984 resultados para Emotional process
Resumo:
In the field of leadership studies transformational leadership theory (e.g., Bass, 1985; Avolio, Bass, & Jung, 1995) has received much attention from researchers in recent years (Hughes, Ginnet, & Curphy, 2009; Hunt, 1999). Many previous studies have found that transformational leadership is related to positive outcomes such as the satisfaction, motivation and performance of followers in organisations (Judge & Piccolo, 2004; Lowe, Kroeck, & Sivasubramaniam, 1996), including in educational institutions (Chin, 2007; Leithwoood & Jantzi, 2005). Hence, it is important to explore constructs that may predict leadership style in order to identify potential transformational leaders in leadership assessment and selection procedures. Several researchers have proposed that emotional intelligence (EI) is one construct that may account for hitherto unexplained variance in transformational leadership (Mayer, 2001; Watkin, 2000). Different models of EI exist (e.g., Goleman, 1995, 2001; Bar-On, 1997; Mayer & Salovey, 1997) but momentum is growing for the Mayer and Salovey (1997) model to be considered the most useful (Ashkanasy & Daus, 2005; Daus & Ashkanasy, 2005). Studies in non-educational settings claim to have found that EI is a useful predictor of leadership style and leader effectiveness (Harms & Crede, 2010; Mills, 2009) but there is a paucity of studies which have examined the Mayer and Salovey (1997) model of EI in educational settings. Furthermore, other predictor variables have rarely been controlled in previous studies and only self-ratings of leadership behaviours, rather than multiple ratings, have usually been obtained. Therefore, more research is required in educational settings to answer the question: to what extent is the Mayer and Salovey (1997) model of EI a useful predictor of leadership style and leadership outcomes? This project, set in Australian educational institutions, was designed to move research in the field forward by: using valid and reliable instruments, controlling for other predictors, obtaining an adequately sized sample of real leaders as participants and obtaining multiple ratings of leadership behaviours. Other variables commonly used to predict leadership behaviours (personality factors and general mental ability) were assessed and controlled in the project. Additionally, integrity was included as another potential predictor of leadership behaviours as it has previously been found to be related to transformational leadership (Parry & Proctor-Thomson, 2002). Multiple ratings of leadership behaviours were obtained from each leader and their supervisors, peers and followers. The following valid and reliable psychological tests were used to operationalise the variables of interest: leadership styles and perceived leadership outcomes (Multifactor Leadership Questionnaire, Avolio et al., 1995), EI (Mayer–Salovey–Caruso Emotional Intelligence Test, Mayer, Salovey, & Caruso, 2002), personality factors (The Big Five Inventory, John, Donahue, & Kentle, 1991), general mental ability (Wonderlic Personnel Test-Quicktest, Wonderlic, 2003) and integrity (Integrity Express, Vangent, 2002). A Pilot Study (N = 25 leaders and 75 raters) made a preliminary examination of the relationship between the variables included in the project. Total EI, the experiential area, and the managing emotions and perceiving emotions branches of EI, were found to be related to transformational leadership which indicated that further research was warranted. In the Main Study, 144 leaders and 432 raters were recruited as participants to assess the discriminant validity of the instruments and examine the usefulness of EI as a predictor of leadership style and perceived leadership outcomes. Scores for each leadership scale across the four rating levels (leaders, supervisors, peers and followers) were aggregated with the exception of the management-by-exception active scale of transactional leadership which had an inadequate level of interrater agreement. In the descriptive and measurement component of the Main Study, the instruments were found to demonstrate adequate discriminant validity. The impact of role and gender on leadership style and EI were also examined, and females were found to be more transformational as leaders than males. Females also engaged in more contingent reward (transactional leadership) behaviours than males, whilst males engaged in more passive/avoidant leadership behaviours than females. In the inferential component of the Main Study, multiple regression procedures were used to examine the usefulness of EI as a predictor of leadership style and perceived leadership outcomes. None of the EI branches were found to be related to transformational leadership or the perceived leadership outcomes variables included in the study. Openness, emotional stability (the inverse of neuroticism) and general mental ability (inversely) each predicted a small amount of variance in transformational leadership. Passive/avoidant leadership was inversely predicted by the understanding emotions branch of EI. Overall, EI was not found to be a useful predictor of leadership style and leadership outcomes in the Main Study of this project. Implications for researchers and human resource practitioners are discussed.
Resumo:
Due to the limitation of current condition monitoring technologies, the estimates of asset health states may contain some uncertainties. A maintenance strategy ignoring this uncertainty of asset health state can cause additional costs or downtime. The partially observable Markov decision process (POMDP) is a commonly used approach to derive optimal maintenance strategies when asset health inspections are imperfect. However, existing applications of the POMDP to maintenance decision-making largely adopt the discrete time and state assumptions. The discrete-time assumption requires the health state transitions and maintenance activities only happen at discrete epochs, which cannot model the failure time accurately and is not cost-effective. The discrete health state assumption, on the other hand, may not be elaborate enough to improve the effectiveness of maintenance. To address these limitations, this paper proposes a continuous state partially observable semi-Markov decision process (POSMDP). An algorithm that combines the Monte Carlo-based density projection method and the policy iteration is developed to solve the POSMDP. Different types of maintenance activities (i.e., inspections, replacement, and imperfect maintenance) are considered in this paper. The next maintenance action and the corresponding waiting durations are optimized jointly to minimize the long-run expected cost per unit time and availability. The result of simulation studies shows that the proposed maintenance optimization approach is more cost-effective than maintenance strategies derived by another two approximate methods, when regular inspection intervals are adopted. The simulation study also shows that the maintenance cost can be further reduced by developing maintenance strategies with state-dependent maintenance intervals using the POSMDP. In addition, during the simulation studies the proposed POSMDP shows the ability to adopt a cost-effective strategy structure when multiple types of maintenance activities are involved.
Resumo:
Identifying, modelling and documenting business processes usually requires the collaboration of many stakeholders that may be spread across companies in inter-organizational business settings. While there are many process modelling tools available, the support they provide for remote collaboration is still limited. This demonstration showcases a novel prototype application that implements collaborative virtual environment and augmented reality technologies to improve remote collaborative process modelling, with an aim to assisting common collaboration tasks by providing an increased sense of immersion in an intuitive shared work and task space. Our tool is easily deployed using open source software, and commodity hardware, and is expected to assist with saving money on travel costs for large scale process modelling projects covering national and international centres within an enterprise.
Resumo:
Business Process Management (BPM) is a top priority in organisations and is rapidly proliferating as an emerging discipline in practice. However, the current studies show lack of appropriate BPM skilled professionals in the field and a dearth of opportunities to develop BPM expertise. This paper analyses the gap between available BPM-related education in Australia and required BPM capabilities. BPM courses offered by Australian universities and training institutions have been critically analysed and mapped against leading BPM capability frameworks to determine how well current BPM education and training offerings in Australia actually address the core capabilities required for BPM professionals. The outcomes reported here can be used by Australian universities and training institutions to better align and position their training materials to the BPM required capabilities. It could also be beneficial to individuals looking for a systematic and in-depth understanding of BPM capabilities and trainings.
Resumo:
Many initiatives to improve Business processes are emerging. The essential roles and contributions of Business Analyst (BA) and Business Process Management (BPM) professionals to such initiatives have been recognized in literature and practice. The roles and responsibilities of a BA or BPM practitioner typically require different skill-sets; however these differences are often vague. This vagueness creates much confusion in practice and academia. While both the BA and BPM communities have made attempts to describe their domains through capability defining empirical research and developments of Bodies of knowledge, there has not yet been any attempt to identify the commonality of skills required and points of uniqueness between the two professions. This study aims to address this gap and presents the findings of a detailed content mapping exercise (using NVivo as a qualitative data analysis tool) of the International Institution of Business Analysis (IIBA®) Guide to the Business Analysis Body of Knowledge (BABOK® Guide) against core BPM competency and capability frameworks.
Resumo:
A good faith reading of core international protection obligations requires that states employ appropriate legislative, administrative and judicial mechanisms to ensure the enjoyment of a fair and effective asylum process. Restrictive asylum policies instead seek to ‘denationalize’ the asylum process by eroding access to national statutory, judicial and executive safeguards that ensure a full and fair hearing of an asylum claim. From a broader perspective, the argument in this thesis recognizes hat international human rights depend on domestic institutions for their effective implementation, and that a rights-based international legal order requires that power is limited, whether that power is expressed as an instance of the sovereign right of states in international law or as the authority of governments under domestic constitutions.
Resumo:
The synthesis of polymerlike amorphous carbon(a-C:H) thin-films by microwave excited collisional hydrocarbon plasma process is reported. Stable and highly aromatic a-C:H were obtained containing significant inclusions of poly(p-phenylene vinylene) (PPV). PPV confers universal optoelectronic properties to the synthesized material. That is a-C:H with tailor-made refractive index are capable of becoming absorption-free in visible (red)-near infrared wavelength range. Production of large aromatic hydrocarbon including phenyl clusters and/or particles is attributed to enhanced coagulation of elemental plasma species under collisional plasma conditions. Detailed structural and morphological changes that occur in a-C:H during the plasma synthesis are also described.
Resumo:
Quality, as well as project success, in construction projects should be capable of being regarded as the fulfillment of expectation of those contributors and stakeholders involved in such projects. Although a significant amount of quality practices have been introduced within the industry, establishment and attainment of reasonable levels of quality internationally in construction projects continues to be an ongoing problem. To date, some investigation into the introduction and improvement of quality practices and stakeholder management in the construction industry has been accomplished independently, but so far no major studies have been completed that examine comprehensively how quality management practices that particularly concentrate on the stakeholders’ perspective of quality can be used to contribute to final project quality outcomes. This paper aims to examine the process for development of a framework for better involvement of stakeholders in quality planning and practices and subsequently to contribute to higher quality outcomes within construction projects. Through extensive literature review it highlights various perceptions of quality, categorizes quality issues with particular focus on benefits and shortcomings and also examines stakeholders’ viewpoint of project quality in order to promote the improvement of outcomes throughout a project’s lifecycle. It proposes a set of arranged information as a basis for development of prospective framework which ultimately aims to improve project quality outcomes. The subsequent framework that will be developed from this research will provide project managers and owners with the required information and strategic direction to achieve their own and their stakeholders’ targets for implementation of quality practices and achievement of high quality outcomes on their future projects.
Resumo:
The importance of actively managing and analysing business processes is acknowledged more than ever in organisations nowadays. Business processes form an essential part of an organisation and their application areas are manifold. Most organisations keep records of various activities that have been carried out for auditing purposes, but they are rarely used for analysis purposes. This paper describes the design and implementation of a process analysis tool that replays, analyses and visualises a variety of performance metrics using a process definition and its corresponding execution logs. The replayer uses a YAWL process model example to demonstrate its capacity to support advanced language constructs.