947 resultados para Project planning


Relevância:

30.00% 30.00%

Publicador:

Resumo:

This thesis deals with the integration of the manpower criterion with the strategic decision making processes of technological projects in developing countries. This integration is to be achieved by ensuring the involvement of the actors, who have relevant roles and responsibilities along the whole life cycle of the project, in the strategic decision making phases of the project. The relevance of the actors is ascertained by the use of a responsibility index which relates their responsibility to the project's constituent stages. In the context of a technological project in a typical centrally-planned developing environment, the actors are identified as Arbiters, Planners, Implementors and Operators and their roles, concerns and objectives are derived. In this context, the actors are usually government and non-government organisations. Hence, decision making will involve multiple agencies as well as multiple criteria. A methodology covering the whole decision-making process, from options generation to options selection, and adopting Saaty's Analytical Hierarchy Process as an operational tool is proposed to deal with such multiple-criteria, multipleagency decision situations. The methodology is intended to integrate the consideration of the relevant criteria, the prevailing environmental and policy factors, and the concerns and objectives of the relevant actors into a unifying decision-making process which strives to facilitate enlightened decision making and to enhance learning and interaction. An extensive assessment of the methodology's feasibility, based on a specific technological project within the Iraqi oil industry is included, and indicates that the methodology should be both useful and implementable.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Modern injection-moulding machinery which produces several, pairs of plastic footwear at a time brought increased production planning problems to a factory. The demand for its footwear is seasonal but the company's manning policy keeps a fairly constant production level thus determining the aggregate stock. Production planning must therefore be done within the limitations of a specified total stock. The thesis proposes a new production planning system with four subsystems. These are sales forecasting, resource planning, and two levels of production scheduling: (a) aggregate decisions concerning the 'manufacturing group' (group of products) to be produced in each machine each week, and (b) detailed decisions concerning the products within a manufacturing group to be scheduled into each mould-place. The detailed scheduling is least dependent on improvements elsewhere so the sub-systems were tackled in reverse order. The thesis concentrates on the production scheduling sub-systems which will provide most. of the benefits. The aggregate scheduling solution depends principally on the aggregate stocks of each manufacturing group and their division into 'safety stocks' (to prevent shortages) and 'freestocks' (to permit batch production). The problem is too complex for exact solution but a good heuristic solution, which has yet to be implemented, is provided by minimising graphically immediate plus expected future costs. The detailed problem splits into determining the optimal safety stocks and batch quantities given the appropriate aggregate stocks. It.is found that the optimal safety stocks are proportional to the demand. The ideal batch quantities are based on a modified, formula for the Economic Batch Quantity and the product schedule is created week by week using a priority system which schedules to minimise expected future costs. This algorithm performs almost optimally. The detailed scheduling solution was implemented and achieved the target savings for the whole project in favourable circumstances. Future plans include full implementation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This research project has developed a novel decision support system using Geographical Information Systems and Multi Criteria Decision Analysis and used it to develop and evaluate energy-from-waste policy options. The system was validated by applying it to the UK administrative areas of Cornwall and Warwickshire. Different strategies have been defined by the size and number of the facilities, as well as the technology chosen. Using sensitivity on the results from the decision support system, it was found that key decision criteria included those affected by cost, energy efficiency, transport impacts and air/dioxin emissions. The conclusions of this work are that distributed small-scale energy-from-waste facilities score most highly overall and that scale is more important than technology design in determining overall policy impact. This project makes its primary contribution to energy-from-waste planning by its development of a Decision Support System that can be used to assist waste disposal authorities to identify preferred energy-from-waste options that have been tailored specifically to the socio-geographic characteristics of their jurisdictional areas. The project also highlights the potential of energy-from-waste policies that are seldom given enough attention to in the UK, namely those of a smaller-scale and distributed nature that often have technology designed specifically to cater for this market.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Formulating manufacturing business strategy is often fragmented in as much as current tools address upstream and downstream vertical integration with product integration, or more recently, product and infrastructure integration. Rarely do tools address all of these dimensions in an holistic manner. The research described in this paper is that undertaken in the MAPSTRAT project: a scoping study with industrial partners, aiming to satisfy this business need. A comprehensive literature study is described which is contextualized using six case studies. The paper stresses the importance of ‘joined-up thinking’ and outlines plans for an appropriate tool that is under development.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This study proposes an integrated analytical framework for effective management of project risks using combined multiple criteria decision-making technique and decision tree analysis. First, a conceptual risk management model was developed through thorough literature review. The model was then applied through action research on a petroleum oil refinery construction project in the Central part of India in order to demonstrate its effectiveness. Oil refinery construction projects are risky because of technical complexity, resource unavailability, involvement of many stakeholders and strict environmental requirements. Although project risk management has been researched extensively, practical and easily adoptable framework is missing. In the proposed framework, risks are identified using cause and effect diagram, analysed using the analytic hierarchy process and responses are developed using the risk map. Additionally, decision tree analysis allows modelling various options for risk response development and optimises selection of risk mitigating strategy. The proposed risk management framework could be easily adopted and applied in any project and integrated with other project management knowledge areas.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This chapter reports on a framework that has been successfully used to analyze the e-business capabilities of an organization with a view to developing their e-capability maturity levels. This should be the first stage of any systems development project. The framework has been used widely within start-up companies and well-established companies both large and small; it has been deployed in the service and manufacturing sectors. It has been applied by practitioners and consultants to help improve e-business capability levels, and by academics for teaching and research purposes at graduate and undergraduate levels. This chapter will provide an account of the unique e-business planning and analysis framework (E-PAF) and demonstrate how it works via an abridged version of a case study (selected from hundreds that have been produced). This will include a brief account of the three techniques that are integrated to form the analysis framework: quality function deployment (QFD) (Akao, 1972), the balanced scorecard (BSC) (Kaplan & Norton, 1992), and value chain analysis (VCA) (Porter, 1985). The case study extract is based on an online community and dating agency service identified as VirtualCom which has been produced through a consulting assignment with the founding directors of that company and has not been published previously. It has been chosen because it gives a concise, comprehensive example from an industry that is relatively easy to relate to.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Implementation of Enterprise Resource Planning (ERP) systems require huge investments while ineffective implementations of such projects are commonly observed. A considerable number of these projects have been reported to fail or take longer than it was initially planned, while previous studies show that the aim of rapid implementation of such projects has not been successful and the failure of the fundamental goals in these projects have imposed huge amounts of costs on investors. Some of the major consequences are the reduction in demand for such products and the introduction of further skepticism to the managers and investors of ERP systems. In this regard, it is important to understand the factors determining success or failure of ERP implementation. The aim of this paper is to study the critical success factors (CSFs) in implementing ERP systems and to develop a conceptual model which can serve as a basis for ERP project managers. These critical success factors that are called “core critical success factors” are extracted from 62 published papers using the content analysis and the entropy method. The proposed conceptual model has been verified in the context of five multinational companies.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Biomass is projected to account for approximately half of the new energy production required to achieve the 2020 primary energy target in the UK. Combined heat and power (CHP) bioenergy systems are not only a highly efficient method of energy conversion, at smaller-scales a significant proportion of the heat produced can be effectively utilised for hot water, space heating or industrial heating purposes. However, there are many barriers to project development and this has greatly inhibited deployment in the UK. Project viability is highly subjective to changes in policy, regulation, the finance market and the low cost incumbent; a high carbon centralised energy system. Unidentified or unmitigated barriers occurring during the project lifecycle may not only negatively impact on the project but could ultimately lead to project failure. The research develops a decision support system (DSS) for small-scale (500 kWe to 10 MWe) biomass combustion CHP project development and risk management in the early stages of a potential project’s lifecycle. By supporting developers in the early stages of project development with financial, scheduling and risk management analysis, the research aims to reduce the barriers identified and streamline decision-making. A fuzzy methodology is also applied throughout the developed DSS to support developers in handling the uncertain or approximate information often held at the early stages of the project lifecycle. The DSS is applied to a case study of a recently failed (2011) small-scale biomass CHP project to demonstrate its applicability and benefits. The application highlights that the proposed development within the case study was not viable. Moreover, further analysis of the possible barriers with the DSS confirmed that some possible modifications to be project could have improved this, such as a possible change of feedstock to a waste or residue, addressing the unnecessary land lease cost or by increasing heat utilisation onsite. This analysis is further supported by a practitioner evaluation survey that confirms the research contribution and objectives are achieved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Enterprise Resource Planning (ERP) projects are strategic and capital intensive, so failure may be costly and even cause bankruptcy of companies. Previous studies have proposed ways for improving implementation, but they are mostly generic and follow standardized project management practices as specified in various standards (e.g. the “project management body of knowledge” of the Project Management Institute). Because ERP is interdisciplinary (involving change management, project management and information technology management), it warrants a customized approach to managing risks throughout the life cycle of implementation and operation. Through a practical case study, this paper demonstrates a qualitative, user friendly approach to ERP project risk management. Firstly, through a literature review it identifies various risk factors in ERP implementation. Secondly, the risk management practices of a UK-based multinational consulting company in one of its clients are evaluated. The risk factors from the case study organization and literature are then compared and discussed.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A cross-country pipeline construction project is exposed to an uncertain environment due to its enormous size (physical, manpower requirement and financial value), complexity in design technology and involvement of external factors. These uncertainties can lead to several changes in project scope during the process of project execution. Unless the changes are properly controlled, the time, cost and quality goals of the project may never be achieved. A methodology is proposed for project control through risk analysis, contingency allocation and hierarchical planning models. Risk analysis is carried out through the analytic hierarchy process (AHP) due to the subjective nature of risks in construction projects. The results of risk analysis are used to determine the logical contingency for project control with the application of probability theory. Ultimate project control is carried out by hierarchical planning model which enables decision makers to take vital decisions during the changing environment of the construction period. Goal programming (GP), a multiple criteria decision-making technique, is proposed for model formulation because of its flexibility and priority-base structure. The project is planned hierarchically in three levels—project, work package and activity. GP is applied separately at each level. Decision variables of each model are different planning parameters of the project. In this study, models are formulated from the owner's perspective and its effectiveness in project control is demonstrated.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The aim of this study is to address the main deficiencies with the prevailing project cost and time control practices for construction projects in the UK. A questionnaire survey was carried out with 250 top companies followed by in-depth interviews with 15 experienced practitioners from these companies in order to gain further insights of the identified problems, and their experience of good practice on how these problems can be tackled. On the basis of these interviews and syntheses with literature, a list of 65 good practice recommendations have been developed for the key project control tasks: planning, monitoring, reporting and analysing. The Delphi method was then used, with the participation of a panel of 8 practitioner experts, to evaluate these improvement recommendations and to establish their degree of relevance. After two rounds of Delphi, these recommendations are put forward as "critical", "important", or "helpful" measures for improving project control practice.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents the concepts of the intelligent system for aiding of the module assembly technology. The first part of this paper presents a project of intelligent support system for computer aided assembly process planning. The second part includes a coincidence description of the chosen aspects of implementation of this intelligent system using technologies of artificial intelligence (artificial neural networks, fuzzy logic, expert systems and genetic algorithms).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The objective of this research and thesis was to develop a program and project in the context of the Historic Art Deco District in Miami Beach. This project intended to analyze the chronological history of the urban development of the Art Deco District, its geographical, political and socio-cultural conditions as well as the evolution and different architectonic typologies of the area. In order to understand the issues involved in design in a historic context, this research addressed and analyzed several architectonic interventions within various historic places. This research concluded with the design of a public facility located at Ocean Drive, Miami Beach, consisting of a Museum of Urban Development and Headquarters for the Planning/Preservation Department of the City of Miami Beach. The project proposal and thesis, addresses architectonic and theoretical issues specific to design in an historic area.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This Good Practice Guide is the outcome of a project co-funded by the European Commission (DG Mare) called Transboundary Planning in the European Atlantic (TPEA), which ran from December 2012 to May 2014. The aim of the project was to demonstrate approaches to transboundary maritime spatial planning (MSP) in the European Atlantic region. This is one of a series of projects exploring the opportunities and challenges of carrying out cross-border MSP in Europe’s regional seas, making connections with integrated coastal management (ICM). TPEA focused on two pilot areas: one involving Portugal and Spain and the other Ireland and the United Kingdom. Despite distinct identities in the region relating to different traditions of planning and stages of MSP implementation, TPEA worked towards a commonly-agreed approach to transboundary MSP and developed principles of cross-border working which it is hoped will be of wider benefit. This guide presents these principles, illustrated with examples from the TPEA project.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Radiotherapy is commonly used to treat lung cancer. However, radiation induced damage to lung tissue is a major limiting factor to its use. To minimize normal tissue lung toxicity from conformal radiotherapy treatment planning, we investigated the use of Perfluoropropane(PFP)-enhanced MR imaging to assess and guide the sparing of functioning lung. Fluorine Enhanced MRI using Perfluoropropane(PFP) is a dynamic multi-breath steady state technique enabling quantitative and qualitative assessments of lung function(1).

Imaging data was obtained from studies previously acquired in the Duke Image Analysis Laboratory. All studies were approved by the Duke IRB. The data was de-identified for this project, which was also approved by the Duke IRB. Subjects performed several breath-holds at total lung capacity(TLC) interspersed with multiple tidal breaths(TB) of Perfluoropropane(PFP)/oxygen mixture. Additive wash-in intensity images were created through the summation of the wash-in phase breath-holds. Additionally, model based fitting was utilized to create parametric images of lung function(1).

Varian Eclipse treatment planning software was used for putative treatment planning. For each subject two plans were made, a standard plan, with no regional functional lung information considered other than current standard models. Another was created using functional information to spare functional lung while maintaining dose to the target lesion. Plans were optimized to a prescription dose of 60 Gy to the target over the course of 30 fractions.

A decrease in dose to functioning lung was observed when utilizing this functional information compared to the standard plan for all five subjects. PFP-enhanced MR imaging is a feasible method to assess ventilatory lung function and we have shown how this can be incorporated into treatment planning to potentially decrease the dose to normal tissue.