990 resultados para walking capacity
Resumo:
The primary objective of this paper is to study the use of medical image-based finite element (FE) modelling in subjectspecific midsole design and optimisation for heel pressure reduction using a midsole plug under the calcaneus area (UCA). Plugs with different relative dimensions to the size of the calcaneus of the subject have been incorporated in the heel region of the midsole. The FE foot model was validated by comparing the numerically predicted plantar pressure with biomechanical tests conducted on the same subject. For each UCA midsole plug design, the effect of material properties and plug thicknesses on the plantar pressure distribution and peak pressure level during the heel strike phase of normal walking was systematically studied. The results showed that the UCA midsole insert could effectively modify the pressure distribution, and its effect is directly associated with the ratio of the plug dimension to the size of the calcaneus bone of the subject. A medium hardness plug with a size of 95% of the calcaneus has achieved the best performance for relieving the peak pressure in comparison with the pressure level for a solid midsole without a plug, whereas a smaller plug with a size of 65% of the calcaneus insert with a very soft material showed minimum beneficial effect for the pressure relief.
Resumo:
Following the Association of Southeast Asian Nations (ASEAN) senior transport officials meeting in May 2011, the Secretariat requested the Asian Development Bank (ADB) to provide assistance to improve road safety in ASEAN. In response, ADB, funded by the Japan Fund for Poverty Reduction, has begun an innovative approach to capacity building that has already been adapted and replicated in other sub-regions. This paper will discuss the model central to the project. The Road Safety Capacity Building for ASEAN Project commenced in May 2013. Each country has appointed a National Focal Point (NFP) to identify and coordinate information. A team of International Experts were appointed to develop materials and present a comprehensive train the trainer program focused on five key areas. Thirty eight senior Government officers from across ASEAN attended a two week program at ADB headquarters in Manila and will arrange and deliver specific training and associated activities to other colleagues within their country. ADB has appointed a National Consultant to work in partnership with the trainees on a range of activities including development of “pipeline project proposals” for funding consideration investors and donors. As part of the project, a draft ASEAN Regional Road Safety Strategy document has been prepared and consultation will further refine its directions and contents. The project will reach its conclusion in 2015 and a follow up phase three project is being considered.
Resumo:
- Study Design Controlled laboratory study - Objective To investigate the effect of a 12–mm in–shoe orthotic heel lift on Achilles tendon loading during shod walking using transmission–mode ultrasonography. - Background Orthotic heel lifts are thought to lower tension in the Achilles tendon but evidence for this effect is equivocal. - Methods The propagation speed of ultrasound, which is governed by the elastic modulus and density of tendon and is proportional to the tensile load to which it is exposed, was measured in the right Achilles tendon of twelve recreationally–active males during shod treadmill walking at matched speeds (3.4±0.7 km/h), with and without addition of a heel lift. Vertical ground reaction force and spatiotemporal gait parameters were simultaneously recorded. Data were acquired at 100Hz during 10s of steady–state walking. Statistical comparisons were made using paired t–tests (α=.05). - Results Ultrasound transmission speed in the Achilles tendon was characterized by two maxima (P1, P2) and minima (M1, M2) during walking. Addition of a heel lift to footwear resulted in a 2% increase and 2% decrease in the first vertical ground reaction force peak and the local minimum, respectively (P<.05). Peak ultrasonic velocity in the Achilles tendon (P1, P2, M2) was significantly lower with addition of an orthotic heel lift (P<.05). - Conclusions Peak ultrasound transmission speed in the Achilles tendon was lower with the addition of a 12–mm orthotic heel lift, indicating the heel lift reduced tensile load in the Achilles tendon, thereby counteracting the effect of footwear. These findings support the addition of orthotic heel lifts to footwear in the rehabilitation of Achilles tendon disorders where management aims to lower tension within the tendon. - Level of Evidence Therapy, level 2a
Resumo:
Measurement of tendon loading patterns during gait is important for understanding the pathogenesis of tendon "overuse" injury. Given that the speed of propagation of ultrasound in tendon is proportional to the applied load, this study used a noninvasive ultrasonic transmission technique to measure axial ultrasonic velocity in the right Achilles tendon of 27 healthy adults (11 females and 16 males; age, 26 ± 9 years; height, 1.73 ± 0.07 m; weight, 70.6 ± 21.2 kg), walking at self-selected speed (1.1 ± 0.1 m/s), and running at fixed slow speed (2 m/s) on a treadmill. Synchronous measures of ankle kinematics, spatiotemporal gait parameters, and vertical ground reaction forces were simultaneously measured. Slow running was associated with significantly higher cadence, shorter step length, but greater range of ankle movement, higher magnitude and rate of vertical ground reaction force, and higher ultrasonic velocity in the tendon than walking (P < 0.05). Ultrasonic velocity in the Achilles tendon was highly reproducible during walking and slow running (mean within-subject coefficient of variation < 2%). Ultrasonic maxima (P1, P2) and minima (M1, M2) were significantly higher and occurred earlier in the gait cycle (P1, M1, and M2) during running than walking (P < 0.05). Slow running was associated with higher and earlier peaks in loading of the Achilles tendon than walking.
Resumo:
Two algorithms that improve upon the sequent-peak procedure for reservoir capacity calculation are presented. The first incorporates storage-dependent losses (like evaporation losses) exactly as the standard linear programming formulation does. The second extends the first so as to enable designing with less than maximum reliability even when allowable shortfall in any failure year is also specified. Together, the algorithms provide a more accurate, flexible and yet fast method of calculating the storage capacity requirement in preliminary screening and optimization models.
Resumo:
Road crashes and injuries have become a growing issue worldwide. In 2011, more than 75,000 people died in road crashes in the ten member countries of the Association of South East Asian Nations (ASEAN) and many times this number sustained long term injuries. In 2014, the Asian Development Bank (ADB), funded by the Japan Fund for Poverty Reduction, commenced a package of actions to improve road safety in ASEAN. In 2015, as part of the technical assistance for this project, a Road Safety Advisor was appointed for Cambodia for four months. The assignment produced several primary outputs, which included the organization of national training on traffic law enforcement and road safety management, the conduct of a training needs survey and cost analysis study, and the development of a proposal for strengthening speed management. It is important to note that unlike other ADB technical assistance projects, this assignment adopted a capacity building approach, which promoted and encouraged the local road safety team in the government to step up and take action. The research capacity building approach adopted in this project highlighted the feasibility of increasing participation from existing stakeholders, especially the government in identifying existing human resources, building the capacity of relevant government officials and supporting them to take the ownership of the project. It is hoped that similar outcomes will occur in the other ASEAN countries.
Resumo:
Australia is the world’s third largest exporter of raw sugar after Brazil and Thailand, with around $2.0 billion in export earnings. Transport systems play a vital role in the raw sugar production process by transporting the sugarcane crop between farms and mills. In 2013, 87 per cent of sugarcane was transported to mills by cane railway. The total cost of sugarcane transport operations is very high. Over 35% of the total cost of sugarcane production in Australia is incurred in cane transport. A cane railway network mainly involves single track sections and multiple track sections used as passing loops or sidings. The cane railway system performs two main tasks: delivering empty bins from the mill to the sidings for filling by harvesters; and collecting the full bins of cane from the sidings and transporting them to the mill. A typical locomotive run involves an empty train (locomotive and empty bins) departing from the mill, traversing some track sections and delivering bins at specified sidings. The locomotive then, returns to the mill, traversing the same track sections in reverse order, collecting full bins along the way. In practice, a single track section can be occupied by only one train at a time, while more than one train can use a passing loop (parallel sections) at a time. The sugarcane transport system is a complex system that includes a large number of variables and elements. These elements work together to achieve the main system objectives of satisfying both mill and harvester requirements and improving the efficiency of the system in terms of low overall costs. These costs include delay, congestion, operating and maintenance costs. An effective cane rail scheduler will assist the traffic officers at the mill to keep a continuous supply of empty bins to harvesters and full bins to the mill with a minimum cost. This paper addresses the cane rail scheduling problem under rail siding capacity constraints where limited and unlimited siding capacities were investigated with different numbers of trains and different train speeds. The total operating time as a function of the number of trains, train shifts and a limited number of cane bins have been calculated for the different siding capacity constraints. A mathematical programming approach has been used to develop a new scheduler for the cane rail transport system under limited and unlimited constraints. The new scheduler aims to reduce the total costs associated with the cane rail transport system that are a function of the number of bins and total operating costs. The proposed metaheuristic techniques have been used to find near optimal solutions of the cane rail scheduling problem and provide different possible solutions to avoid being stuck in local optima. A numerical investigation and sensitivity analysis study is presented to demonstrate that high quality solutions for large scale cane rail scheduling problems are obtainable in a reasonable time. Keywords: Cane railway, mathematical programming, capacity, metaheuristics
Resumo:
Abstract is not available.
Resumo:
The creative work comprises six short digital screen stories and emerges from a collaboration between the Discipline of Film Screen and Animation at Queensland University of Technology and the Centre for Social and Creative Media at University of Goroka, funded via the Department of Foreign Affairs and Trade's Australia Awards Fellowship. Six fellows traveled from Papua New Guinea to Brisbane for a two-week intensive course to learn the advanced skills necessary in order to create media that will empower women and girls to make more of their own economies in Papua New Guinea, and increase the representation of women and their well-being through leadership and decision-making. The resulting creative work is evidence of innovative media teaching-making methods designed to build human and cultural assets in PNG and address the increasing demand for media materials driven by the influx of mobile phones and internet services. The creative work provides a platform to directly address and positively impact gender issues in PNG and builds on the success of the Pawa Meri project, which trained six female directors to tell stories of women in leadership roles in PNG. One of the directors was a producer of this creative work. The creative work frames but problematises the complex issues influencing gender equity through the selection of content and narrative structures in ways which address the dynamics of male/female relationships and power in PNG society and will include strategies to illustrate transformed male and female behaviours. The creative work adopts a scaffolded approach, incorporating the findings of the Train the Trainer approach developed by UoG and QUT for the Life Drama research project. The creative work takes into account current developmental themes and approaches in the production of rich media products, and skills the key participants so that they are able to in turn train others in the wider community. The creative work was presented to partners and key stakeholders on 3 July 2015 at the Glasshouse, QUT Creative Industries Precinct and at the Dean’s Research Seminar Poster Exhibition 15 July 2015 at Room 212-213, Level 2, J Block, Gardens Point QUT and subsequent eBook. It has since returned to PNG to be showcased and distributed, and the skills and strategies disseminated.
Resumo:
Bearing capacity factor N-c for axially loaded piles in clays whose cohesion increases linearly with depth has been estimated numerically under undrained (phi=0) condition. The Study follows the lower bound limit analysis in conjunction With finite elements and linear programming. A new formulation is proposed for solving an axisymmetric geotechnical stability problem. The variation of N-c with embedment ratio is obtained for several rates of the increase of soil cohesion with depth; a special case is also examined when the pile base was placed on the stiff clay stratum overlaid by a soft clay layer. It was noticed that the magnitude of N-c reaches almost a constant value for embedment ratio greater than unity. The roughness of the pile base and shaft affects marginally the magnitudes of N-c. The results obtained from the present study are found to compare quite well with the different numerical solutions reported in the literature.
Resumo:
The results from laboratory model tests and numerical simulations on square footings resting on sand are presented. Bearing capacity of footings on geosynthetic reinforced sand is evaluated and the effect of various reinforcement parameters like the type and tensile strength of geosynthetic material, amount of reinforcement, layout and configuration of geosynthetic layers below the footing on the bearing capacity improvement of the footings is studied through systemati model studies. A steel tank of size 900 x 900 x 600 mm is used for conducting model tests. Four types of grids, namely strong biaxial geogrid, weak biaxial geogrid, uniaxial geogrid and a geonet, each with different tensile strength, are used in the tests. Geosynthetic reinforcement is provided in the form of planar layers, varying the depth of reinforced zone below the footing, number of geosynthetic layers within the reinforced zone and the width of geosynthetic layers in different tests. Influence of all these parameters on the bearing capacity improvement of square footing and its settlement is studied by comparing with the test on unreinforced sand. Results show that the effective depth of reinforcement is twice the width of the footing and optimum spacing of geosynthetic layers is half the width of the footing. It is observed that the layout and configuration of reinforcement play a vital role in bearing capacity improvement rather than the tensile strength of the geosynthetic material. Experimental observations are supported by the findings from numerical analyses.
Resumo:
The vertical uplift resistance of two interfering rigid rough strip anchors embedded horizontally in sand at shallow depths has been examined. The analysis is performed by using an upper bound theorem o limit analysis in combination with finite elements and linear programming. It is specified that both the anchors are loaded to failure simultaneously at the same magnitude of the failure load. For different clear spacing (S) between the anchors, the magnitude of the efficiency factor (xi(gamma)) is determined. On account of interference, the magnitude of xi(gamma) is found to reduce continuously with a decrease in the spacing between the anchors. The results from the numerical analysis were found to compare reasonably well with the available theoretical data from the literature.
Resumo:
Changing the topology of a railway network can greatly affect its capacity. Railway networks however can be altered in a multitude of different ways. As each way has significant immediate and long term financial ramifications, it is a difficult task to decide how and where to expand the network. In response some railway capacity expansion models (RCEM) have been developed to help capacity planning activities, and to remove physical bottlenecks in the current railway system. The exact purpose of these models is to decide given a fixed budget, where track duplications and track sub divisions should be made, in order to increase theoretical capacity most. These models are high level and strategic, and this is why increases to the theoretical capacity is concentrated upon. The optimization models have been applied to a case study to demonstrate their application and their worth. The case study evidently shows how automated approaches of this nature could be a formidable alternative to current manual planning techniques and simulation. If the exact effect of track duplications and sub-divisions can be sufficiently approximated, this approach will be very applicable.
Resumo:
Grazing is a major land use in Australia's rangelands. The 'safe' livestock carrying capacity (LCC) required to maintain resource condition is strongly dependent on climate. We reviewed: the approaches for quantifying LCC; current trends in climate and their effect on components of the grazing system; implications of the 'best estimates' of climate change projections for LCC; the agreement and disagreement between the current trends and projections; and the adequacy of current models of forage production in simulating the impact of climate change. We report the results of a sensitivity study of climate change impacts on forage production across the rangelands, and we discuss the more general issues facing grazing enterprises associated with climate change, such as 'known uncertainties' and adaptation responses (e.g. use of climate risk assessment). We found that the method of quantifying LCC from a combination of estimates (simulations) of long-term (>30 years) forage production and successful grazier experience has been well tested across northern Australian rangelands with different climatic regions. This methodology provides a sound base for the assessment of climate change impacts, even though there are many identified gaps in knowledge. The evaluation of current trends indicated substantial differences in the trends of annual rainfall (and simulated forage production) across Australian rangelands with general increases in most of western Australian rangelands ( including northern regions of the Northern Territory) and decreases in eastern Australian rangelands and south-western Western Australia. Some of the projected changes in rainfall and temperature appear small compared with year-to-year variability. Nevertheless, the impacts on rangeland production systems are expected to be important in terms of required managerial and enterprise adaptations. Some important aspects of climate systems science remain unresolved, and we suggest that a risk-averse approach to rangeland management, based on the 'best estimate' projections, in combination with appropriate responses to short-term (1-5 years) climate variability, would reduce the risk of resource degradation. Climate change projections - including changes in rainfall, temperature, carbon dioxide and other climatic variables - if realised, are likely to affect forage and animal production, and ecosystem functioning. The major known uncertainties in quantifying climate change impacts are: (i) carbon dioxide effects on forage production, quality, nutrient cycling and competition between life forms (e.g. grass, shrubs and trees); and (ii) the future role of woody plants including effects of. re, climatic extremes and management for carbon storage. In a simple example of simulating climate change impacts on forage production, we found that increased temperature (3 degrees C) was likely to result in a decrease in forage production for most rangeland locations (e. g. -21% calculated as an unweighted average across 90 locations). The increase in temperature exacerbated or reduced the effects of a 10% decrease/increase in rainfall respectively (-33% or -9%). Estimates of the beneficial effects of increased CO2 (from 350 to 650 ppm) on forage production and water use efficiency indicated enhanced forage production (+26%). The increase was approximately equivalent to the decline in forage production associated with a 3 degrees C temperature increase. The large magnitude of these opposing effects emphasised the importance of the uncertainties in quantifying the impacts of these components of climate change. We anticipate decreases in LCC given that the 'best estimate' of climate change across the rangelands is for a decline (or little change) in rainfall and an increase in temperature. As a consequence, we suggest that public policy have regard for: the implications for livestock enterprises, regional communities, potential resource damage, animal welfare and human distress. However, the capability to quantify these warnings is yet to be developed and this important task remains as a challenge for rangeland and climate systems science.