996 resultados para Caso-Controle
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Estudo de caso de controle estatístico de processo: levantamento estatístico de defeitos em molduras
Resumo:
This graduate work approaches the study of Statistical Process Control - SPC, in a stage production of an industrial frame, aiming to use the tool of statistical process control (SPC) to assess the process capability. Where the process needs improvement as well not meet the specifications. Assessing the needs that the company needs to improve quality management, and the difficulties they present during the implementation of the CEP. The present study is to use the method of case study. The results are presented through study of the level of defects using Pareto diagrams and control chart by - (p) fraction defective, and checking the capacity and stability of the process using control charts and histograms XbarraR. The process demonstrated the need for improvements in process and quality management. At the end of the work are presented suggestions for improving the quality system of the company
Resumo:
The crescent increasing demand of the electric power in Brazil has stimulated the implantation of Small Central Hydroelectric Power (SCHP) in several regions of the country. However, the silting up of the reservoirs is one of the main problems faced by hydroelectric power plants and SCHP. In this context, this research aimed evaluate the phenomenology and propose the enforcement of appropriate bioengineering techniques to control the intense erosive process of the hydrographical basin of the “Alto Rio Sucuriú,” that cause silting up of the reservoirs of the SCHP Costa Rica, located in the municipal district of Costa Rica (MS). In order to identify the phenomenology of the main falling in of this basin, a diagnosis of the conditions of the physical environment of the region (climate, geology, pedology, hydrology, and use of the ground) was realized. A surveying was also realized to specify the geometric feature of the falling in using the Total Station of the Ruide brand, series RTS 860R and the geodetic GPS of the Ashtech brand and the data obtained was used on the preparation of the Digital Elevation Model (DEM) of the falling in. Based on this diagnosis an official register of the falling in was done with identification of the different types of present erosion. Due to the advanced erosive stage of the falling in researched, the use of bioengineering techniques could be the best solution considering that the traditional engineering techniques make use of heavy material like concrete, iron and large machines that besides causing higher impact to the natural and esthetic aspects of the environment also require a higher investment of capital. This research establish a great cooperation to the knowledge of the erosive process and of the rehabilitation of the degraded areas with application of bioengineering techniques not only hydrographical basin of “Alto Rio Sucuriú” but also to other basins that show similar situation
Resumo:
This graduate work approaches the study of Statistical Process Control - SPC, in a stage production of an industrial frame, aiming to use the tool of statistical process control (SPC) to assess the process capability. Where the process needs improvement as well not meet the specifications. Assessing the needs that the company needs to improve quality management, and the difficulties they present during the implementation of the CEP. The present study is to use the method of case study. The results are presented through study, and checking the capacity and stability of the process using control charts XbarraR. The process demonstrated the need for improvements in process and quality management. At the end of the work are presented suggestions for improving the quality system of the company
Resumo:
Pós-graduação em Engenharia de Produção - FEB
Resumo:
Given the high competitiveness in the construction industry, businesses became necessary in a management which reduce costs and delivery times, and is fundamental to running a compatible planning with the magnitude of each work order is the same make feasible the executor. When it comes to planning, one is including both the physical planning of the work, time and duration of the events, as well as the preparation of the cost thereof. There are numerous ways to run the management of works, then it is necessary, in most cases, the planning experience, in previous works, the engineer in charge, because with it he should know what strategy to take the work skirt as planned and designed. For a complete and efficient management, an initial study hard to prepare the physical and financial planning it is necessary, in order to make it real and consistent throughout the execution of the work. It is necessary also a hard monitoring of both the physical and the financial schedule in order to what was initially planned to be completed as close as possible. This paper shows a case study which uses some ways to the management be held with the course of planning, medium and short term, as well as the preparation of the initial budget of the work. Will also be presented as is performed physical planning of a real estate work
Resumo:
Inclui notas explicativas e bibliográficas.
Resumo:
Na Revista de Informação Legislativa o artigo inclui bibliografia
Resumo:
Launching centers are designed for scientific and commercial activities with aerospace vehicles. Rockets Tracking Systems (RTS) are part of the infrastructure of these centers and they are responsible for collecting and processing the data trajectory of vehicles. Generally, Parabolic Reflector Radars (PRRs) are used in RTS. However, it is possible to use radars with antenna arrays, or Phased Arrays (PAs), so called Phased Arrays Radars (PARs). Thus, the excitation signal of each radiating element of the array can be adjusted to perform electronic control of the radiation pattern in order to improve functionality and maintenance of the system. Therefore, in the implementation and reuse projects of PARs, modeling is subject to various combinations of excitation signals, producing a complex optimization problem due to the large number of available solutions. In this case, it is possible to use offline optimization methods, such as Genetic Algorithms (GAs), to calculate the problem solutions, which are stored for online applications. Hence, the Genetic Algorithm with Maximum-Minimum Crossover (GAMMC) optimization method was used to develop the GAMMC-P algorithm that optimizes the modeling step of radiation pattern control from planar PAs. Compared with a conventional crossover GA, the GAMMC has a different approach from the conventional one, because it performs the crossover of the fittest individuals with the least fit individuals in order to enhance the genetic diversity. Thus, the GAMMC prevents premature convergence, increases population fitness and reduces the processing time. Therefore, the GAMMC-P uses a reconfigurable algorithm with multiple objectives, different coding and genetic operator MMC. The test results show that GAMMC-P reached the proposed requirements for different operating conditions of a planar RAV.
Resumo:
2009
Resumo:
Universidade Estadual de Campinas . Faculdade de Educação Física
Resumo:
Universidade Estadual de Campinas . Faculdade de Educação Física
Resumo:
INTRODUÇÃO: A Prótese Implantável de Condução Óssea (BAHA) consiste em uma excelente opção na reabilitação auditiva de pacientes com perda auditiva condutiva e mista uni ou bilateral, e sensorioneural unilateral. Tem sido uma alternativa vantajosa sobre os aparelhos de condução óssea convencionais e os aparelhos de amplificação sonora individuais (AASI) quando o uso dos mesmos fica impossibilitado pela presença de otite externa crônica de difícil controle clínico. OBJETIVO: Apresentar o primeiro caso de BAHA realizado no Brasil, após a autorização da ANVISA, para a reabilitação da perda auditiva mista com episódios de otite externa crônica. MÉTODO: Paciente do sexo feminino, 50 anos, com perda auditiva de grau moderado à direita e severo à esquerda, zumbido bilateral, decorrente de otosclerose, submetida a quatro cirurgias de estapedotomia e com impossibilidade de uso de AASI devido a otorreia e otalgia bilateral. A avaliação médica e audiológica indicaram o benefício do BAHA. Realizada a cirurgia e implantação do sistema BAHA, a paciente apresentou melhora significativa nos limiares audiométricos, na percepção e discriminação da fala, além de relatar extrema satisfação relacionada ao fator estético. COMENTÁRIOS FINAIS: O processo cirúrgico do BAHA é seguro, simples e rápido, proporcionando excelentes resultados audiológicos e alto grau de satisfação por parte dos pacientes.