All rights reserved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The development of an offshore field demands knowledge of many experts to choose the different components of an offshore production system. All the specialized parts of this knowledge are intrinsically related. The aim of this paper is to use Fuzzy Sets and knowledge-based systems to describe and formalize the phases of development of an offshore production system project, in order to share and to manage the required knowledge for carrying out a project, while at the same time proposing alternatives for the oil field configuration.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Over the last quarter century, Petrobras has continually developed tools, techniques and methods to predict and to deal with organic deposition problems in offshore fields.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

During the petroleum well drilling operation many mechanical and hydraulic parameters are monitored by an instrumentation system installed in the rig called a mud-logging system. These sensors, distributed in the rig, monitor different operation parameters such as weight on the hook and drillstring rotation. These measurements are known as mud-logging records and allow the online following of all the drilling process with well monitoring purposes. However, in most of the cases, these data are stored without taking advantage of all their potential. On the other hand, to make use of the mud-logging data, an analysis and interpretationt is required. That is not an easy task because of the large volume of information involved. This paper presents a Support Vector Machine (SVM) used to automatically classify the drilling operation stages through the analysis of some mud-logging parameters. In order to validate the results of SVM technique, it was compared to a classification elaborated by a Petroleum Engineering expert. © 2006 IEEE.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper describes an investigation of the hybrid PSO/ACO algorithm to classify automatically the well drilling operation stages. The method feasibility is demonstrated by its application to real mud-logging dataset. The results are compared with bio-inspired methods, and rule induction and decision tree algorithms for data mining. © 2009 Springer Berlin Heidelberg.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In order for the projects of recovery of degraded areas to be successful, it is necessary to have a perfect recovery of the soil where the revegetation will be implanted as an initial action in the recovery of the whole process. The use of native forest species fully adapted to these types of terrain is another aspect of great importance, once the non-selection of these species, even if abundant in the surrounding areas, as it is in our case, implies great mortality of individuals during the planting and their low fixation during the process. The establishment of a monitoring program that contemplates the advancements obtained in the soil, the vegetation and the return of wild animals also collaborate in the evaluation of the success of the process. And, finally, the effective participation of the mining company, accepting and applying the techniques tested and indicated by research, even if, initially, the return time is longer than expected, also guarantees the success of the process. The mining company not only implemented a partnership with important universities in Brazil to obtain solutions for the environmental problems but also applied the developed techniques and the monitoring program. In the present work, we have attempted to summarize important aspects to evaluate the advancements in the rehabilitation plan for those areas, being here presented some results of the monitoring of areas under different levels of recovery, in accordance with the techniques adopted. Biological parameters of the soil were used to verify the efficiency of these different techniques in the recovery process. This work is part of the monitoring program of areas in rehabilitation by the mining company, implemented as of 1999 and in partnership with universities. The microbial activity was determined through the quantification of the carbon and nitrogen microbial biomass (BMC and BMN) and the activity of the dehydrogenase evaluated in the mining floor and tailing areas in different levels of soil preparation and planting of native species. The analysis of the parameters studied revealed that the preparation of the soil, following the three years proposed by the methodology, was important for the success in establishing the rehabilitation process. Some of the areas analyzed already show some parameters with values close or superior to those found in the capoeira (secondary forest), the latter being the non-treated area. © 2010 WIT Press.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The objective of this study is to understand how an assembly company, that is considered a focal company in the chain of Brazilian white goods sector, can influence the supply chain management established with its first tier suppliers. This is an exploratory qualitative study in which the information was gathered through direct observations, documents' retention, and data from interviews held with management-level employees of the sales and product development areas of the focal company and of the production area of the suppliers' companies. This study indicates that the operations strategy of the focal company influences the supply chain management and that the common business processes shared by its suppliers are a way to verify the truth of such statement. The suppliers cooperate closely with the focal company when complementing their business processes and consequently supporting the company to pursue its operations strategy. A set of mechanisms to aid the comprehension of how the operations strategy can affect the business processes and therefore to achieve the result of this research were adopted. © EuroJournals Publishing, Inc. 2012.