886 resultados para Building management and operation
Resumo:
Growing demands for marine fish products is leading to increased pressure on already depleted wild populations and a rise in aquaculture production. Consequently, more captive-bred fish are released into the wild through accidental escape or deliberate releases. The increased mixing of captive-bred and wild fish may affect the ecological and/or genetic integrity of wild fish populations. Unambiguous identification tools for captive-bred fish will be highly valuable to manage risks (fisheries management) and tracing of escapees and seafood products (wildlife forensics). Using single nucleotide polymorphism (SNP) data from captive-bred and wild populations of Atlantic cod Gadus morhua L. and sole Solea solea L., we explored the efficiency of population and parentage assignment techniques for the identification and tracing of captive-bred fish. Simulated and empirical data were used to correct for stochastic genetic effects. Overall, parentage assignment performed well when a large effective population size characterized the broodstock and escapees originated from early generations of captive breeding. Consequently, parentage assignments are particularly useful from a fisheries management perspective to monitor the effects of deliberate releases of captive-bred fish on wild populations. Population assignment proved to be more efficient after several generations of captive breeding, which makes it a useful method in forensic applications for well-established aquaculture species. We suggest the implementation of a case-by-case strategy when choosing the best method.
Resumo:
Strong and sometimes extreme responses in runoff and soil erosion following wildfires have been reported worldwide. However, in the case of North-Central Portugal, little research had been carried out regarding the hydrologic and erosive impacts of several land management activities in recently burnt areas (such as ground preparation, post-fire logging or post-fire mitigation treatments). This study aims to assess post-fire runoff and soil erosion response on Eucalypt and Maritime pine plantations during the first, second and third years following wildfires. The effect of several pre-fire ground preparation operations (ploughed down-slope, contour ploughed and inclined terraces), post-fire logging activities (on both the eucalypt and pine plantations), as well as the application of hydromulch (a post-fire emergency treatment) on overland flow and soil erosion were compared to burnt but undisturbed and untreated areas. The intensive monitoring of runoff, soil erosion and selected soil properties served to determine the main factors involved in post-fire runoff and soil erosion and their spatial and temporal variation. Soil water repellency deserved special attention, due to its supposed important role for overland flow generation. Repeated rainfall simulation experiments (RSE’s), micro-scale runoff plots and bounded sediment fences were carried out and/or installed immediately after the wildfire on seven burnt slopes. Micro-scale runoff plots results under natural rainfall conditions were also compared to the RSE’s results, which was useful for assessing the representativeness of the data obtained with artificial rainfall. The results showed comparable runoff coefficient (20-60%) but lower sediment losses (125-1000 g m-2) than prior studies in Portugal, but especially outside Portugal. Lower sediment losses were related with the historic intensive land use in the area. In evaluating these losses, however, the shallowness and stoniness of the soils, as well as the high organic matter fraction of the eroded sediments (50%) must not be overlooked. Sediment limited erosion was measured in all the ploughed sites, probably due to the time since ploughing (several years). The disturbance of the soil surface cover due to post-fire logging and wood extraction substantially increased sediment losses at both the pine and eucalypt sites. Hydromulch effectiveness in reducing the runoff (70%) and sediment losses (83%) was attributed to the protective high coverage provided by hydromulch. The hydromulch significantly affected the soil cover and other soil properties and these changes also reduced the soil erosion risk. The rainfall amount was the main factor explaining the variance in runoff. However, a shift from rainfall amount to rainfall intensity was detected when either the surface cover or the infiltration capacity (hydrophilic conditions) increased. Sediment losses were controlled by rainfall intensity and surface cover. The role of soil water repellency on runoff generation was not consistent; the overall repellency levels alone were not enough to assess its hydrological impact. Soil water repellency explained runoff generation in the specific-sites model better than in the overall model. Additionally, soil moisture content was a better predictor for soil water repellency than antecedent rainfall. The natural rainfall results confirmed that RSE’s were able to capture the specific sediment losses and its organic matter content as well as the differences between the ploughed and unploughed sites. Repeated RSE’s also captured the seasonal variations in runoff and sediment losses attributed to soil water repellency. These results have implications for post-fire soil erosion modelling and soil conservation practices in the region, or areas with the same land use, climate and soil characteristics. The measured sediment loss, as well as the increasing frequency of ploughing in recently burnt and unburnt eucalypt stands, suggests ploughing is not an effective as a soil conservation measure. Logging activities with less impact are recommended in order to maintain the forest litter protecting the soil surface. Due to its high effectiveness in reducing runoff and soil erosion, hydromulch is recommended for highly sensitive and vulnerable areas.
Resumo:
The fast increase in the energy’s price has brought a growing concern about the highly expensive task of transporting water. By creating an hydraulic model of the Water Supply System’s (WSS) network and predicting its behaviour, it is possible to take advantage of the energy’s tariffs, reducing the total cost on pumping activities. This thesis was developed, in association with a technology transfer project called the E-Pumping. It focuses on finding a flexible supervision and control strategy, adaptable to any existent Water Supply System (WSS), as well as forecasting the water demand on a time period chosen by the end user, so that the pumping actions could be planned to an optimum schedule, that minimizes the total operational cost. The OPC protocol, associated to a MySQL database were used to develop a flexible tool of supervision and control, due to their adaptability to function with equipments from various manufacturers, being another integrated modular part of the E-Pumping project. Furthermore, in this thesis, through the study and performance tests of several statistical models based on time series, specifically applied to this problem, a forecasting tool adaptable to any station, and whose model parameters are automatically refreshed at runtime, was developed and added to the project as another module. Both the aforementioned modules were later integrated with an Graphical User Interface (GUI) and installed in a pilot application at the ADDP’s network. The implementation of this software on WSSs across the country will reduce the water supply companies’ running costs, improving their market competition and, ultimately, lowering the water price to the end costumer.
Resumo:
The effectiveness of a novel Post-Tensioned Metal Strapping (PTMS) technique at enhancing the seismic behaviour of a substandard RC building was investigated through full-scale shake-table tests during the EU-funded project BANDIT. The building had inadequate reinforcement detailing in columns and joints to replicate old construction practices. After the bare building was initially damaged significantly, it was repaired and strengthened with PTMS to perform additional seismic tests. The PTMS technique improved considerably the seismic performance of the tested building. Whilst the bare building experienced critical damage at an earthquake of PGA=0.15g, the PTMS-strengthened building sustained a PGA=0.35g earthquake without compromising stability.
Resumo:
Tese dout., Ciências e Tecnologias das Pescas, Universidade do Algarve, 2007
Resumo:
Discusses part of a project conducted by the authors into the logistics planning and management and costs of supplying biomass fuels to biomass-fired power stations in the UK. Defines biomass fuels and the reasons for the growth in interest in their use for electricity generation. The activities and parties involved in the biomass fuel supply chain are discussed together with the management of the chain in order to achieve smooth and consistent flow of biomass fuel to power stations. Explains the approach used to modelling the delivered costs of biomass fuels for four types of biomass fuel included in the project: forest fuel, short rotation coppice, straw and miscanthus. Comments are given on the environmental impacts of the fuel supply chains. The results indicate that straw supply systems are capable of producing the lowest delivered costs of the four fuels studied. Short rotation coppice and miscanthus, two new energy crops, are likely to have the highest delivered costs at present. This is due to the cost of growing these fuels and the financial incentives required by farmers to persuade them to grow these crops. Logistics costs (i.e. transport, storage and handling) are shown to represent a significant proportion of total delivered cost in biomass supply. Careful supply chain planning and logistics management will be of central importance to the success of the biomass industry.
Resumo:
This paper examines road freight transport activity and its relationship with facility location, logistics management and urban form through an analysis of 14 selected urban areas in the UK. Improved understanding of this relationship will assist planners when making transport and land use decisions. The findings suggest that several geographical, spatial and land use factors have important influences on freight activity in urban areas. Commercial and industrial land use patterns affect the types and quantities of goods produced, consumed, and hence the total quantity of freight transport handled. This also influences the distances over which goods are moved and by what specific mode. There has been relatively low growth in warehousing in many of the selected areas over the last decade compared to the national average as well suburbanisation of warehousing in some locations. This affects the origin and destination of journeys visiting these facilities and typically increases the distance of such journeys. A greater proportion of road freight has been shown to be lifted on internal journeys in large urban areas than in smaller ones. Journeys within urban areas have been shown to be less efficient than journeys to and from the urban area in the 14 locations studied due to the much smaller average vehicle carrying capacities and lower lading factors for journeys within urban areas. The length of haul on journeys to and from urban areas studied was found to be greatest for those areas with a major seaport and/or which were geographically remote. This affects the road freight transport intensity of goods transport journeys.
Resumo:
The career destiny of many graduate engineers is in industry. Quite how well prepared they were for that career became a matter of political importance in the late 1950s and early 1960s as the issue of Britain's relatively poor economic performance grew in salience. This article looks at this preparation with particular reference to management training. It examines the attitudes of those parties most interested in engineering education ‐ the government, industry, the engineering institutions and the educators themselves. All of these saw management training as being part of the formation of at least a portion of professional engineers at some stage in their career. But there was no general agreement between them about what this should consist of or when it should be provided. At the same time broader changes in engineering education were taking place which cut across and to some extent militated against attempts to enhance the role of management training. The result, it is argued, is that by the end of the 1960s little progress had been achieved.
Resumo:
A major determinant of the level of effective natural gas supply is the ease to feed customers, minimizing system total costs. The aim of this work is the study of the right number of Gas Supply Units – GSUs - and their optimal location in a gas network. This paper suggests a GSU location heuristic, based on Lagrangean relaxation techniques. The heuristic is tested on the Iberian natural gas network, a system modelized with 65 demand nodes, linked by physical and virtual pipelines. Lagrangean heuristic results along with the allocation of loads to gas sources are presented, using a 2015 forecast gas demand scenario.
Resumo:
The recent changes concerning the consumers’ active participation in the efficient management of load devices for one’s own interest and for the interest of the network operator, namely in the context of demand response, leads to the need for improved algorithms and tools. A continuous consumption optimization algorithm has been improved in order to better manage the shifted demand. It has been done in a simulation and user-interaction tool capable of being integrated in a multi-agent smart grid simulator already developed, and also capable of integrating several optimization algorithms to manage real and simulated loads. The case study of this paper enhances the advantages of the proposed algorithm and the benefits of using the developed simulation and user interaction tool.
Resumo:
BACKGROUND: The treatment of status epilepticus (SE) is based on relatively little evidence although several guidelines have been published. A recent study reported a worse SE prognosis in a large urban setting as compared to a peripheral hospital, postulating better management in the latter. The aim of this study was to analyse SE episodes occurring in different settings and address possible explanatory variables regarding outcome, including treatment quality. METHODS: Over six months we prospectively recorded consecutive adults with SE (fit lasting five or more minutes) at the Centre Hospitalier Universitaire Vaudois (CHUV) and in six peripheral hospitals (PH) in the same region. Demographical, historical and clinical variables were collected, including SE severity estimation (STESS score) and adherence to Swiss SE treatment guidelines. Outcome at discharge was categorised as "good" (return to baseline), or "poor" (persistent neurological sequelae or death). RESULTS: Of 54 patients (CHUV: 36; PH 18), 33% had a poor outcome. Whilst age, SE severity, percentage of SE episodes lasting less than 30 minutes and total SE duration were similar, fewer patients had a good outcome at the CHUV (61% vs 83%; OR 3.57; 95% CI 0.8-22.1). Mortality was 14% at the CHUV and 5% at the PH. Most treatments were in agreement with national guidelines, although less often in PH (78% vs 97%, P = 0.04). CONCLUSION: Although not statistically significant, we observed a slightly worse SE prognosis in a large academic centre as compared to smaller hospitals. Since SE severity was similar in the two settings but adherence to national treatment guidelines was higher in the academic centre, further investigation on the prognostic role of SE treatment and outcome determinants is required.
Resumo:
The outcome after primary percutaneous coronary intervention (pPCI) for ST-elevation myocardial infarction (STEMI) is strongly affected by time delays. In this study, we sought to identify the impact of specific socioeconomic factors on time delays, subsequent STEMI management and outcomes in STEMI patients undergoing pPCI, who came from a well-defined region of the French part of Switzerland. A total of 402 consecutive patients undergoing pPCI for STEMI in a large tertiary hospital were retrospectively studied. Symptom-to-first-medical-contact time was analysed for the following socioeconomic factors: level of education, origin and marital status. Main exclusion criteria were: time delay beyond 12 hours, previous treatment with fibrinolytic agents or patients immediately referred for coronary artery bypass graft surgery. Therefore, 222 patients were finally included. At 1 year, there was no difference in mortality between the different socioeconomic groups. Furthermore, there was no difference in management characteristics between them. Symptom-to-first-medical-contact time was significantly longer for patients with a low level of education, Swiss citizens and unmarried patients, with median differences of 23 minutes, 18 minutes and 13 minutes, respectively (p <0.05). Nevertheless, no difference was found regarding in-hospital management and clinical outcome. This study demonstrates that symptom-to-first-medical-contact time is longer amongst people with a lower educational level, Swiss citizens and unmarried people. Because of the low mortality rate in general, these differences in delays did not affect clinical outcomes. Still, tertiary prevention measures should particularly focus on these vulnerable populations.