891 resultados para Project management Computer programs
Resumo:
For executing the activities of a project, one or several resources are required, which are in general scarce. Many resource-allocation methods assume that the usage of these resources by an activity is constant during execution; in practice, however, the project manager may vary resource usage by individual activities over time within prescribed bounds. This variation gives rise to the project scheduling problem which consists in allocating the scarce resources to the project activities over time such that the project duration is minimized, the total number of resource units allocated equals the prescribed work content of each activity, and precedence and various work-content-related constraints are met.
Resumo:
Experiences relating to the InternationalMasters in Rural Development from the Technical University of Madrid (Universidad Politécnica de Madrid, UPM), the first Spanish programme to receive a mention as a Registered Education Programme by InternationalProject Management Association (IPMA) are considered. Backed by an educational strategy based on Project-Based Learning dating back twenty years, this programme has managed to adapt to the competence evaluation requirements proposed by the European Space for Higher Education (ESHE). In order to do this the training is linked to the professional qualification using competences as a reference leading to the qualification in project management as established by the IPMA.
Resumo:
In this work, a comparison between the competences codes in the CDIÓs* curriculum, the ones defined for the Tunning Project and the International Project Management Association (IPMA) is made. The goal is to define the most appropriate competences codes for the engineering education in Latin America. The CDIO code is obtained from the engineering practice, and responds to the Accreditation Board for Engineering and Technology (ABET) standards of accreditation. The Tuning competences are the ones defined for Latin America and the IPMÁs are international competences for project management. It is the first time that the competences defined in ABET accreditation standards in the engineering field are compared with the international competences according to IPMÁs model. The results give evidence that, in first place, there is a need to apply holistic models in the definition of an engineering curriculum. Second, the pertinence of these models in the definition of engineering programs in Latin America.
Resumo:
La crisis afecta a todos los sectores, es un terremoto en cadena que se inicio en el sector inmobiliario y se ha ido introduciendo en el resto. Todo esto ha dado lugar a una caída brusca de la demanda de los servicios relacionados con la construcción, con un posicionamiento en “espera” de los Promotores e Inversores, que aún tienen liquidez para invertir, buscando oportunidades que lógicamente se tienen que producir en un entorno escasamente fiable como el actual. Aquellos Inversores que vean oportunidades, se aseguraran de que los productos que van a realizar, tengan una demanda suficiente, sus costes estén en consonancia con el mercado, pero sin que aquello perjudique al resultado final, es decir manteniendo la calidad propuesta al inicio del proceso con los costes previstos, dando lugar a un control exhaustivo del producto a realizar, lo cual obligará a una gran profesionalidad por parte de los agentes implicados. Para todo esto habrá que contar con Empresas especializadas, que aporten garantías en este proceso y aseguren tanto al promotor como al Inversor en todo momento donde y en que se invierten sus recursos. La Dirección Integrada de Proyecto (“Project Management “) aplicada al proceso constructivo es una Técnica Metodológica que ayuda a organizar, controlar y gestionar los recursos de los promotores dentro del proceso edificatorio. Cuando los recursos están limitados (que normalmente es la mayoría de las situaciones) gestionarlos de una manera eficiente se convierte en algo muy importante. Bien, pues nos encontramos con que en esta situación actual, los recursos no solo están limitados, si no que son limitados, por lo que un control y un exhaustivo seguimiento de los mismos se convierte no solo en importante si no en fundamental.
Resumo:
In the year 1999 approves the Law of Construction Building (LOE, in Spanish) to regulate a sector such as construction, which contained some shortcomings from the legal point of view. Currently, the LOE has been in force 12 years, changing the spanish world of the construction, due to influenced by internationalization. Within the LOE, there regulating the different actors involved in the construction building, as the Projects design, the Director of Construction, the developer, The builder, Director of execution of the construction (actor only in Spain, similar as construcion engineer and abroad in), control entities and the users, but lacks figure Project manager will assume the delegation of the promoter helping and you organize, direct and management the process. This figure assumes that the market and contracts are not legally regulated in Spain, then should define and establish its regulation in the LOE. (Spain Construction Law) The translation in spanish of the words "Project Manager is owed to Professor Rafael de Heredia in his book Integrated Project Management, as agent acting on behalf of the organization and promoter assuming control of the project, ie Integraded Project Management . Already exist in Spain, AEDIP (Spanish Association Integrated of Project Construction management) which comprises the major companies in “Project Management” in Spain, and MeDIP (Master in Integrated Construction Project) the largest and most advanced studies at the Polytechnic University of Madrid, in "Construction Project Management" they teach which is also in Argentina. The Integrated Project ("Project Management") applied to the construction process is a methodological technique that helps to organize, control and manage the resources of the promoters in the building process. When resources are limited (which is usually most situations) to manage them efficiently becomes very important. Well, we find that in this situation, the resources are not only limited, but it is limited, so a comprehensive control and monitoring of them becomes not only important if not crucial. The alternative of starting from scratch with a team that specializes in developing these follow directly intervening to ensure that scarce resources are used in the best possible way requires the use of a specific methodology (Manual DIP, Matrix Foreign EDR breakdown structure EDP Project, Risk Management and Control, Design Management, et ..), that is the methodology used by "Projects managers" to ensure that the initial objectives of the promoters or investors are met and all actors in process, from design to construction company have the mind aim of the project will do, trying to get their interests do not prevail over the interests of the project. Among the agents listed in the building process, "Project Management" or DIPE (Director Comprehensive building process, a proposed name for possible incorporation into the LOE, ) currently not listed as such in the LOE (Act on Construction Planning ), one of the agents that exist within the building process is not regulated from the legal point of view, no obligations, ie, as is required by law to have a project, a builder, a construction management, etc. DIPE only one who wants to hire you as have been advanced knowledge of their services by the clients they have been hiring these agents, there being no legal obligation as mentioned above, then the market is dictating its ruling on this new figure, as if it were necessary, he was not hired and eventually disappeared from the building process. As the aim of this article is regular the process and implement the name of DIPE in the Spanish Law of buildings construction (LOE)
Resumo:
En el presente proyecto se realiza el diseño y cálculo de la instalación eléctrica y el cálculo de luminarias, de un edificio de oficinas y almacén de productos farmacéuticos. Este diseño se precisa para el correcto desarrollo de la actividad de la nave industrial objeto de la instalación. Mediante la utilización de programas informáticos se pretende diseñar una guía para agilizar los procesos de dimensionamiento y cálculo para este tipo de proyectos. Al contar estos programas con una normativa totalmente actualizada, también agilizan el proceso de adecuación a la norma. En el cálculo de luminarias se consigue un cálculo muy aproximado de la potencia requerida, además de asegurar las condiciones lumínicas necesarias. También se tiene un cálculo muy exacto del circuito eléctrico que es fácil modificar a futuras ampliaciones. ABSTRACT The project´s aim is to make the design and calculations of the electrical and lighting installations, for a pharmaceutical warehouse. This design is necessary to ensure proper operational activity of the industrial warehouse, subject to the installation. By means of computer programs, it is intended to design a guide in order to speed up the processes of calculations and sizing of the electric wiring for this type of project. These programs are also fully updated, and therefore, the processes of adaptation to the legislation and regulations are made easier. In the calculation of the lighting, the software achieves a close approximation of the required power as well as ensuring the necessary light conditions. With this software we also achieve a very accurate calculation of the electrical circuit that is easy to modify to future expansions.
Resumo:
BACKGROUND: Knowledge of pesticide selectivity to natural enemies is necessary for a successful implementation of biological and chemical control methods in integrated pest management (IPM) programs. Diacylhydrazine (DAH)-based ecdysone agonists also known as molting-accelerating compounds (MACs) are considered a selective group of insecticides, and their compatibility with predatory Heteroptera, which are used as biological control agents, is known. However, their molecular mode of action has not been explored in beneficial insects such as Orius laevigatus (Fieber) (Hemiptera: Anthocoridae). RESULTS: In this project in vivo toxicity assays demonstrated that the DAH-based RH-5849, tebufenozide and methoxyfenozide have no toxic effect against O. laevigatus. The ligand-binding domain (LBD) of the ecdysone receptor (EcR) of O. laevigatus was sequenced and a homology protein model was constructed which confirmed a cavity structure with 12 ?-helixes, harboring the natural insect molting hormone 20-hydroxyecdysone. However, docking studies showed that a steric clash occurred for the DAH-based insecticides due to a restricted extent of the ligand-binding cavity of the EcR of O. laevigatus. CONCLUSIONS: The insect toxicity assays demonstrated that MACs are selective for O. laevigatus. The modeling/docking experiments are indications that these pesticides do not bind with the LBD-EcR of O. laevigatus and support that they show no biological effects in the predatory bug. These data help in explaining the compatible use of MACs together with predatory bugs in IPM programs. Keywords: Orius laevigatus, selectivity, diacylhydrazine insecticides, ecdysone receptor, homology modelling, docking studies.
Resumo:
El objetivo de este proyecto de investigación es comparar dos técnicas matemáticas de aproximación polinómica, las aproximaciones según el criterio de mínimos cuadrados y las aproximaciones uniformes (“minimax”). Se describen tanto el mercado actual del cobre, con sus fluctuaciones a lo largo del tiempo, como los distintos modelos matemáticos y programas informáticos disponibles. Como herramienta informática se ha seleccionado Matlab®, cuya biblioteca matemática es muy amplia y de uso muy extendido y cuyo lenguaje de programación es suficientemente potente para desarrollar los programas que se necesiten. Se han obtenido diferentes polinomios de aproximación sobre una muestra (serie histórica) que recoge la variación del precio del cobre en los últimos años. Se ha analizado la serie histórica completa y dos tramos significativos de ella. Los resultados obtenidos incluyen valores de interés para otros proyectos. Abstract The aim of this research project is to compare two mathematical models for estimating polynomial approximation, the approximations according to the criterion of least squares approximations uniform (“Minimax”). Describes both the copper current market, fluctuating over time as different computer programs and mathematical models available. As a modeling tool is selected main Matlab® which math library is the largest and most widely used programming language and which is powerful enough to allow you to develop programs that are needed. We have obtained different approximating polynomials, applying mathematical methods chosen, a sample (historical series) which indicates the fluctuation in copper prices in last years. We analyzed the complete historical series and two significant sections of it. The results include values that we consider relevant to other projects
Resumo:
La actividad de muchas empresas, y en concreto las de software, está basada en proyectos. Típicamente, estas empresas tendrán un modelo de negocio orientado a productos para un mercado abierto, o un modelo de negocio orientado a consultoría para otras empresas. La empresa LeadClic Solutions se incluye en el segundo grupo. Se trata de una consultoría especializada en una tecnología emergente, Salesforce, cuya labor consiste en el desarrollo de aplicaciones cloud en esta plataforma que satisfagan las necesidades de sus clientes, desde empresas relativamente pequeñas hasta grandes empresas internacionales. Ante esta variedad de realidades, LeadClic necesita una herramienta versátil que permita una gestión eficaz de proyectos de distinta índole, integrando al mismo tiempo gestión de clientes, planificación, control de tiempo y costes, seguimiento, y gestión de recursos humanos. En la actualidad, la empresa basa esta gestión en un gran elenco de programas especializados, desatacando hojas de cálculo, herramientas de gestión de proyectos en diversos programas locales o en la nube, correo electrónico, servicios de comunicación y desarrollos personalizados en Salesforce. El objetivo de este Trabajo Fin de Grado es el diseño, implementación y validación de una herramienta en la nube, sobre la plataforma Salesforce, que integre las soluciones a todas las necesidades de la empresa. ---ABSTRACT---Many companies’ activity, in particular software companies’, is based on projects. Typically, these companies have a product for open market - oriented business model, or a B2B consultancy business model. The company LeadClic Solutions is included in the second group. It is a small consultancy, specialized in an emergent technology, Salesforce, that develops cloud applications in that platform to satisfy its clients’ needs, from small companies to big international ones. Faced with this variety of situations, LeadClic needs a versatile tool able to cope with an effective management of projects of different types, integrating at once client management, planning, time and costs control, monitoring, and human resources management. At the moment, the company bases this management on a wide range of specialized programs, such as spreadsheets, local and cloud based project management tools, emailing, communication services and Salesforce based custom developments. This Final Degree Project seeks to design, implement and validate a cloud based tool, on the Salesforce platform, to integrate the solution to all of the company’s needs into one single application.
Resumo:
Muchas de las grandes iniciativas empresariales, se ven truncadas por falta de un adecuado análisis económico-financiero. Incluso, muchas grandes ideas no son implantadas correctamente en el primer intento por este motivo, y son otras personas las que consiguen posteriormente el éxito de esas brillantes ideas gracias a una correcta aproximación financiera. Las empresas necesitan definir sus objetivos, establecer las para lograrlos, identificar las personas responsables de su ejecución (sus roles y funciones) y elaborar un plan económico-financiero que recoja el estudio de inversiones necesarias, el análisis de costes, la previsión de ingresos, así como la estrategia financiera más adecuada para la captación de los fondos necesarios para llevar a cabo las acciones programadas. Una vez iniciado el proyecto empresarial, será imprescindible realizar un seguimiento y control de la evolución (integración), tomando las medidas que se estimen oportunas para mantener el rumbo adecuado durante todo el tiempo de actividad. En este trabajo, aplicaremos las metodologías y buenas prácticas de la gestión de proyectos, como marco estructurado que nos permita abordar las principales cuestiones económico-financieras a tener en cuenta a la hora de enfrentarnos a un proyecto empresarial, para contribuir, en la medida de lo posible, a que los emprendedores tengan en cuenta estas cuestiones, facilitando así el desarrollo de negocios, en un difícil entorno económico de crisis como el que actualmente estamos viviendo en España, y animando de esta manera a optar por la iniciativa emprendedora, tratando de minimizar el riesgo en base al contenido. ---ABSTRACT---Lack of adequate economic and financial analysis truncates many of the entrepreneurship and innovation programs. Because of that reason, many great ideas are not even correctly implemented on the first attempt, and the person who finds the proper financial approach, succeed. All the enterprises have to establish clear objectives, actions to accomplish those objectives, assign roles, responsibilities and executive functions to specific people. Elaborate funding plan that contains surveys on necessary investments, cost analysis, estimate the income, liquid assets and also financial strategy suitable for fundraising to finance programmed actions. Once the project has been executed it is essential to monitor and control the development and integration adopting measures accordingly to the needs. This thesis applies methodology and best practice of project management as structured framework for the principal economic and financial issues facing business project. It is necessary contribution to entrepreneurs understanding of business, therefore facilitates business development in such rough environment as Spain is at this moment, and at the same time encourages adopting entrepreneur’s solution as less risky one. This document aims to explore all the economic and financial issues from methodological point of view based on my own professional experience, resulting in helping to understand the importance that economy and finances have in developing adequate corporate strategy. Crisis has highlighted inadequate functionality of many companies. Most popular first symptom is lack of cash flow that deteriorates the company, and results in suspension of payments followed by closing. In other cases, difficulties appear due to poor financial management of committed resources; to be observed in lack of prevision and planning or incorrect basic functionality and operational matters on daily basis. What would be your advice to someone who have magnificent business idea however no knowledge on how to handle finances in order to succeed in initiating and executing the project? Despite of the fact that the central nucleus of this paper is at economics and finances area, all the other concepts and topics given during master will be revived; for example business strategy, consultants abilities, organization and standard processes, among others, are impregnated with knowledge of project management.
Resumo:
This paper is a preliminary version of Chapter 3 of a State-of-the-Art Report by the IASS Working Group 5: Concrete Shell Roofs. The intention of this chapter is to set forth for those who intend to design concrete shell roofs information and advice about the selection, verification and utilization of commercial computer tools for analysis and design tasks.The computer analysis and design steps for a concrete shell roof are described. Advice follows on the aspects to be considered in the application of commercial finite element (FE)computer programs to concrete shell analysis, starting with recommendations on how novices can gain confidence and competence in the use of software. To establish vocabulary and provide background references, brief surveys are presented of, first,element types and formulations for shells and, second, challenges presented by advanced analyses of shells. The final section of the chapter indicates what capabilities to seek in selecting commercial FE software for the analysis and design of concrete shell roofs. Brief concluding remarks summarize advice regarding judicious use of computer analysis in design practice.
Evaluation of the competitiveness of agri-food sector in the región of the Alcarria Conquense(Spain)
Resumo:
The agrifood industry, like other sectors, faces the ongoing challenge of improving their competitiveness in order to strengthen its market presence and cater to the growing global population. This research measures the competitiveness of the agrifood industry in the region of La Alcarria Conquense (Spain), in the framework of the evaluation of programs in the territory that have aimed at improving and enhancing this sector. Through building the competitiveness profiles (Porter, 1990) and cluster analysis we have identified six competitive strategy patterns in food companies in the region. In addition, we have analyzed each of the areas of competitiveness and we can identify the strengths and weaknesses of the sector, and identify recommendations for increasing the responsiveness of the territory. Among the defining characteristics are the lack of association, the limitation on payment systems or virtual absence of training and innovation. However, programs to support the sector are highly valued and reverse in the long-term viability of these companies.
Resumo:
Nowadays, it has become evident the need to seek sustainable development models that address challenges arising in a variety of contexts. The resilience concept appears connected to the ability of people to cope with adversities that inevitably arise due to context dynamics, at different spatial and temporal scales. This concept is related to the model known as Working With People (WWP), focused on rural development projects planning, management and evaluation, from the integration of three dimensions: technical-entrepreneurial, ethical-social and political-contextual. The research reported is part of the RETHINK European Project, whose overall aim is farm modernization and rural resilience. The resilience concept has been analyzed, in the scope of rural development projects management, and a relationship with the WWP model has been established. To this end, a thorough review of the scientific literature concerning this topic has been addressed, in order to develop the state of the art of the different concepts and models involved. A conceptual proposal for the integration of resilience in rural development projects sustainable management, through the three-dimensional WWP model is presented.