887 resultados para Large power system
Resumo:
The recent changes concerning the consumers’ active participation in the efficient management of load devices for one’s own interest and for the interest of the network operator, namely in the context of demand response, leads to the need for improved algorithms and tools. A continuous consumption optimization algorithm has been improved in order to better manage the shifted demand. It has been done in a simulation and user-interaction tool capable of being integrated in a multi-agent smart grid simulator already developed, and also capable of integrating several optimization algorithms to manage real and simulated loads. The case study of this paper enhances the advantages of the proposed algorithm and the benefits of using the developed simulation and user interaction tool.
Resumo:
The increase of electricity demand in Brazil, the lack of the next major hydroelectric reservoirs implementation, and the growth of environmental concerns lead utilities to seek an improved system planning to meet these energy needs. The great diversity of economic, social, climatic, and cultural conditions in the country have been causing a more difficult planning of the power system. The work presented in this paper concerns the development of an algorithm that aims studying the influence of the issues mentioned in load curves. Focus is given to residential consumers. The consumption device with highest influence in the load curve is also identified. The methodology developed gains increasing importance in the system planning and operation, namely in the smart grids context.
Resumo:
The current practices in the consumption metering by electricity utilities is currently largely based on monthly consumption reading. The consumption metering device is always calculating the cumulative consumption. Then, it is possible to calculate the difference between the actual and the previous consumption evaluation in order to estimate the monthly consumption. The power systems planning needs in many aspects to handle consumption data obtained for shorter periods, namely in the Demand Response programs planning. The work presented in this paper is based on the application of typical consumption profiles that are previously defined for a certain power system area. Such profiles are then used in order to estimate the 15 minutes consumption for a certain consumer or consumer type.
Resumo:
The recent changes on power systems paradigm requires the active participation of small and medium players in energy management. With an electricity price fluctuation these players must manage the consumption. Lowering costs and ensuring adequate user comfort levels. Demand response can improve the power system management and bring benefits for the small and medium players. The work presented in this paper, which is developed aiming the smart grid context, can also be used in the current power system paradigm. The proposed system is the combination of several fields of research, namely multi-agent systems and artificial neural networks. This system is physically implemented in our laboratories and it is used daily by researchers. The physical implementation gives the system an improvement in the proof of concept, distancing itself from the conventional systems. This paper presents a case study illustrating the simulation of real-time pricing in a laboratory.
Resumo:
Os combustíveis fósseis, como o carvão, o petróleo e o gás, constituem fontes de energia que em breve se esgotarão e que são demasiado caras para serem desperdiçadas pelas centrais elétricas na produção de electricidade. Para além desse facto, existem outros argumentos (sobretudo económicos) que inviabilizam a utilização destas fontes de energia em algumas regiões, abrindo caminho a fontes de energia alternativas (e.g. solar, eólica, biomassa, mini-hídricas, geotérmicas, etc) e preferencialmente com contornos locais. No caso particular de Moçambique, tem-se verificado um interesse crescente por parte do governo e de várias ONGs na promoção do uso de energias alternativas para as zonas onde a energia convencional não chega e não chegará, devido aos custos muito elevados que esse processo acarretaria. Esta dissertação apresenta um estudo aprofundado do dimensionamento dum sistema híbrido de geração de energia elétrica envolvendo gerador FV e grupo eletrogéneo de emergência para a Escola Rural da Nangade, situada no Distrito de Nangade, na Província do Cabo Delgado. São também descritos os diversos componentes e as tecnologias associadas a um sistema deste género, com a inclusão de sistemas inteligentes de controlo de energia com a utilização de inversores bidireccionais (inversores de bateria e carregadores) para sistemas isolados. Os resultados são apresentados de forma a facilitar a aplicação e montagem deste tipo de sistemas in loco. Espera-se que esta dissertação possa servir de base no futuro próximo, para a implementação deste tipo de sistemas para permitir a melhoria da qualidade de ensino através de melhores infraestruturas, democratizando desta forma o acesso à educação para as crianças das zonas rurais das várias províncias de Moçambique. Como as energias renováveis são parte integrante do Sistema Elétrico Nacional, apresenta-se resumidamente, no anexo 17, o “Plano de Desenvolvimento na Área de Energia de Moçambique”.
Resumo:
No âmbito do desenvolvimento da dissertação do Mestrado de Engenharia Eletrotécnica – Sistemas Elétricos de Energia, surgiu a oportunidade de participar no desenvolvimento de um projeto integrante numa subestação de energia. O presente caso de estudo tem em vista a resolução de condicionantes na conceção desta subestação, tais como cumprir requisitos estéticos projetando todo o tipo de equipamentos dentro de edifícios, a ventilação das salas de transformação assim como insonorização de todo o ruído produzido de forma a cumprir os limites legais e não perturbar a vizinhança. A presente subestação de energia está situada numa zona urbana da cidade de Leiria, localidade de Parceiros, dando origem ao nome Subestação de Energia de Parceiros. Esta subestação pertence ao cliente Energias de Portugal, conhecida como EDP, e visa o melhoramento da distribuição do serviço eléctrico. As tradicionais subestações de energia, com aparência bastante desenquadrada dos meios urbanos, representam um entrave ao nível da aproximação destes centros de produção energética às zonas urbanas, comprometendo a melhoria da rede elétrica. Desta forma, foi implementada a tecnologia Gas-Insolated Switchgear e permite o enquadramento destes centros energéticos em zonas urbanas, constituindo mais um edifício urbano na zona onde se insere. Esta substitui os convencionais barramentos existentes nos Parques Exteriores de Aparelhagem das subestações e apresenta-se com dimensões muito reduzidas quando comparadas com as estruturas instaladas nestes parques. Dado que esta tecnologia é desenvolvida no sentido de permitir a construção destes centros energéticos em zonas urbanas, podem ser alojadas dentro de edifícios produzindo assim vantagens ao nível estético, não perturbando a paisagem. Dado que os principais equipamentos de funcionamento na subestação de Parceiros, nomeadamente o Transformador de Potência, se encontram instalados num edifício completamente fechado, foram construídas duas salas de ventilação, na parte superior deste edifício, cada uma adjacente a uma sala de transformação. O transformador instalado possui elevadas dimensões, pesando 53000 kg e contendo 11000 kg de óleo que em estado normal de funcionamento circula por quase todo o interior da máquina a elevadas temperaturas, provocando um aquecimento elevado no interior do edifício o que condiciona o bom funcionamento do transformador. Para ultrapassar esta condicionante foi realizado um estudo de um sistema de ventilação capaz de avaliar e controlar os valores térmicos existentes e proceder à circulação de ar, que será movimentado ou bloqueado, recorrendo a um sistema autónomo, mantendo a temperatura ideal nas salas de transformação. Este autómato é o cérebro de toda a cadeia lógica que, mediante as leituras efetuadas irá dar ordens de atuação aos diversos equipamentos. Apesar dos TP estarem protegidos dentro do edifício, estes produzem um maior ruído. A necessidade da existência do referido sistema de ventilação das divisões de funcionamento destas máquinas, implica a utilização de aparelhos que, apesar da sua evolução tecnológica os torna cada vez menos ruidosos, mas geram sempre alguma perturbação, o que pode representar um problema no cumprimento do regulamento geral do ruído.
Resumo:
In the traditional paradigm, the large power plants supply the reactive power required at a transmission level and the capacitors and transformer tap changer were also used at a distribution level. However, in a near future will be necessary to schedule both active and reactive power at a distribution level, due to the high number of resources connected in distribution levels. This paper proposes a new multi-objective methodology to deal with the optimal resource scheduling considering the distributed generation, electric vehicles and capacitor banks for the joint active and reactive power scheduling. The proposed methodology considers the minimization of the cost (economic perspective) of all distributed resources, and the minimization of the voltage magnitude difference (technical perspective) in all buses. The Pareto front is determined and a fuzzy-based mechanism is applied to present the best compromise solution. The proposed methodology has been tested in the 33-bus distribution network. The case study shows the results of three different scenarios for the economic, technical, and multi-objective perspectives, and the results demonstrated the importance of incorporating the reactive scheduling in the distribution network using the multi-objective perspective to obtain the best compromise solution for the economic and technical perspectives.
Resumo:
Further improvements in demand response programs implementation are needed in order to take full advantage of this resource, namely for the participation in energy and reserve market products, requiring adequate aggregation and remuneration of small size resources. The present paper focuses on SPIDER, a demand response simulation that has been improved in order to simulate demand response, including realistic power system simulation. For illustration of the simulator’s capabilities, the present paper is proposes a methodology focusing on the aggregation of consumers and generators, providing adequate tolls for the demand response program’s adoption by evolved players. The methodology proposed in the present paper focuses on a Virtual Power Player that manages and aggregates the available demand response and distributed generation resources in order to satisfy the required electrical energy demand and reserve. The aggregation of resources is addressed by the use of clustering algorithms, and operation costs for the VPP are minimized. The presented case study is based on a set of 32 consumers and 66 distributed generation units, running on 180 distinct operation scenarios.
Resumo:
The electricity market restructuring, and its worldwide evolution into regional and even continental scales, along with the increasing necessity for an adequate integration of renewable energy sources, is resulting in a rising complexity in power systems operation. Several power system simulators have been developed in recent years with the purpose of helping operators, regulators, and involved players to understand and deal with this complex and constantly changing environment. The main contribution of this paper is given by the integration of several electricity market and power system models, respecting to the reality of different countries. This integration is done through the development of an upper ontology which integrates the essential concepts necessary to interpret all the available information. The continuous development of Multi-Agent System for Competitive Electricity Markets platform provides the means for the exemplification of the usefulness of this ontology. A case study using the proposed multi-agent platform is presented, considering a scenario based on real data that simulates the European Electricity Market environment, and comparing its performance using different market mechanisms. The main goal is to demonstrate the advantages that the integration of various market models and simulation platforms have for the study of the electricity markets’ evolution.
Resumo:
In 2014, the wind energy sector achieved a maturity status within the Portuguese power system. While it still experienced some additional capacity deployment (222 MW), after 15 years of intense deployment Portugal reached 4, 953 MW of installed wind power capacity by the end of 2014. Wind power represents 25% (considering only mainland Portugal) of the total operational capacity and 42% of renewable energy capacity in the country. In 2014, Portuguese wind parks produced 12.1 TWh maintaining a wind energy contribution of 24% of the annually electricity consumption. This high wind penetration was influenced by the favorable wind conditions observed in the first three months of the year over central and northern regions of mainland Portugal that also correspond to the largest concentration of installed wind capacity.
Resumo:
The MAP-i doctoral program of the Universities of Minho, Aveiro and Porto
Bidirectional battery charger with grid-to-vehicle, vehicle-to-grid and vehicle-to-home technologies
Resumo:
This paper presents the development of na on-board bidirectional battery charger for Electric Vehicles (EVs) targeting Grid-to-Vehicle (G2V), Vehicle-to-Grid (V2G), and Vehicle-to-Home (V2H) technologies. During the G2V operation mode the batteries are charged from the power grid with sinusoidal current and unitary power factor. During the V2G operation mode the energy stored in the batteries can be delivered back to the power grid contributing to the power system stability. In the V2H operation mode the energy stored in the batteries can be used to supply home loads during power outages, or to supply loads in places without connection to the power grid. Along the paper the hardware topology of the bidirectional battery charger is presented and the control algorithms are explained. Some considerations about the sizing of the AC side passive filter are taken into account in order to improve the performance in the three operation modes. The adopted topology and control algorithms are accessed through computer simulations and validated by experimental results achieved with a developed laboratory prototype operating in the different scenarios.
Resumo:
Dissertação de mestrado integrado em Engenharia Mecânica
Resumo:
Abstract This thesis proposes a set of adaptive broadcast solutions and an adaptive data replication solution to support the deployment of P2P applications. P2P applications are an emerging type of distributed applications that are running on top of P2P networks. Typical P2P applications are video streaming, file sharing, etc. While interesting because they are fully distributed, P2P applications suffer from several deployment problems, due to the nature of the environment on which they perform. Indeed, defining an application on top of a P2P network often means defining an application where peers contribute resources in exchange for their ability to use the P2P application. For example, in P2P file sharing application, while the user is downloading some file, the P2P application is in parallel serving that file to other users. Such peers could have limited hardware resources, e.g., CPU, bandwidth and memory or the end-user could decide to limit the resources it dedicates to the P2P application a priori. In addition, a P2P network is typically emerged into an unreliable environment, where communication links and processes are subject to message losses and crashes, respectively. To support P2P applications, this thesis proposes a set of services that address some underlying constraints related to the nature of P2P networks. The proposed services include a set of adaptive broadcast solutions and an adaptive data replication solution that can be used as the basis of several P2P applications. Our data replication solution permits to increase availability and to reduce the communication overhead. The broadcast solutions aim, at providing a communication substrate encapsulating one of the key communication paradigms used by P2P applications: broadcast. Our broadcast solutions typically aim at offering reliability and scalability to some upper layer, be it an end-to-end P2P application or another system-level layer, such as a data replication layer. Our contributions are organized in a protocol stack made of three layers. In each layer, we propose a set of adaptive protocols that address specific constraints imposed by the environment. Each protocol is evaluated through a set of simulations. The adaptiveness aspect of our solutions relies on the fact that they take into account the constraints of the underlying system in a proactive manner. To model these constraints, we define an environment approximation algorithm allowing us to obtain an approximated view about the system or part of it. This approximated view includes the topology and the components reliability expressed in probabilistic terms. To adapt to the underlying system constraints, the proposed broadcast solutions route messages through tree overlays permitting to maximize the broadcast reliability. Here, the broadcast reliability is expressed as a function of the selected paths reliability and of the use of available resources. These resources are modeled in terms of quotas of messages translating the receiving and sending capacities at each node. To allow a deployment in a large-scale system, we take into account the available memory at processes by limiting the view they have to maintain about the system. Using this partial view, we propose three scalable broadcast algorithms, which are based on a propagation overlay that tends to the global tree overlay and adapts to some constraints of the underlying system. At a higher level, this thesis also proposes a data replication solution that is adaptive both in terms of replica placement and in terms of request routing. At the routing level, this solution takes the unreliability of the environment into account, in order to maximize reliable delivery of requests. At the replica placement level, the dynamically changing origin and frequency of read/write requests are analyzed, in order to define a set of replica that minimizes communication cost.
Resumo:
Why are Bismarckian social security systems associated with largerpublic pension expenditures, a smaller fraction of private pension andlower income in-equality than Beveridgean systems? These facts arepuzzling for political economy theories of social security whichpredict that Beveridgean systems, involving intra-generationalredistribution, should enjoy larger support among low-income people andthus be larger. This paper explains these features in a bidimensionalpolitical economy model. In an economy with three income groups,low-income support a large, redistributive system; middle-income favoran earning-related system, while high-income oppose any public system,since they have access to a superior saving technology, a privatesystem. We show that, if income inequality is large, the voting majorityof high-income and low-income supports a (small) Beveridgean system,and a large private pillar arises; the opposite occurs with lowinequality. Additionally, when the capital market provides higherreturns, a Beveridgean system is more likely to emerge.