890 resultados para Constrained interval arithmetic


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The von Neumann-Liouville time evolution equation is represented in a discrete quantum phase space. The mapped Liouville operator and the corresponding Wigner function are explicitly written for the problem of a magnetic moment interacting with a magnetic field and the precessing solution is found. The propagator is also discussed and a time interval operator, associated to a unitary operator which shifts the energy levels in the Zeeman spectrum, is introduced. This operator is associated to the particular dynamical process and is not the continuous parameter describing the time evolution. The pair of unitary operators which shifts the time and energy is shown to obey the Weyl-Schwinger algebra. (C) 1999 Elsevier B.V. B.V. All rights reserved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The objective of this study was to analyze the effect of two different high-intensity interval training (HIT) programs on selected aerobic physiological indices and 1500 and 5000 m running performance in well-trained runners. The following tests were completed (n = 17): (i) incremental treadmill test to determine maximal oxygen uptake (VO2max), running velocity associated with VO2 max (VVO2max), and the velocity corresponding to 3.5 mmol/L of blood lactate concentration (vOBLA); (ii) submaximal constant-intensity test to determine running economy (RE); and (iii) 1500 and 5000 m time trials on a 400 m track. Runners were then randomized into 95% vVO(2max) or 100% vVO(2max) groups, and undertook a 4 week training program consisting of 2 HIT sessions (performed at 95% or 100% vVO(2max), respectively) and 4 submaximal run sessions per week. Runners were retested on all parameters at the completion of the training program. The VO2 max values were not different after training for both groups. There was a significant increase in post-training vVO(2 max), RE, and 1500 in running performance in the 100% vVO(2 max) group. The vOBLA and 5000 m running performance were significantly higher after the training period for both groups. We conclude that vOBLA and 5000 m running performance can be significantly improved in well-trained runners using a 4 week training program consisting of 2 HIT sessions (performed at 95% or 100% vVO(2max)) and 4 submaximal run sessions per week. However, the improvement in vVO(2 max), RE, and 1500 in running performance seems to be dependent on the HIT program at 100% vVO(2 max).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Based on in vitro experiments, Bos indicus embryos were more resistant to heat stress (HS) than Bos taurus embryos. To increase knowledge regarding differences between Bos indicus and Bos taurus in resistance to HS, the primary objective of this study was to determine if tolerance to HS is due to the breed, origin of the oocyte, sperm, or both. Additionally, the influence of the interval between ovary acquisition (in the abattoir) and oocyte aspiration in the laboratory, on early embryo development was ascertained. Oocytes were collected from Nelore and Holstein cows in an abattoir; 4.0 or 6.5 h later, oocytes were aspired in the laboratory, and then matured and fertilized using semen from Nelore (N), Gir (GIR), or Holstein (H) bulls. Ninety-six h post insemination (hpi), embryos with >= 16 cells were divided in two groups: control and HS. In the control group, embryos were cultured at 39 degrees C, whereas in the HS group, embryos were subjected to 41 degrees C for 12 h, and then returned to 39 degrees C. Rates of cleavage, and formation of morula and blastocysts were higher (P < 0.05) for oocytes aspirated at 4.0 versus 6.5 h after ovaries were acquired. Heat stress decreased rates of blastocyst formation for all breeds (N X N; H x H; and H X GIR) and in both time intervals (4.0 and 6.5 h). However, N X N had higher cleavage rate (P < 0.05) in both time intervals when compared with H X H and H X GIR. In addition, Nelore oocytes fertilized with Nelore semen (N X N) had higher blastocyst yields (P < 0.05) in the control and HS group, when compared with the other two breeds (H X H and H X GIR). We concluded that the breed of origin of the oocyte was more important than that of the sperm for development of thermotolerance, because bull breed did not influence embryo development after HS, and in vitro early embryonic development was impaired by increasing (from 4 to 6.5 h) the interval between ovary acquisition and oocyte aspiration. (C) 2011 Elsevier B.V. All rights reserved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The slope of the distance-time relationship from maximal 200 and 400 in bouts (S(200-400)) has been increasingly employed for setting training intensities in swimming. However, physiological and mechanical responses at this speed are poorly understood. Thus, this study investigated blood lactate, heart rate (HR), stroke rate (SR), stroke length (SL) and RPE responses to an interval swimming set at S(200-400) in trained swimmers. In a 50-m pool, twelve athletes (16.5 +/- 1.2 yr, 176 +/- 7 cm, 68.4 +/- 5.4 kg, and 7.8 +/- 2.5% body fat) performed maximal 200 and 400 m crawl trials for S(200-400) determination (1.28 +/- 0.05 m/s). Thereafter, swimmers were instructed to perform 5 x 400 in at this speed with 1.5 min rest between repetitions. Three athletes Could not complete the set (exhaustion at 21.0 +/- 3.1 min). For the remaining swimmers (total set duration = 32.0 +/- 1.3 min) significant increases) (p < 0.05) in blood lactate (5.7 +/- 0.8-7.9 +/- 2.4 mmol/l), SR (29.6 +/- 3.2-32.1 +/- 4.1 cycles/min), HR (169 +/- 11-181 +/- 8 bpm) and RPE (13.3 +/- 1.6-16.3 +/- 2.6) were observed through the IS. Conversely, SL decreased significantly (p < 0.05) from the first to the fifth repetition (2.48 +/- 0.22-2.31 +/- 0.24 m/cycle). These results suggest that interval swimming at S(200-400) represents an intense physiological, mechanical and perceptual stimulus that can be sustained for a prolonged period by most athletes. (C) 2008 Sports Medicine Australia. Published by Elsevier Ltd. All rights reserved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

An economic model including the labor resource and the process stage configuration is proposed to design g charts allowing for all the design parameters to be varied in an adaptive way. A random shift size is considered during the economic design selection. The results obtained for a benchmark of 64 process stage scenarios show that the activities configuration and some process operating parameters influence the selection of the best control chart strategy: to model the random shift size, its exact distribution can be approximately fitted by a discrete distribution obtained from a relatively small sample of historical data. However, an accurate estimation of the inspection costs associated to the SPC activities is far from being achieved. An illustrative example shows the implementation of the proposed economic model in a real industrial case. (C) 2011 Elsevier B.V. All rights reserved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We show that the 2-matrix string model corresponds to a coupled system of 2 + 1-dimensional KP and modified KP ((m)KP2+1) integrable equations subject to a specific symmetry constraint. The latter together with the Miura-Konopelchenko map for (m)KP2+1 are the continuum incarnation of the matrix string equation. The (m)KP2+1 Miura and Backhand transformations are natural consequences of the underlying lattice structure. The constrained (m)KP2+1 system is equivalent to a 1 + 1-dimensional generalized KP-KdV hierarchy related to graded SL(3,1). We provide an explicit representation of this hierarchy, including the associated W(2,1)-algebra of the second Hamiltonian structure, in terms of free currents.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

An affine sl(n + 1) algebraic construction of the basic constrained KP hierarchy is presented. This hierarchy is analyzed using two approaches, namely linear matrix eigenvalue problem on hermitian symmetric space and constrained KP Lax formulation and it is shown that these approaches are equivalent. The model is recognized to be the generalized non-linear Schrödinger (GNLS) hierarchy and it is used as a building block for a new class of constrained KP hierarchies. These constrained KP hierarchies are connected via similarity-Bäcklund transformations and interpolate between GNLS and multi-boson KP-Toda hierarchies. Our construction uncovers the origin of the Toda lattice structure behind the latter hierarchy. © 1995 American Institute of Physics.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We formulate the constrained KP hierarchy (denoted by cKP K+1,M) as an affine sl(M + K+ 1) matrix integrable hierarchy generalizing the Drinfeld-Sokolov hierarchy. Using an algebraic approach, including the graded structure of the generalized Drinfeld-Sokolov hierarchy, we are able to find several new universal results valid for the cKP hierarchy. In particular, our method yields a closed expression for the second bracket obtained through Dirac reduction of any untwisted affine Kac-Moody current algebra. An explicit example is given for the case sl(M + K + 1), for which a closed expression for the general recursion operator is also obtained. We show how isospectral flows are characterized and grouped according to the semisimple non-regular element E of sl(M + K+ 1) and the content of the center of the kernel of E. © 1997 American Institute of Physics.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A standard X̄ chart for controlling the process mean takes samples of size n0 at specified, equally-spaced, fixed-time points. This article proposes a modification of the standard X chart that allows one to take additional samples, bigger than n0, between these fixed times. The additional samples are taken from the process when there is evidence that the process mean moved from target. Following the notation proposed by Reynolds (1996a) and Costa (1997) we shortly call the proposed X chart as VSSIFT X chart where VSSIFT means variable sample size and sampling intervals with fixed times. The X chart with the VSSIFT feature is easier to be administered than a standard VSSI X chart that is not constrained to sample at the specified fixed times. The performances of the charts in detecting process mean shifts are comparable. Copyright © 1998 by Marcel Dekker, Inc.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This experiment was developed in order to evaluation the efficiency of pheromone to control the pink bollworm and the total time of its release in cotton field. The experiment was installed in field conditions, in Chapadao do Sul/SP/Brazil, from January to April, 1998. The treatments consisted of 2 areas, being one of 30ha, where it was applied the pheromone and another of 10ha that was chosen as control area and did not receive pheromone. In the treated area, the laboratory synthesized sex pheromone (PB-Rope) was used thought of dispensers that allowed the slow and gradual release of the active substance. A total of 250 dispenser per hectare were evenly hand distributed in the area. The dispensers were wrapped around the plants. Both areas (treated area and untreated area) were monitored by delta trap. For evaluation of the boll damage, the treatment area was divided into 4 sub-areas. Twenty five green bolls were collected at random from each sub-area at 48 and 65 days after pheromone treatment. Bolls were cracked open by hand, and number of the bolls with symptoms of pink bollworm attacks was recorded. For evaluation of the productivity four areas were demarcated in each treatment, where all fibers and seeds harvested were weighted. Release rate of pheromone from dispenser was evaluated through of the weigh of the dispensers. Were marked and weighed in analytic scale, 20 dispensers contend the pheromone, being placed 10 dispensers under the cotton plants in treated area and other 10 dispensers in an open area. To every 15 days the dispensers were retired and weighed in analytic scale and soon after put back in the field in the same places. The results showed that only one application of mating disrupt pheromone, used in a dosage of 250 dispenser/ha, reached 80% of control for pink bollworm. the release period of pheromone from dispenser, after the application, was 120 days.