Resumo:
While building provides shelter for human being, the previous models for assessing the intelligence of a building seldom consider the responses of occupants. In addition, the assessment is usually conducted by an authority organization on a yearly basis, thus can seldom provide timely assistance for facility manager to improve his daily facility maintenance performance. By the extending the law of entropy into the area of intelligent building, this paper demonstrate that both energy consumption and the response of occupants are important when partially assessing the intelligence of a building. This study then develops a sensor based real time building intelligence (BI) assessment model. An experimental case study demonstrates how the model can be implemented. The developed model can address the two demerits of the previous BI assessment model.
Resumo:
The overall significance of the construction and building services sector internationally cannot be overemphasised. In the UK, the industry currently accounts for 10% gross domestic product (GDP) and employs 2 million people, which is more than 1 in 14 of the total workforce. However, regardless of its output (approximately £65 billion annually) there has been a steady decline in the number of trade entrants into the construction and building services sector. Consequently, the available ‘pool of labour’ is inadequately resourced; productivity is low; the existing labour force is overstressed; there is an increase in site deaths; and a long-term labour shortage is envisaged. Today, the evidence seems to suggest that multiskilling is a tentative redress for ameliorating the skills crisis in the construction and building sectors. A 43-year time-series of data on 23 manpower attributes was evaluated as part of this investigation. The developed linear regression models show that the concept of multiskilling obeys the ‘law of diminishing returns'. That is, a weak relation was found between construction output and a three or more combination of manpower attributes. An optimisation model is prescribed for traditional trades.
Resumo:
Identification of cost-determinant variables and evaluation of their degree of influence play an essential role in building reliable cost models and enhance the competitive edge of quantity surveyors as well as contracting organisations. Sixty-seven variables affecting pre-tender construction cost estimates are identified through literature and interviews. These factors are grouped into six categories and a comparison analysis of their impact is conducted. Priority ranking of cost-influencing factors is carried out using a questionnaire survey commissioned amongst quantity surveyors based in the UK. Findings of this survey indicate that there is a strong agreement between quantity surveyors in ranking cost-influencing factors of construction projects. Comparisons between the outcomes of this research and other related studies are presented.
Resumo:
A wind catcher/tower natural ventilation system was installed in a seminar room in the building of the School of Construction Management and Engineering, the University of Reading in the UK . Performance was analysed by means of ventilation tracer gas measurements, indoor climate measurements (temperature, humidity, CO2) and occupant surveys. In addition, the potential of simple design tools was evaluated by comparing observed ventilation results with those predicted by an explicit ventilation model and the AIDA implicit ventilation model. To support this analysis, external climate parameters (wind speed and direction, solar radiation, external temperature and humidity) were also monitored. The results showed the chosen ventilation design provided a substantially greater ventilation rate than an equivalent area of openable window. Also air quality parameters stayed within accepted norms while occupants expressed general satisfaction with the system and with comfort conditions. Night cooling was maximised by using the system in combination with openable windows. Comparisons of calculations with ventilation rate measurements showed that while AIDA gave reasonably correlated results with the monitored performance results, the widely used industry explicit model was found to over estimate the monitored ventilation rate.
Resumo:
Change within the construction sector has been a central concern of governments and a select few private-sector clients for a considerable time. The discourse of change emanating from organizations concerned with reform in the construction sector reflects these ongoing concerns for change in the sector. The underlying assumptions of the content of change and appropriate change mechanisms in the UK are critically examined and challenged. In particular, the limitations of measurement and best practice are explored. The allegiance to approaches based on measurement and best practice is acontextual, unreflective and insufficient in providing wholly reliable explanations for the relationship between practice and performance. Claims for the use of measurement and best practice by the reform movement must therefore be understood to have limitations and their use approached with caution. The emphasis on best practice is also understood to direct attention away from understanding the legitimacy of current practice and change within the UK construction sector. An agenda for change in the UK construction sector will need to engage with and be more reflective of current managerial practice and past change initiatives. Contextual approaches such as structuration theory offer a way in which to underpin a research framework that could support the reform movement in setting such an agenda.
Resumo:
An overtly critical perspective on 're-engineering construction' is presented. It is contended that re-engineering is impossible to define in terms of its substantive content and is best understood as a rhetorical label. In recent years, the language of re-engineering has heavily shaped the construction research agenda. The declared goals are to lower costs and improve value for the customer. The discourse is persuasive because it reflects the ideology of the 'enterprise culture' and the associated rhetoric of customer responsiveness. Re-engineering is especially attractive to the construction industry because it reflects and reinforces the existing dominant way of thinking. The overriding tendency is to reduce organizational complexities to a mechanistic quest for efficiency. Labour is treated as a commodity. Within this context, the objectives of re-engineering become 'common sense'. Knowledge becomes subordinate to the dominant ideology of neo-liberalism. The accepted research agenda for re-engineering construction exacerbates the industry's problems and directly contributes to the casualization of the workforce. The continued adherence to machine metaphors by the construction industry's top management has directly contributed to the 'bad attitudes' and 'adversarial culture' that they repeatedly decry. Supposedly neutral topics such as pre-assembly, partnering, supply chain management and lean thinking serve only to justify the shift towards bogus labour-only subcontracting and the associated reduction of employment rights. The continued casualization of the workforce raises real questions about the industry's future capacity to deliver high-quality construction. In order to appear 'relevant' to the needs of industry, it seems that the research community is doomed to perpetuate this regressive cycle.
Resumo:
It is contended that competitiveness is better understood as a discourse rather than as a characteristic that is supposedly possessed. The discourse of competitiveness derives its legitimacy from the enterprise culture that came to dominance during the 1980s. Current popularized theories of competitiveness are constituent parts of this broader discourse, which has had significant material implications for the UK construction sector. The dominant discourse of competitiveness amongst contracting firms is shaped by the need to achieve structural flexibility to cope with fluctuations in demand. Fashionable espoused improvement recipes such as total quality management, business process re-engineering, and lean construction legitimize and reinforce the material manifestations of the enterprise culture. In consequence, the UK industry is characterized by a plethora of hollowed-out firms that have failed to invest in their human capital. While the adopted model may be rational for individual firms, the systemic effect across the sector as a whole equates to a form of anorexia. However, the discourse of competitiveness is by no means monolithic and continues to be contested locally. There have also been numerous counter-discourses that have been mobilized in response to the undesirable externalities of unbridled enterprise. Currently, important counter-discourses promote the ideas of sustainability and corporate social responsibility.
Resumo:
The existing literature on lean construction is overwhelmingly prescriptive with little recognition of the social and politicised nature of the diffusion process. The prevailing production-engineering perspective too often assumes that organizations are unitary entities where all parties strive for the common goal of 'improved performance'. An alternative perspective is developed that considers the diffusion of lean construction across contested pluralistic arenas. Different actors mobilize different storylines to suit their own localized political agendas. Multiple storylines of lean construction continuously compete for attention with other management fashions. The conceptualization and enactment of lean construction therefore differs across contexts, often taking on different manifestations from those envisaged. However, such localized enactments of lean construction are patterned and conditioned by pre-existing social and economic structures over which individual managers have limited influence. Taking a broader view, 'leanness' can be conceptualized in terms of a quest for structural flexibility involving restructuring, downsizing and outsourcing. From this perspective, the UK construction industry can be seen to have embarked upon leaner ways of working in the mid-1970s, long before the terminology of lean thinking came into vogue. Semi-structured interviews with construction sector policy-makers provide empirical support for the view that lean construction is a multifaceted concept that defies universal definition.
Resumo:
Because of the importance and potential usefulness of construction market statistics to firms and government, consistency between different sources of data is examined with a view to building a predictive model of construction output using construction data alone. However, a comparison of Department of Trade and Industry (DTI) and Office for National Statistics (ONS) series shows that the correlation coefcient (used as a measure of consistency) of the DTI output and DTI orders data and the correlation coefficient of the DTI output and ONS output data are low. It is not possible to derive a predictive model of DTI output based on DTI orders data alone. The question arises whether or not an alternative independent source of data may be used to predict DTI output data. Independent data produced by Emap Glenigan (EG), based on planning applications, potentially offers such a source of information. The EG data records the value of planning applications and their planned start and finish dates. However, as this data is ex ante and is not correlated with DTI output it is not possible to use this data to describe the volume of actual construction output. Nor is it possible to use the EG planning data to predict DTI construc-tion orders data. Further consideration of the issues raised reveal that it is not practically possible to develop a consistent predictive model of construction output using construction statistics gathered at different stages in the development process.
Resumo:
Firms form consortia in order to win contracts. Once a project has been awarded to a consortium each member then concentrates on his or her own contract with the client. Therefore, consortia are marketing devices, which present the impression of teamworking, but the production process is just as fragmented as under conventional procurement methods. In this way, the consortium forms a barrier between the client and the actual construction production process. Firms form consortia, not as a simple development of normal ways of working, but because the circumstances for specific projects make it a necessary vehicle. These circumstances include projects that are too large or too complex to undertake alone or projects that require on-going services which cannot be provided by the individual firms inhouse. It is not a preferred way of working, because participants carry extra risk in the form of liability for the actions of their partners in the consortium. The behaviour of members of consortia is determined by their relative power, based on several factors, including financial commitment and ease of replacement. The level of supply chain visibility to the public sector client and to the industry is reduced by the existence of a consortium because the consortium forms an additional obstacle between the client and the firms undertaking the actual construction work. Supply chain visibility matters to the client who otherwise loses control over the process of construction or service provision, while remaining accountable for cost overruns. To overcome this separation there is a convincing argument in favour of adopting the approach put forward in the Project Partnering Contract 2000 (PPC2000) Agreement. Members of consortia do not necessarily go on to work in the same consortia again because members need to respond flexibly to opportunities as and when they arise. Decision-making processes within consortia tend to be on an ad hoc basis. Construction risk is taken by the contractor and the construction supply chain but the reputational risk is carried by all the firms associated with a consortium. There is a wide variation in the manner that consortia are formed, determined by the individual circumstances of each project; its requirements, size and complexity, and the attitude of individual project leaders. However, there are a number of close working relationships based on generic models of consortia-like arrangements for the purpose of building production, such as the Housing Corporation Guidance Notes and the PPC2000.
Resumo:
As a method of procuring the services of the built environment, performance-based contracting (PBC) seeks to link the building supplier to longer term commitments than has traditionally been the case in the construction sector. By rewarding the building producer according to the way that building or structure delivers the users' requirements, rather than according to a list of assembled parts, a number of additional risks are taken by contractors, including fitness for purpose, costs and briefing. The extent to which contractors recognize these risks and their methods of dealing with them vary considerably and are influenced by their attitudes towards risk. As the risks associated with PBC are seen as large, uninsurable, and vulnerable to changing client requirements, the majority of respondents would reject the use of PBC as a method of contracting. Nevertheless, PBC may be used under particular conditions, where rewards are deemed sufficient to compensate for the additional risk to the contractor of undertaking work on the basis of a stream of payments paid over the life of a structure depending on the satisfactory performance of the building or as part of a private finance initiative.