846 resultados para Cracking catalítico
Resumo:
Highway Research Project HR-392 was undertaken to evaluate cold in-place asphalt recycled (CIR) projects in the State of Iowa. The research involved assessment of performance levels, investigation of factors that most influence pavement performance and economy, and development of guidelines for CIR project selection. The performance was evaluated in two ways: Pavement Condition Indices (PCI, U.S. Corps of Engineers) were calculated and overall ratings were given on ride and appearance. A regression analysis was extrapolated to predict the future service life of CIR roads. The results were that CIR roads within the State of Iowa, with less than 2000 annual average daily traffic (AADT), have an average predicted service life of fifteen to twenty-six years. Subgrade stability problems can prevent a CIR project from being successfully constructed. A series of Dynamic Cone Penetrometer (DCP) tests were conducted on a CIR project that experienced varying levels of subgrade failure during construction. Based on this case study, and supporting data, it was determined that the DCP test can be used to evaluate subgrades that have insufficient stability for recycling. Overall, CIR roads in Iowa are performing well. It appears that the development of transverse cracking has been retarded and little rutting has occurred. Contracting agencies must pay special attention to the subgrade conditions during project selection. Because of its performance, CIR is a recommended method to be considered for rehabilitating aged low volume (<2000 AADT) asphalt concrete roads in Iowa.
Resumo:
The purpose of this project was to determine the feasibility of using pavement condition data collected for the Iowa Pavement Management Program (IPMP) as input to the Iowa Quadrennial Need Study. The need study, conducted by the Iowa Department of Transportation (Iowa DOT) every four years, currently uses manually collected highway infrastructure condition data (roughness, rutting, cracking, etc.). Because of the Iowa DOT's 10-year data collection cycles, condition data for a given highway segment may be up to 10 years old. In some cases, the need study process has resulted in wide fluctuations in funding allocated to individual Iowa counties from one study to the next. This volatility in funding levels makes it difficult for county engineers to plan and program road maintenance and improvements. One possible remedy is to input more current and less subjective infrastructure condition data. The IPMP was initially developed to satisfy the Intermodal Surface Transportation Efficiency Act (ISTEA) requirement that federal-aid-eligible highways be managed through a pavement management system. Currently all metropolitan planning organizations (MPOs) in Iowa and 15 of Iowa's 18 RPAs participate in the IPMP. The core of this program is a statewide data base of pavement condition and construction history information. The pavement data are collected by machine in two-year cycles. Using pilot areas, researchers examined the implications of using the automated data collected for the IPMP as input to the need study computer program, HWYNEEDS. The results show that using the IPMP automated data in HWYNEEDS is feasible and beneficial, resulting in less volatility in the level of total need between successive quadrennial need studies. In other words, the more current the data, the smaller the shift in total need.
Resumo:
Research is reported which attempted to identify construction procedures that will provide an improved centerline joint on asphalt concrete pavements. Various construction procedures and their evaluation are described. Core densities were made and visual inspections were made 3 years after construction. Center cracking was measured at 4, 5, and 6 years. The only procedure to rank the same when comparing cracking and density (delete the 1:1 slope shoe on the edge) is described. This procedure had the highest average density and also the least cracking through 1985. This method provided the best performance for 4 years after construction and involved the removal of the 1:1 slope shoe from the paver when placing the surface course. This method had 9.0% cracked after 4 years and 100% cracked after 6 years of service.
Resumo:
The objective of this research project was to evaluate the construction and service performance of ammonium phosphate/fly ash (APFA) treated base courses of crushed fines and/or unprocessed sand. Specific test results related to construction of the test sections were included in the 1987 construction report by Iowa State University. The performance of the experimental sections is dealt with in this final report. This 1986 project demonstrated that in all cases the control sections utilizing a Type B base experienced dramatically less cracking in the surface than the APFA treated base sections. The cost per mix and subsequent surface maintenance costs for the APFA base sections, especially those having a substantial amount of limestone, were higher than the Type B base control sections. This type of construction may prove to be economical only when petroleum product costs escalate.
Resumo:
The large concrete placements at the Burlington Bridge were expected to cause great temperature differentials within the individual placements. In an attempt to reduce cracking due to the large temperature differentials, the Iowa Department of Transportation required that contractors continuously monitor the temperatures and temperature differentials in the concrete placement to assure that the temperature differentials did not exceed 35 deg F. It was felt that if temperature differentials remained below 35 deg F, cracking would be minimized. The following is a summary of the background of the project, and what occurred during individual concrete placements. The following conclusions were drawn: 1) Side temperatures are cooler and more greatly affected by ambient air temperatures; 2) When the 35 deg F limit was exceeded, it was almost exclusively the center to side differential; 3) The top temperature increases substantially when a new pour is placed; 4) The use of ice and different cement types did seem to affect the overall temperature gain and the amount of time taken for any one placement to reach a peak, but did not necessarily prevent the differentials from exceeding the 35 deg F limit, nor prevent cracking in any placement; and 5) Larger placements have a greater tendency to exceed the differential limit.
Resumo:
Asphalt concrete resurfacing is the most commonly utilized rehabilitation practice used by the Iowa Department of Transportation. The major problem with asphalt concrete resurfacing is the reflective cracking from underlying cracks and joints in the portland cement concrete (PCC) pavement. Cracking and seating the PCC prior to an asphalt overlay was the construction method evaluated in this project. There was cracking and seating on portions of the project and portions were overlaid without this process. There were also different overlay thicknesses used. Comparisons of crack and seating to the normal overlay method and the different depths are compared in this report. Cracking and seating results in some structural loss, but does reduce the problem of reflection cracking.
Resumo:
We are depleting the once seemingly endless supply of aggregate available for concrete paving in Iowa. At the present time, some parts of our state do not have locally available aggregates of acceptable quality for portland cement concrete paving. This necessitates lengthy truck and rail hauls which frequently more than doubles the price of aggregate. In some parts of the state, the only coarse aggregates available locally are "d-cracking" in nature. Iowa's recycling projects were devised to alleviate the shortage of aggregates wherever they were found to have an economic advantage. We completed our first recycling project in 1976 on a 1.4 project in Lyon county. The data collected in this project was used to schedule two additional projects in 1977. The larger of these two projects is located in Page and Taylor county on Highway #2 and is approximately 15 miles in length. This material is to be crushed and re-used in the concrete paving, it is to be reconstructed on approximately the same alignment. The second project is part of the construction of Interstate I-680 north of council Bluffs where an existing 24 foot portland cement concrete roadway is to be recycled and used as the aggregate in the slip form econocrete subbase and the portland cement concrete shoulders.
Resumo:
Methods of improving highway safety are of major concern to everyone who is involved in the planning, development and construction of improvements of our vast highway network. Other major concerns are the conservation of our rapidly disappearing sources of energy and quality building materials. This research is devoted to further exploration of a process which will: 1. help preserve higher quality aggregates; and, 2. improve the frictional characteristics and surface texture of asphalt pavement surfaces. Sprinkle treatment of asphalt concrete pavement surfaces with a non-polishing aggregate, a procedure which was developed in Europe, is one method which has shown promise in accomplishing the above listed objectives. This research seeks to explore the feasibility and cost effectiveness of using standard asphalt mixtures of local, less expensive aggregates for surface courses followed by a surface sprinkle treatment of a hard, durable, non-polishing layer of precoated chips to produce a durable, non-skid pavement surface for safe highway travel. Three standard mixture types are being evaluated for aggregate retention characteristics and six sprinkle aggregates are being evaluated for durability, polishing and friction characteristics. In addition, measurements of the surface texture by the silicone putty method are being made. Another feature of this research is the evaluation of a rubberized asphalt material called Overflex MS as a crack filler. It has been reported that the material could be beneficial in reducing reflective cracking. The project was begun in July of 1978 and was completed in August. A review made in the spring of 1979 indicates very satisfactory performance. It was determined from slide photos taken after construction and again in the spring that aggregate retention was very good. However, many cracks had reflected indicating that the Overflex MS had not been effective. Follow up friction test results and texture analysis were also very good. The results of these tests are shown in Appendix A.
Resumo:
The objectives of this research were to develop a low cost fly ash-sand stabilized roadway and to correlate field performance with pavement design assumptions on a county road heavily trafficked by trucks hauling grain. The road was constructed during the summer of 1984. Three test sections comprised of different base thicknesses were incorporated in the roadway and were tested for compressive stength, structural rating, and rut depth. Annual crack surveys showed no appreciable difference in transverse cracking between the test sections and little to no rutting. The sandbase drainage characteristics beneath the roadway may have contributed to the satisfactory performance of the test sections. This project indicates that in spite of the inflated cost of construction due to the research nature of the work, a fly ash-sand base can be a viable alternative for roadway stabilization.
Resumo:
The Iowa Department of Transportation is evaluating the use of ground recycled crumb rubber from discarded tires in asphalt rubber cement. There were four projects completed during 1991 and another one constructed in 1992. This project is located on IA 140 north of Kingsley in Plymouth County. The project contains one section with reacted asphalt rubber cement (ARC) used in both binder and surface courses, one with reacted ARC used in the surface course and a conventional binder course, and a conventional mix control section. The reacted rubber binder course was placed on October 17, 1991 and the reacted rubber surface course was placed on October 17, 18, and 19. Inclement weather caused a slight delay in placing or constructing the surface. There was a minor problem with shoving and cracking of the binder course. The construction went well otherwise. Information included in this report consists of test results, construction reports, and cost comparisons.
Resumo:
An asphalt concrete (ACC) overlay is most often the rehabilitative effort used to maintain the serviceability of either an ACC or PCC pavement. The major problem in durability of this ACC overlay comes from reflective cracking. These cracks usually open, allowing water to enter the unsealed crack and strip the ACC in the overlay. The stripping of the ACC allows accelerated deterioration at the crack. Two engineering fabrics were evaluated in this project in order to determine their effectiveness in reducing reflective cracking. These two materials are: PavePrep, Contech Construction Products, Inc., and Pro-Guard, Phillips Fiber Corporation. A 4.2 km (2.6 mi) roadway in Audubon County was selected for the research project. The roadway was divided into eight test sections. Four of the test sections are conventional resurfacing. The other four sections are split between the two engineering fabrics (two Pro-Guard and two PavePrep). A 75 mm (3 in.) thick overlay was placed over the entire project.
Resumo:
A four and one-half inch thick, bonded portland cement concrete (PCC) overlay and integral widening were used to rehabilitate a 4.5 mile section of Iowa route 141 from US 169 to Iowa 210 in Dallas County. There was a substantial amount of cracking in the old 20 feet wide PCC pavement. Most of the widening, which was tied to the original slab by dowel bars, was placed as a four feet wide section on one side. Coring has shown that the overlay is well bonded and testing with the Delamtect has shown less than 1% debonding. Midpanel transverse cracks in the old pavement have reflected through the overlay (as expected). Some new transverse cracking has occurred. This cracking has not caused any significant problems. In general, the overlay is performing quite well.
Resumo:
In Iowa it is normal procedure to either use partial or full-depth patching to repair deteriorated areas of pavement prior to resurfacing. The Owens/Corning Corporation introduced a repair system to replace the patching process. Their Roadglas repair system was used in this research project on US 30 in Story County. It was installed in 1985 and has been observed annually since that time. There were some construction problems with slippage as the roller crossed the abundant Roadglas binder. It appears the Roadglas system has helped to control reflective cracking in the research areas. Since the time when this project was completed it has been reported that Owens/Corning has discontinued production of the Roadglas system.
Resumo:
In 1986, a 0.34 mile experimental section of polymerized asphalt cement (PAC30) concrete was placed in the westbound driving lane of Interstate 80 in western Iowa. It was used in a 2" asphalt concrete inlay using 20% recycled asphalt pavement. The virgin aggregate included 41% crushed gravel, 25% crushed quartzite and 14% natural sand. The evaluation of the project was severely limited when a 1987 reconstruction project extended into the experimental section leaving only 395 feet. Rut depths under a 4-foot gage were taken for a period of two years. No significant rutting occurred in the experimental polymerized section. The frequency of transverse cracking in the polymerized AC section was the same as that of the comparative AC-20 section. The asphalt paving mixture made with polymerized AC cost 120% of the cost of the conventional mix.
Resumo:
An 11.6 km research project was constructed in 1994 on a portion of Iowa Highway 21 in Iowa County, from U.S. 6 to Iowa Highway 212. This research is intended to evaluate the effect of four primary variables on long term performances of the PCC concrete overlay, commonly called whitetopping. The variables are thickness (50 mm, 100 mm, 150 mm, and 200 mm), joint spacing (0.6 m squares, 1.2 m squares, 1.8 m squares, and 4.6 m spacing), fiber use (concrete with and without polypropolene fibers) and surface preparation (patch only, scarifying the surface, and cold-in-place recycling). After two years, only two sections exhibit a small amount of debonding and distress cracking. Both sections are 50 mm thick. Within each of these two sections, only 2% of the area is affected. Two other 50 mm thick sections have a small number of cracks but no debonding has been found. No adverse effects of these cracks are evident. Three asphalt overlay sections were also constructed. In each asphalt section, transverse cracks have recently been found. At two years of age, the research sections are performing very well. An insignificant number of cracks and no distressed areas have been found in any research sections thicker than 50 mm.